If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0395031506002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.354101,"lon":-114.352093,"icon":""}]} |
Location: 00/06-15-039-03W5/2 | |
Location Alias: 00/06-15-39-03 W5M | |
Location Alias 2: 00/06-15-039-03 W5/02 | |
Country: Canada | |
Province: Alberta | |
Township: 039 | |
Meridian: 5 | |
Range: 03 | |
Section: 15 | |
County/Municipality: Lacombe County | |
Well Name: CVE MEDRIV 6-15-39-3 | |
Operator Name: Cenovus Energy Inc. | |
License Number: 0024647 | |
License Date: 1963-08-08 | |
License Status: Suspension | |
Spud Date: 1963-08-11 | |
Final Drill Date: 1963-08-30 | |
Well Total Depth: 2174.70 m | |
Surface Hole Latitude: 52.354101 | |
Surface Hole Longitude: -114.352093 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1963-08-08 | Obtained License |
1963-08-19 | Drill Stem Test Performed |
1963-08-21 | Drill Stem Test Performed |
1963-08-24 | Drill Stem Test Performed |
1963-08-25 | Drill Stem Test Performed |
1963-08-26 | Drill Stem Test Performed |
1963-08-29 | Drill Stem Test Performed |
1963-08-30 | Finished Drilling |
1963-08-30 | Well Mode changed to Drilled and Cased |
1963-08-31 | Production Casing Operation Performed |
1963-09-06 | Perforation Treatment Performed - Jet Perforation |
1963-09-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1963-09-08 | Perforation Treatment Performed - Fractured |
1979-06-07 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1979-06-07 | Perforation Treatment Performed - Jet Perforation |
1979-06-11 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1979-06-23 | Well Began Production |
1979-06-23 | Well Fluid changed to Crude Oil |
1979-06-23 | Well Mode changed to Pumping |
1979-11-05 | Perforation Treatment Performed - Fractured |
1980-01-04 | Well Fluid changed to Crude Oil |
1980-01-04 | Well Mode changed to Suspended |
1987-06-01 | Well Fluid changed to Crude Oil |
1987-06-01 | Well Mode changed to Pumping |
1999-10-14 | Well Fluid changed to Crude Oil |
1999-10-14 | Well Mode changed to Suspended |
2003-06-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2003-06-19 | Perforation Treatment Performed - Cement Squeeze |
2003-06-22 | Perforation Treatment Performed - Jet Perforation |
2003-06-22 | Well Log Performed |
2003-06-25 | Perforation Treatment Performed - Fractured |
2006-05-01 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1963-09-06 | Perforation | 2135.40 | 2146.40 | 3 |
2003-06-22 | Perforation | 2105.50 | 2110.00 | 17 |
2003-06-25 | Fracture | 2105.50 | 2110.00 | 0 |
1963-09-07 | Acid Treatment | 2135.40 | 2146.40 | 0 |
1963-09-08 | Fracture | 2135.40 | 2146.40 | 0 |
1979-06-07 | Packing Device Capped w/Cement | 2122.70 | 2130.70 | 0 |
1979-06-07 | Perforation | 2072.00 | 2075.10 | 13 |
1979-06-11 | Acid Treatment | 2072.00 | 2075.10 | 0 |
1979-11-05 | Fracture | 2072.00 | 2075.00 | 0 |
2003-06-18 | Acid Treatment | 2072.00 | 2075.10 | 0 |
2003-06-19 | Cement Squeeze | 2072.00 | 2075.10 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1979 | 3514 | 0.0 | 0.0 | 0.0 |
1980 | 72 | 0.0 | 0.0 | 0.0 |
1987 | 4574 | 0.0 | 0.0 | 0.0 |
1988 | 8595 | 0.0 | 0.0 | 0.0 |
1989 | 8551 | 0.0 | 0.0 | 0.0 |
1990 | 8643 | 0.0 | 0.0 | 0.0 |
1991 | 7751 | 0.0 | 0.0 | 0.0 |
1992 | 8418 | 0.0 | 0.0 | 0.0 |
1993 | 8488 | 0.0 | 0.0 | 0.0 |
1994 | 8327 | 0.0 | 0.0 | 0.0 |
1995 | 8342 | 0.0 | 0.0 | 0.0 |
1996 | 7824 | 0.0 | 0.0 | 0.0 |
1997 | 842 | 0.0 | 0.0 | 0.0 |
1998 | 264 | 0.0 | 0.0 | 0.0 |
For data sources see[5]