X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0395032814000

Well Details

Well ID: 0395032814000
Loading map...
Location: 00/14-28-039-03W5/0
Location Alias: 00/14-28-39-03 W5M
Location Alias 2: 00/14-28-039-03 W5/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 5
Range: 03
Section: 28
County/Municipality: Lacombe County
Well Name: CVE MEDRIV 14-28-39-3
Operator Name: Cenovus Energy Inc.
License Number: 0017271
License Date: 1959-06-17
License Status: Suspension
Spud Date: 1959-06-30
Final Drill Date: 1959-07-17
Well Total Depth: 2154.90 m
Surface Hole Latitude: 52.390331
Surface Hole Longitude: -114.376416

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1959-06-17 Obtained License
1959-07-17 Finished Drilling
1959-07-17 Well Mode changed to Drilled and Cased
1959-07-18 Drill Stem Test Performed
1959-07-19 Production Casing Operation Performed
1959-07-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-07-23 Perforation Treatment Performed - Bullet Perforation
1959-07-23 Perforation Treatment Performed - Fractured
1959-07-28 Well Began Production
1959-07-28 Well Fluid changed to Crude Oil
1959-07-28 Well Mode changed to Flowing
1974-09-18 Perforation Treatment Performed - Jet Perforation
1974-09-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-09-20 Perforation Treatment Performed - Cement Squeeze
1985-06-06 Well Log Performed
1986-02-13 Perforation Treatment Performed - Jet Perforation
1986-02-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-09-13 Well Fluid changed to Crude Oil
1988-09-13 Well Mode changed to Pumping
1993-08-01 Well Fluid changed to Crude Oil
1993-08-01 Well Mode changed to Suspended
1994-10-28 Well Log Performed
1994-10-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-10-31 Perforation Treatment Performed - Jet Perforation
1994-10-31 Well Log Performed
1994-12-19 Well Fluid changed to Crude Oil
1994-12-19 Well Mode changed to Suspended
2002-11-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-11-15 Plug Back Performed
2002-11-15 Well Log Performed
2003-08-06 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1959-07-23 Bullet Perforation 2135.40 2136.60 7
1994-10-29 Packing Device Capped w/Cement 2122.00 2123.00 0
1994-10-31 Perforation 2100.00 2116.50 13
2002-11-15 Packing Device Capped w/Cement 2093.00 2095.00 0
2003-08-06 Perforation 2100.00 2116.50 13
1959-07-23 Bullet Perforation 2139.10 2140.00 13
1959-07-23 Acid Treatment 2135.40 2140.00 0
1959-07-23 Fracture 2135.40 2140.00 0
1974-09-18 Perforation 2125.40 2125.70 13
1974-09-20 Acid Treatment 2125.40 2125.70 0
1974-09-20 Cement Squeeze 2125.40 2125.70 0
1986-02-13 Perforation 2132.20 2134.20 12
1986-02-14 Acid Treatment 2132.20 2134.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 6213 0.0 0.0 0.0
1968 744 0.0 0.0 0.0
1969 172 0.0 0.0 0.0
1970 5988 0.0 0.0 0.0
1971 1006 0.0 0.0 0.0
1972 4416 0.0 0.0 0.0
1973 3923 0.0 0.0 0.0
1974 4608 0.0 0.0 0.0
1975 5513 0.0 0.0 0.0
1977 483 0.0 0.0 0.0
1978 3832 0.0 0.0 0.0
1979 8559 0.0 0.0 0.0
1980 8783 0.0 0.0 0.0
1981 7879 0.0 0.0 0.0
1982 7840 0.0 0.0 0.0
1983 8096 0.0 0.0 0.0
1984 8118 0.0 0.0 0.0
1985 8415 0.0 0.0 0.0
1986 7811 0.0 0.0 0.0
1987 8715 0.0 0.0 0.0
1988 8385 0.0 0.0 0.0
1989 8611 0.0 0.0 0.0
1990 8705 0.0 0.0 0.0
1991 8732 0.0 0.0 0.0
1992 8783 0.0 0.0 0.0
1993 744 0.0 0.0 0.0

For data sources see[5]

References