If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0395030404000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.321406,"lon":-114.382402,"icon":""}]} |
Location: 00/04-04-039-03W5/0 | |
Location Alias: 00/04-04-39-03 W5M | |
Location Alias 2: 00/04-04-039-03 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 039 | |
Meridian: 5 | |
Range: 03 | |
Section: 04 | |
County/Municipality: Lacombe County | |
Well Name: HB MURPHY ARCO MEDR 4-4-39-3 | |
Operator Name: BP Canada Energy Group ULC | |
License Number: 0008628 | |
License Date: 1954-10-26 | |
License Status: RecExempt | |
Spud Date: 1954-11-03 | |
Final Drill Date: 1955-01-20 | |
Well Total Depth: 2729.50 m | |
Surface Hole Latitude: 52.321406 | |
Surface Hole Longitude: -114.382402 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1954-10-26 | Obtained License |
1954-11-27 | Drill Stem Test Performed |
1954-11-29 | Drill Stem Test Performed |
1954-12-01 | Drill Stem Test Performed |
1954-12-03 | Drill Stem Test Performed |
1954-12-06 | Drill Stem Test Performed |
1954-12-07 | Drill Stem Test Performed |
1955-01-20 | Drill Stem Test Performed |
1955-01-20 | Finished Drilling |
1955-01-21 | Production Casing Operation Performed |
1955-01-27 | Perforation Treatment Performed - Bullet Perforation |
1955-01-28 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1955-02-05 | Perforation Treatment Performed - Cement Squeeze |
1955-02-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1955-02-10 | Perforation Treatment Performed - Bullet Perforation |
1955-02-11 | Perforation Treatment Performed - Cement Squeeze |
1955-02-12 | Perforation Treatment Performed - Bullet Perforation |
1955-02-17 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1955-02-19 | Perforation Treatment Performed - Cement Squeeze |
1955-02-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1955-02-20 | Perforation Treatment Performed - Bullet Perforation |
1955-02-20 | Perforation Treatment Performed - Fractured |
1955-02-27 | Perforation Treatment Performed - Cement Squeeze |
1955-03-05 | Perforation Treatment Performed - Bullet Perforation |
1955-03-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1955-03-11 | Perforation Treatment Performed - Bullet Perforation |
1955-03-11 | Perforation Treatment Performed - Fractured |
1955-04-30 | Perforation Treatment Performed - Cement Plug |
1955-05-25 | Well Mode changed to Drilled and Cased |
1961-11-29 | Well Abandoned |
1961-11-29 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1955-01-27 | Bullet Perforation | 2209.20 | 2211.00 | 20 |
1955-02-19 | Cement Squeeze | 2201.90 | 2204.30 | 0 |
1955-02-20 | Bullet Perforation | 2196.10 | 2198.80 | 20 |
1955-02-20 | Bullet Perforation | 2190.30 | 2192.70 | 20 |
1955-02-20 | Acid Treatment | 2190.30 | 2198.80 | 0 |
1955-02-20 | Fracture | 2190.30 | 2198.80 | 0 |
1955-02-27 | Cement Squeeze | 2190.30 | 2198.80 | 0 |
1955-03-05 | Bullet Perforation | 2213.50 | 2214.40 | 13 |
1955-03-10 | Packing Device Capped w/Cement | 2186.60 | 2186.60 | 0 |
1955-03-11 | Bullet Perforation | 2167.70 | 2176.90 | 13 |
1955-03-11 | Fracture | 2167.70 | 2176.90 | 0 |
1955-01-28 | Acid Treatment | 2209.20 | 2211.00 | 0 |
1955-04-30 | Cement Plug | 2148.80 | 2148.80 | 0 |
1955-02-05 | Cement Squeeze | 2209.20 | 2211.00 | 0 |
1955-02-10 | Bullet Perforation | 2209.20 | 2212.80 | 20 |
1955-02-10 | Acid Treatment | 2209.20 | 2212.80 | 0 |
1955-02-11 | Cement Squeeze | 2209.20 | 2212.80 | 0 |
1955-02-12 | Bullet Perforation | 2201.90 | 2204.30 | 20 |
1955-02-17 | Acid Treatment | 2201.90 | 2204.30 | 0 |
1955-02-17 | Acid Treatment | 2201.90 | 2204.30 | 0 |
For data sources see[4]