If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0395062205000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.394755,"lon":-114.782917,"icon":""}]} |
Location: 00/05-22-039-06W5/0 | |
Location Alias: 00/05-22-39-06 W5M | |
Location Alias 2: 00/05-22-039-06 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 039 | |
Meridian: 5 | |
Range: 06 | |
Section: 22 | |
County/Municipality: Clearwater County | |
Well Name: HARVEST HZ WILLGR 5-22-39-6 | |
Operator Name: Harvest Operations Corp. | |
License Number: 0485416 | |
License Date: 2017-09-13 | |
License Status: Amended | |
Spud Date: 2017-11-30 | |
Final Drill Date: 2017-12-16 | |
Well Total Depth: 5103.00 m | |
Surface Hole Latitude: 52.394755 | |
Surface Hole Longitude: -114.782917 |
Date | Event |
---|---|
2017-09-13 | Obtained License |
2017-12-01 | Surface Casing Operation Performed |
2017-12-03 | Direction Drilling Operation Performed - Deviate |
2017-12-06 | Direction Drilling Operation Performed - Horizontal |
2017-12-08 | Intermediate Casing Operation Performed |
2017-12-16 | Finished Drilling |
2017-12-16 | Well Log Performed |
2017-12-16 | Well Mode changed to Drilled and Cased |
2017-12-17 | Liner Casing Operation Performed |
2017-12-17 | Perforation Treatment Performed - Open-Hole Completion |
2017-12-17 | Well Log Performed |
2017-12-18 | Rig Released |
2018-01-01 | Well Fluid changed to Gas |
2018-01-01 | Well Mode changed to Testing |
2018-01-03 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-02-02 | Well Began Production |
2018-02-02 | Well Fluid changed to Gas |
2018-02-02 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2017-11-30 | Patterson-UTI Drilling Co. Canada | 16E | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2017-12-03 | 1602.20 | Deviate (5 - 79 degrees) |
2017-12-06 | 2706.50 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2017-12-17 | Open Hole/Barefoot Completion | 5061.80 | 5103.00 | 0 |
2018-01-03 | Multi-Stage Fracture | 4322.30 | 4324.30 | 0 |
2018-01-03 | Multi-Stage Fracture | 4224.60 | 4226.50 | 0 |
2018-01-03 | Multi-Stage Fracture | 4139.70 | 4141.60 | 0 |
2018-01-03 | Multi-Stage Fracture | 4042.10 | 4044.10 | 0 |
2018-01-03 | Multi-Stage Fracture | 3947.40 | 3949.30 | 0 |
2018-01-03 | Multi-Stage Fracture | 3866.70 | 3868.60 | 0 |
2018-01-03 | Multi-Stage Fracture | 3763.70 | 3765.60 | 0 |
2018-01-03 | Multi-Stage Fracture | 3670.90 | 3672.90 | 0 |
2018-01-03 | Multi-Stage Fracture | 3586.20 | 3588.10 | 0 |
2018-01-03 | Multi-Stage Fracture | 3490.40 | 3492.30 | 0 |
2018-01-03 | Multi-Stage Fracture | 5034.10 | 5035.10 | 0 |
2018-01-03 | Multi-Stage Fracture | 3396.20 | 3398.10 | 0 |
2018-01-03 | Multi-Stage Fracture | 3301.70 | 3303.60 | 0 |
2018-01-03 | Multi-Stage Fracture | 3209.20 | 3211.10 | 0 |
2018-01-03 | Multi-Stage Fracture | 3125.40 | 3127.30 | 0 |
2018-01-03 | Multi-Stage Fracture | 3039.20 | 3041.10 | 0 |
2018-01-03 | Multi-Stage Fracture | 2954.30 | 2956.20 | 0 |
2018-01-03 | Multi-Stage Fracture | 2878.60 | 2880.50 | 0 |
2018-01-03 | Multi-Stage Fracture | 2795.00 | 2796.90 | 0 |
2018-01-03 | Multi-Stage Fracture | 4963.40 | 4965.30 | 0 |
2018-01-03 | Multi-Stage Fracture | 4879.50 | 4881.40 | 0 |
2018-01-03 | Multi-Stage Fracture | 4781.90 | 4783.80 | 0 |
2018-01-03 | Multi-Stage Fracture | 4685.80 | 4687.70 | 0 |
2018-01-03 | Multi-Stage Fracture | 4601.40 | 4603.30 | 0 |
2018-01-03 | Multi-Stage Fracture | 4503.20 | 4505.10 | 0 |
2018-01-03 | Multi-Stage Fracture | 4406.60 | 4408.50 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2018-01-03 | 2018-01-03 | 2,418 | 5,802 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | N2 | 7727-37-9 | 100 | 2.83 | N/A | |||
water | Not Available | 100 | 79.0759 | N/A | ||||
Prime Plus 30/50 | Trican | hexamethylenetetramine | 100-97-0 | 100 | 1.9226 | N/A | ||
silica crystalline | 14808-60-7 | 100 | 1.9226 | N/A | ||||
Sand 30/50 | Trican | silica crystalline | 14808-60-7 | 100 | 15.9573 | N/A | ||
AQUCAR DB20 | Trican | Bactericide/Biocide | 2.2-dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.0094 | N/A | |
dibromoacetonitrile | 3252-43-5 | 100 | 0.0094 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0094 | N/A | ||||
polyethylene glycol | 25322-68-3 | 100 | 0.0094 | N/A | ||||
sodium bromide | 7647-15-6 | 100 | 0.0094 | N/A | ||||
CC-8 | Trican | Clay Control | choline chloride | 67-48-1 | 100 | 0.1478 | N/A | |
non-hazardous ingredients | Not Available | 100 | 0.1478 | N/A | ||||
FR-22 | Trican | Friction Reducer | alcohols. C10-16. ethoxylated | 68002-97-1 | 100 | 0.0438 | N/A | |
distillates (petroleum). hydrotreated light naphthenic | 64742-53-6 | 100 | 0.0438 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0438 | N/A | ||||
S-17X | Trican | Surfactant | 1-hexanol. 2-ethyl-. manuf. of. by-products from. distn. residues |
68609-68-7 | 100 | 0.0087 | N/A | |
benzenesulfonic acid. dodecyl-. compd. with 2-aminoethanol | 26836-07-7 | 100 | 0.0087 | N/A | ||||
methanol | 67-56-1 | 100 | 0.0087 | N/A | ||||
methyloxirane polymer with oxirane | 11/6/9003 | 100 | 0.0087 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0087 | N/A | ||||
SS-9 | Trican | Surfactant | aminofunctional polymer | 10840 | 100 | 0.0778 | N/A | |
glycol ether | 10840 | 100 | 0.0778 | N/A | ||||
petroleum distillates | 10840 | 100 | 0.0778 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2018-01-01 | 2018-02-05 | Surface Water - Runoff | 5835 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2018 | 7862 | 0.0 | 0.0 | 0.0 |
2019 | 8060 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2017-12-20 | No Incident Encountered | 0.00 | 0.00 |
2018-01-18 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]