X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0395041315000

Well Details

Well ID: 0395041315000
Loading map...
Location: 00/15-13-039-04W5/0
Location Alias: 00/15-13-39-04 W5M
Location Alias 2: 00/15-13-039-04 W5/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 5
Range: 04
Section: 13
County/Municipality: Lacombe County
Well Name: CALPINE MEDR 15-13-39-4
Operator Name: Calpine Canada Resources Company
License Number: 0135547
License Date: 1988-08-12
License Status: RecCertified
Spud Date: 1988-08-24
Final Drill Date: 1988-09-01
Well Total Depth: 2235.00 m
Surface Hole Latitude: 52.362018
Surface Hole Longitude: -114.440878

For data sources see[1][2]

Well History

Date Event
1988-08-12 Obtained License
1988-08-25 Surface Casing Operation Performed
1988-09-01 Finished Drilling
1988-09-01 Well Log Performed
1988-09-01 Well Mode changed to Drilled and Cased
1988-09-03 Production Casing Operation Performed
1988-09-03 Rig Released
1988-09-17 Perforation Treatment Performed - Jet Perforation
1988-09-18 Perforation Treatment Performed - Cement Squeeze
1988-09-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-09-21 Perforation Treatment Performed - Jet Perforation
1988-10-01 Well Began Production
1988-10-01 Well Fluid changed to Crude Oil
1988-10-01 Well Mode changed to Pumping
1988-10-24 Well Fluid changed to Crude Oil
1988-10-24 Well Mode changed to Suspended
1989-06-16 Perforation Treatment Performed - Jet Perforation
1989-06-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-06-22 Well Log Performed
1989-06-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-06-23 Plug Back Performed
1989-06-23 Well Fluid changed to Crude Oil
1989-06-23 Well Mode changed to Abandoned Zone
1992-11-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-11-05 Perforation Treatment Performed - Jet Perforation
1992-11-05 Plug Back Performed
1992-11-06 Perforation Treatment Performed - Remedial Casing
1992-11-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-11-08 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-09-17 Perforation 2198.00 2199.00 13
1992-11-05 Perforation 484.00 484.50 13
1992-11-06 Remedial Casing Cementing 484.00 484.50 0
1992-11-07 Packing Device Capped w/Cement 468.00 486.00 0
1988-09-17 Perforation 2201.50 2202.50 13
1988-09-18 Cement Squeeze 2198.00 2202.50 0
1988-09-21 Perforation 2196.00 2199.00 13
1988-09-21 Acid Treatment 2196.00 2199.00 0
1989-06-16 Perforation 2170.00 2175.00 13
1989-06-17 Acid Treatment 2170.00 2175.00 0
1989-06-23 Packing Device Capped w/Cement 2179.00 2182.00 0
1992-11-05 Packing Device Capped w/Cement 2157.00 2165.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 550 0.0 0.0 0.0

For data sources see[5]

References