If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0395031812002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.357464,"lon":-114.430301,"icon":""}]} |
| Location: 00/12-18-039-03W5/2 | |
| Location Alias: 00/12-18-39-03 W5M | |
| Location Alias 2: 00/12-18-039-03 W5/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 039 | |
| Meridian: 5 | |
| Range: 03 | |
| Section: 18 | |
| County/Municipality: Lacombe County | |
| Well Name: CALPINE MEDRIVER 12-18-39-3 | |
| Operator Name: Calpine Canada Resources Company | |
| License Number: 0025051 | |
| License Date: 1963-10-31 | |
| License Status: RecCertified | |
| Spud Date: 1963-11-02 | |
| Final Drill Date: 1963-11-19 | |
| Well Total Depth: 2249.40 m | |
| Surface Hole Latitude: 52.357464 | |
| Surface Hole Longitude: -114.430301 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1963-10-31 | Obtained License |
| 1963-11-19 | Finished Drilling |
| 1963-11-19 | Well Mode changed to Drilled and Cased |
| 1963-11-21 | Drill Stem Test Performed |
| 1963-11-22 | Production Casing Operation Performed |
| 1963-11-23 | Perforation Treatment Performed - Bullet Perforation |
| 1963-11-26 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1963-11-27 | Perforation Treatment Performed - Fractured |
| 1963-11-28 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1963-11-28 | Perforation Treatment Performed - Fractured |
| 1963-12-05 | Well Began Production |
| 1963-12-05 | Well Fluid changed to Crude Oil |
| 1963-12-05 | Well Mode changed to Flowing |
| 1968-09-04 | Perforation Treatment Performed - Condensate Squeeze |
| 1988-01-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1994-07-05 | Perforation Treatment Performed - Jet Perforation |
| 1994-07-05 | Well Fluid changed to Crude Oil |
| 1994-07-05 | Well Mode changed to Flowing |
| 1994-07-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1996-12-03 | Well Log Performed |
| 1996-12-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1996-12-04 | Plug Back Performed |
| 1996-12-05 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1996-12-05 | Perforation Treatment Performed - Jet Perforation |
| 1996-12-05 | Plug Back Performed |
| 1996-12-05 | Well Fluid changed to Crude Oil |
| 1996-12-05 | Well Mode changed to Abandoned Zone |
| 1996-12-09 | Well Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1963-11-23 | Bullet Perforation | 2167.70 | 2169.30 | 13 |
| 1994-07-07 | Acid Treatment | 2211.20 | 2218.20 | 0 |
| 1996-12-04 | Packing Device Capped w/Cement | 2198.00 | 2206.00 | 0 |
| 1996-12-05 | Packing Device Capped w/Cement | 2177.00 | 2185.00 | 0 |
| 1996-12-05 | Packing Device Capped w/Cement | 2152.00 | 2160.00 | 0 |
| 1996-12-05 | Perforation | 335.50 | 336.00 | 13 |
| 1996-12-05 | Packing Device Capped w/Cement | 322.00 | 338.00 | 0 |
| 1963-11-23 | Bullet Perforation | 2197.60 | 2199.10 | 13 |
| 1963-11-26 | Acid Treatment | 2167.70 | 2169.30 | 0 |
| 1963-11-27 | Fracture | 2167.70 | 2169.30 | 0 |
| 1963-11-28 | Acid Treatment | 2197.60 | 2199.10 | 0 |
| 1963-11-28 | Fracture | 2197.60 | 2199.10 | 0 |
| 1968-09-04 | Condensate Squeeze | 2167.70 | 2169.30 | 0 |
| 1988-01-19 | Acid Treatment | 2197.60 | 2199.10 | 0 |
| 1994-07-05 | Perforation | 2211.20 | 2218.20 | 13 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1963 | 0 | 0.0 | 0.0 | 0.0 |
| 1964 | 0 | 0.0 | 0.0 | 0.0 |
| 1965 | 0 | 0.0 | 0.0 | 0.0 |
| 1966 | 0 | 0.0 | 0.0 | 0.0 |
| 1967 | 4228 | 0.0 | 0.0 | 0.0 |
| 1968 | 6705 | 0.0 | 0.0 | 0.0 |
| 1969 | 4539 | 0.0 | 0.0 | 0.0 |
| 1972 | 3012 | 0.0 | 0.0 | 0.0 |
| 1973 | 8469 | 0.0 | 0.0 | 0.0 |
| 1974 | 8379 | 0.0 | 0.0 | 0.0 |
| 1975 | 5960 | 0.0 | 0.0 | 0.0 |
| 1976 | 6266 | 0.0 | 0.0 | 0.0 |
| 1977 | 5202 | 0.0 | 0.0 | 0.0 |
| 1978 | 4360 | 0.0 | 0.0 | 0.0 |
| 1979 | 4664 | 0.0 | 0.0 | 0.0 |
| 1980 | 8134 | 0.0 | 0.0 | 0.0 |
| 1981 | 8370 | 0.0 | 0.0 | 0.0 |
| 1982 | 6824 | 0.0 | 0.0 | 0.0 |
| 1983 | 7048 | 0.0 | 0.0 | 0.0 |
| 1984 | 7919 | 0.0 | 0.0 | 0.0 |
| 1985 | 8674 | 0.0 | 0.0 | 0.0 |
| 1986 | 8311 | 0.0 | 0.0 | 0.0 |
| 1987 | 8445 | 0.0 | 0.0 | 0.0 |
| 1988 | 7818 | 0.0 | 0.0 | 0.0 |
| 1989 | 8355 | 0.0 | 0.0 | 0.0 |
| 1990 | 8636 | 0.0 | 0.0 | 0.0 |
| 1991 | 7873 | 0.0 | 0.0 | 0.0 |
| 1992 | 5305 | 0.0 | 0.0 | 0.0 |
| 1994 | 744 | 0.0 | 0.0 | 0.0 |
For data sources see[5]