If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0395040512002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.328778,"lon":-114.549821,"icon":""}]} |
Location: 00/12-05-039-04W5/2 | |
Location Alias: 00/12-05-39-04 W5M | |
Location Alias 2: 00/12-05-039-04 W5/02 | |
Country: Canada | |
Province: Alberta | |
Township: 039 | |
Meridian: 5 | |
Range: 04 | |
Section: 05 | |
County/Municipality: Clearwater County | |
Well Name: CALPINE MEDICINE RIVER 12-5-39-4 | |
Operator Name: Calpine Canada Resources Company | |
License Number: 0027822 | |
License Date: 1965-02-23 | |
License Status: RecCertified | |
Spud Date: 1965-02-25 | |
Final Drill Date: 1965-03-13 | |
Well Total Depth: 2355.20 m | |
Surface Hole Latitude: 52.328778 | |
Surface Hole Longitude: -114.549821 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1965-02-23 | Obtained License |
1965-03-13 | Finished Drilling |
1965-03-13 | Well Mode changed to Drilled and Cased |
1965-03-14 | Drill Stem Test Performed |
1965-03-15 | Production Casing Operation Performed |
1965-03-22 | Perforation Treatment Performed - Abrasa-Jet Perforation |
1965-03-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1965-03-22 | Perforation Treatment Performed - Nitrogen Treatment |
1965-03-28 | Perforation Treatment Performed - Abrasa-Jet Perforation |
1965-03-29 | Perforation Treatment Performed - Cement Squeeze |
1965-03-31 | Perforation Treatment Performed - Abrasa-Jet Perforation |
1965-04-01 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1965-04-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1965-04-08 | Perforation Treatment Performed - Abrasa-Jet Perforation |
1965-04-08 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1965-04-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1965-06-11 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1990-08-28 | Perforation Treatment Performed - Jet Perforation |
1990-08-28 | Well Log Performed |
1990-08-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1990-09-04 | Perforation Treatment Performed - Fractured |
1990-09-20 | Well Log Performed |
1992-12-04 | Perforation Treatment Performed - Cement Squeeze |
1992-12-10 | Perforation Treatment Performed - Jet Perforation |
1992-12-11 | Well Log Performed |
1992-12-15 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1992-12-16 | Perforation Treatment Performed - Cement Squeeze |
1992-12-21 | Perforation Treatment Performed - Jet Perforation |
1992-12-21 | Well Log Performed |
1992-12-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1992-12-23 | Perforation Treatment Performed - Cement Squeeze |
1993-01-05 | Perforation Treatment Performed - Jet Perforation |
1993-01-12 | Perforation Treatment Performed - Jet Perforation |
1993-01-12 | Well Log Performed |
1993-01-13 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1993-01-26 | Well Began Production |
1993-01-26 | Well Fluid changed to Crude Oil |
1993-01-26 | Well Mode changed to Flowing |
1994-10-05 | Perforation Treatment Performed - Jet Perforation |
1994-10-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1994-10-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1994-10-12 | Plug Back Performed |
1994-10-14 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1994-10-14 | Perforation Treatment Performed - Jet Perforation |
1994-10-14 | Well Abandoned |
1994-10-14 | Well Fluid changed to Crude Oil |
1994-10-14 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1965-03-22 | Hydra Jet Perforation | 2307.90 | 2307.90 | 0 |
1965-04-08 | Packing Device Capped w/Cement | 2281.40 | 2301.20 | 0 |
1965-04-08 | Hydra Jet Perforation | 2259.50 | 2262.50 | 0 |
1965-04-08 | Acid Treatment | 2259.50 | 2259.50 | 0 |
1965-04-08 | Acid Treatment | 2262.50 | 2262.50 | 0 |
1965-06-11 | Packing Device Capped w/Cement | 2281.40 | 2281.40 | 0 |
1990-08-28 | Perforation | 2258.60 | 2264.00 | 20 |
1990-08-29 | Acid Treatment | 2258.60 | 2264.00 | 0 |
1990-09-04 | Fracture | 2258.60 | 2264.00 | 0 |
1992-12-04 | Cement Squeeze | 2258.60 | 2264.00 | 0 |
1992-12-10 | Perforation | 2305.00 | 2309.00 | 20 |
1965-03-22 | Nitrogen Treatment | 2307.90 | 2307.90 | 0 |
1992-12-15 | Acid Treatment | 2305.00 | 2309.00 | 0 |
1992-12-16 | Cement Squeeze | 2305.00 | 2309.00 | 0 |
1992-12-21 | Perforation | 2306.00 | 2309.00 | 20 |
1992-12-22 | Acid Treatment | 2306.00 | 2309.00 | 0 |
1992-12-23 | Cement Squeeze | 2306.00 | 2309.00 | 0 |
1993-01-05 | Perforation | 2307.00 | 2308.00 | 20 |
1993-01-12 | Perforation | 2306.00 | 2310.00 | 20 |
1993-01-13 | Acid Treatment | 2306.00 | 2310.00 | 0 |
1994-10-05 | Perforation | 2284.10 | 2286.60 | 20 |
1994-10-05 | Perforation | 2297.00 | 2299.10 | 20 |
1965-03-22 | Acid Treatment | 2307.90 | 2307.90 | 0 |
1994-10-07 | Acid Treatment | 2284.10 | 2299.10 | 0 |
1994-10-12 | Packing Device Capped w/Cement | 2201.00 | 2310.00 | 0 |
1994-10-14 | Perforation | 481.00 | 481.50 | 14 |
1994-10-14 | Packing Device Capped w/Cement | 465.00 | 497.00 | 0 |
1965-03-28 | Hydra Jet Perforation | 2317.70 | 2317.70 | 0 |
1965-03-29 | Cement Squeeze | 2307.90 | 2307.90 | 0 |
1965-03-29 | Cement Squeeze | 2317.70 | 2317.70 | 0 |
1965-03-31 | Hydra Jet Perforation | 2308.60 | 2308.60 | 0 |
1965-04-01 | Acid Treatment | 2308.60 | 2308.60 | 0 |
1965-04-06 | Acid Treatment | 2308.60 | 2308.60 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1993 | 6428 | 0.0 | 0.0 | 0.0 |
For data sources see[5]