X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0395063407003

Well Details

Well ID: 0395063407003
Loading map...
Location: 00/07-34-039-06W5/3
Location Alias: 00/07-34-39-06 W5M
Location Alias 2: 00/07-34-039-06 W5/03
Country: Canada
Province: Alberta
Township: 039
Meridian: 5
Range: 06
Section: 34
County/Municipality: Clearwater County
Well Name: PLR WILLGR 7-34-39-6
Operator Name: Bonavista Energy Corporation
License Number: 0090723
License Date: 1981-06-15
License Status: Issued
Spud Date: 1981-06-26
Final Drill Date: 1981-07-07
Well Total Depth: 2544.60 m
Surface Hole Latitude: 52.397549
Surface Hole Longitude: -114.780490

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1981-06-15 Obtained License
1981-07-07 Finished Drilling
1981-07-07 Kick Occurred
1981-07-07 Well Mode changed to Drilled and Cased
1981-07-09 Production Casing Operation Performed
1981-08-06 Perforation Treatment Performed - Jet Perforation
1981-08-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-08-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-08-15 Perforation Treatment Performed - Fractured
1983-12-10 Well Log Performed
2009-09-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-09-22 Plug Back Performed
2009-09-22 Well Log Performed
2010-08-04 Perforation Treatment Performed - Jet Perforation
2010-08-05 Perforation Treatment Performed - Jet Perforation
2010-08-20 Perforation Treatment Performed - Fractured
2010-11-05 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-08-06 Perforation 2383.00 2386.00 6
2010-08-04 Perforation 2383.00 2386.00 6
2010-08-05 Perforation 2416.00 2420.00 17
2010-08-20 Fracture 2416.00 2420.00 0
1981-08-06 Perforation 2386.00 2390.00 6
1981-08-06 Perforation 2390.50 2393.50 6
1981-08-08 Acid Treatment 2383.00 2393.50 0
1981-08-09 Acid Treatment 2383.00 2393.50 0
1981-08-15 Fracture 2383.00 2393.50 0
2009-09-22 Packing Device Capped w/Cement 2367.00 2375.00 0
2010-08-04 Perforation 2390.50 2393.50 6
2010-08-04 Perforation 2386.00 2390.00 6

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1981-07-07 Kick 2325.00 2325.00

For data sources see[5]

References