X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0395033306002

Well Details

Well ID: 0395033306002
Loading map...
Location: 00/06-33-039-03W5/2
Location Alias: 00/06-33-39-03 W5M
Location Alias 2: 00/06-33-039-03 W5/02
Country: Canada
Province: Alberta
Township: 039
Meridian: 5
Range: 03
Section: 33
County/Municipality: Lacombe County
Well Name: CVE MEDRIV 6-33-39-3
Operator Name: Cenovus Energy Inc.
License Number: 0021139
License Date: 1961-08-01
License Status: Abandoned
Spud Date: 1961-08-25
Final Drill Date: 1961-09-12
Well Total Depth: 2173.80 m
Surface Hole Latitude: 52.397837
Surface Hole Longitude: -114.376391

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1961-08-01 Obtained License
1961-08-25 Lost Circulation Occurred
1961-09-12 Finished Drilling
1961-09-12 Production Casing Operation Performed
1961-09-14 Drill Stem Test Performed
1961-09-15 Drill Stem Test Performed
1961-09-17 Drill Stem Test Performed
1961-09-23 Perforation Treatment Performed - Jet Perforation
1962-05-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-08-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-08-30 Perforation Treatment Performed - Jet Perforation
1962-09-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-09-02 Perforation Treatment Performed - Cement Squeeze
1962-09-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-06-22 Perforation Treatment Performed - Cement Squeeze
1982-06-25 Perforation Treatment Performed - Jet Perforation
1982-06-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-07-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-07-25 Perforation Treatment Performed - Fractured
1991-07-25 Perforation Treatment Performed - Jet Perforation
1991-07-25 Well Mode changed to Drilled and Cased
1991-08-23 Well Log Performed
1991-09-20 Well Began Production
1991-09-20 Well Fluid changed to Crude Oil
1991-09-20 Well Mode changed to Flowing
1992-03-05 Well Fluid changed to Crude Oil
1992-03-05 Well Mode changed to Pumping
1992-03-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-03-06 Perforation Treatment Performed - Jet Perforation
1992-03-09 Perforation Treatment Performed - Cement Squeeze
1992-03-16 Perforation Treatment Performed - Cement Squeeze
1992-03-17 Perforation Treatment Performed - Fractured
1992-03-17 Perforation Treatment Performed - Jet Perforation
1992-03-17 Well Log Performed
1992-03-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-03-20 Perforation Treatment Performed - Jet Perforation
1992-03-21 Perforation Treatment Performed - Fractured
1994-02-01 Well Fluid changed to Crude Oil
1994-02-01 Well Mode changed to Suspended
1998-10-21 Perforation Treatment Performed - Cement Squeeze
1998-10-21 Plug Back Performed
1998-10-21 Well Fluid changed to Crude Oil
1998-10-21 Well Mode changed to Abandoned Zone
1998-10-22 Perforation Treatment Performed - Jet Perforation
1998-10-24 Perforation Treatment Performed - Cement Squeeze
1998-10-24 Plug Back Performed
1998-10-26 Well Log Performed
1998-11-01 Well Log Performed
1998-11-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-11-03 Perforation Treatment Performed - Jet Perforation
1998-11-04 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-11-19 Well Log Performed
2002-11-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-11-20 Perforation Treatment Performed - Cement Plug
2002-11-20 Plug Back Performed
2002-11-22 Perforation Treatment Performed - Cement Plug
2002-11-24 Perforation Treatment Performed - Cement Plug
2002-11-25 Perforation Treatment Performed - Cement Plug
2002-11-26 Perforation Treatment Performed - Cement Plug
2002-11-28 Perforation Treatment Performed - Cement Plug
2008-08-11 Well Log Performed
2008-08-20 Perforation Treatment Performed - Jet Perforation
2008-08-21 Perforation Treatment Performed - Remedial Casing
2008-08-22 Perforation Treatment Performed - Jet Perforation
2008-08-22 Well Log Performed
2008-08-23 Perforation Treatment Performed - Remedial Casing
2008-09-09 Well Abandoned
2008-09-09 Well Fluid changed to Crude Oil
2008-09-09 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1961-09-23 Perforation 2150.10 2151.60 13
1982-06-26 Acid Treatment 2149.80 2151.30 0
1991-07-25 Perforation 2106.70 2114.40 18
1991-07-25 Fracture 2106.70 2114.40 0
1991-07-25 Packing Device Capped w/Cement 2142.60 2145.60 0
1992-03-06 Perforation 2125.00 2128.00 20
1992-03-06 Acid Treatment 2125.00 2128.00 0
1992-03-09 Cement Squeeze 2125.00 2128.00 0
1992-03-16 Cement Squeeze 2106.70 2114.40 0
1992-03-17 Perforation 2106.70 2110.00 18
1992-03-17 Fracture 2106.70 2110.00 0
1962-05-27 Acid Treatment 2150.10 2151.60 0
1992-03-19 Acid Treatment 2106.70 2110.00 0
1992-03-20 Perforation 2110.00 2114.00 17
1992-03-21 Fracture 2106.70 2114.00 0
1998-10-21 Cement Squeeze 2106.70 2114.00 0
1998-10-22 Perforation 2149.80 2151.30 13
1998-10-24 Cement Squeeze 2149.80 2151.30 0
1998-11-03 Perforation 2144.50 2148.00 14
1998-11-03 Acid Treatment 2144.50 2148.00 0
1998-11-04 Acid Treatment 2144.50 2148.00 0
2002-11-20 Packing Device Capped w/Cement 2125.00 2133.00 0
1962-08-30 Perforation 2152.50 2153.10 13
2002-11-20 Cement Plug 1407.00 1437.00 0
2002-11-22 Cement Plug 1376.00 1422.50 0
2002-11-24 Cement Plug 1078.00 1138.00 0
2002-11-25 Cement Plug 810.00 846.00 0
2002-11-26 Cement Plug 640.00 700.00 0
2002-11-28 Cement Plug 500.00 566.00 0
2008-08-20 Perforation 457.00 458.00 13
2008-08-21 Remedial Casing Cementing 457.00 458.00 0
2008-08-22 Perforation 225.00 226.00 13
2008-08-23 Remedial Casing Cementing 225.00 226.00 0
1962-08-30 Acid Treatment 2152.50 2153.10 0
1962-09-01 Acid Treatment 2152.50 2153.10 0
1962-09-02 Cement Squeeze 2152.50 2153.10 0
1962-09-05 Acid Treatment 2150.10 2151.60 0
1982-06-22 Cement Squeeze 2150.10 2151.60 0
1982-06-25 Perforation 2149.80 2151.30 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1991 1541 0.0 0.0 0.0
1992 657 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1961-08-25 Lost Circulation 0.10 75.00

For data sources see[6]

References