X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0395032714002

Well Details

Well ID: 0395032714002
Loading map...
Location: 00/14-27-039-03W5/2
Location Alias: 00/14-27-39-03 W5M
Location Alias 2: 00/14-27-039-03 W5/02
Country: Canada
Province: Alberta
Township: 039
Meridian: 5
Range: 03
Section: 27
County/Municipality: Lacombe County
Well Name: CVE MEDRIV 14-27-39-3
Operator Name: Cenovus Energy Inc.
License Number: 0026083
License Date: 1964-05-11
License Status: Issued
Spud Date: 1964-05-21
Final Drill Date: 1964-06-03
Well Total Depth: 2162.60 m
Surface Hole Latitude: 52.390009
Surface Hole Longitude: -114.353064

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1964-05-11 Obtained License
1964-06-03 Drill Stem Test Performed
1964-06-03 Finished Drilling
1964-06-04 Drill Stem Test Performed
1964-06-05 Drill Stem Test Performed
1964-06-06 Drill Stem Test Performed
1964-06-07 Production Casing Operation Performed
1964-06-16 Perforation Treatment Performed - Jet Perforation
1964-06-17 Perforation Treatment Performed - Acid Wash - No Pressure
1964-07-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-07-08 Perforation Treatment Performed - Selective Jet Perforations
1964-07-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-07-11 Perforation Treatment Performed - Nitrogen Treatment
1970-09-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-09-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1970-09-10 Perforation Treatment Performed - Jet Perforation
1970-09-16 Well Mode changed to Drilled and Cased
1993-12-15 Well Began Production
1993-12-15 Well Fluid changed to Gas
1993-12-15 Well Mode changed to Flowing
1995-11-02 Well Log Performed
1995-11-03 Perforation Treatment Performed - Jet Perforation
1995-11-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-11-07 Well Fluid changed to Gas
1995-11-07 Well Mode changed to Flowing
2003-01-01 Well Fluid changed to Gas
2003-01-01 Well Mode changed to Pumping
2008-07-01 Well Fluid changed to Gas
2008-07-01 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1964-06-16 Perforation 2149.40 2150.70 13
1964-07-11 Nitrogen Treatment 2140.30 2145.80 0
1970-09-10 Packing Device Capped w/Cement 2130.60 2138.20 0
1970-09-10 Perforation 2122.60 2128.10 13
1970-09-10 Acid Treatment 2122.60 2128.10 0
1995-11-03 Perforation 2103.70 2111.70 17
1995-11-06 Acid Treatment 2103.70 2111.70 0
1964-06-17 Acid Wash 2149.40 2150.70 0
1964-07-03 Acid Treatment 2149.40 2150.70 0
1964-07-08 Selective Jet Perforations 2140.30 2140.90 0
1964-07-08 Selective Jet Perforations 2141.50 2142.10 0
1964-07-08 Selective Jet Perforations 2142.70 2143.40 0
1964-07-08 Selective Jet Perforations 2144.00 2144.60 0
1964-07-08 Selective Jet Perforations 2145.20 2145.80 0
1964-07-11 Acid Treatment 2140.30 2145.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 432 0.0 0.0 0.0
1994 7741 0.0 0.0 0.0
1995 7293 0.0 0.0 0.0
1996 7631 0.0 0.0 0.0
1999 2196 0.0 0.0 0.0
2000 8506 0.0 0.0 0.0
2001 8436 0.0 0.0 0.0
2002 8485 0.0 0.0 0.0
2003 8759 0.0 0.0 0.0
2004 8783 0.0 0.0 0.0
2005 8651 0.0 0.0 0.0
2006 8591 0.0 0.0 0.0
2007 8543 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8735 0.0 0.0 0.0
2011 8687 0.0 0.0 0.0
2012 8255 0.0 0.0 0.0
2013 8711 0.0 0.0 0.0
2014 8640 0.0 0.0 0.0
2015 8403 0.0 0.0 0.0
2016 8273 0.0 0.0 0.0
2017 8348 0.0 0.0 0.0
2018 8519 0.0 0.0 0.0
2019 8470 0.0 0.0 0.0
2020 2111 0.0 0.0 0.0

For data sources see[5]

References