X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0395012014000

Well Details

Well ID: 0395012014000
Loading map...
Location: 00/14-20-039-01W5/0
Location Alias: 00/14-20-39-01 W5M
Location Alias 2: 00/14-20-039-01 W5/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 5
Range: 01
Section: 20
County/Municipality: Lacombe County
Well Name: CVE PREVO 14-20-39-1
Operator Name: Cenovus Energy Inc.
License Number: 0108360
License Date: 1984-07-23
License Status: RecCertified
Spud Date: 1984-07-28
Final Drill Date: 1984-08-10
Well Total Depth: 1850.00 m
Surface Hole Latitude: 52.374706
Surface Hole Longitude: -114.112325

For data sources see[1][2]

Well History

Date Event
1984-07-23 Obtained License
1984-07-29 Surface Casing Operation Performed
1984-08-10 Finished Drilling
1984-08-10 Well Log Performed
1984-08-10 Well Mode changed to Drilled and Cased
1984-08-11 Well Log Performed
1984-08-12 Production Casing Operation Performed
1984-08-12 Rig Released
1984-10-01 Perforation Treatment Performed - Jet Perforation
1984-10-01 Well Log Performed
1984-10-02 Perforation Treatment Performed - Fractured
1984-10-21 Well Began Production
1984-10-21 Well Fluid changed to Crude Oil
1984-10-21 Well Mode changed to Pumping
1994-08-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-08-23 Perforation Treatment Performed - Jet Perforation
1994-08-23 Plug Back Performed
1994-08-23 Well Log Performed
1994-08-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-08-24 Perforation Treatment Performed - Remedial Casing
1994-08-24 Well Abandoned
1994-08-24 Well Fluid changed to Crude Oil
1994-08-24 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-10-01 Perforation 1812.00 1813.50 13
1984-10-02 Fracture 1812.00 1813.50 0
1994-08-23 Packing Device Capped w/Cement 1797.00 1805.00 0
1994-08-23 Perforation 405.00 405.50 13
1994-08-24 Remedial Casing Cementing 405.00 405.50 0
1994-08-24 Packing Device Capped w/Cement 374.00 390.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 1647 0.0 0.0 0.0
1985 8580 0.0 0.0 0.0
1986 8682 0.0 0.0 0.0
1987 8645 0.0 0.0 0.0
1988 8098 0.0 0.0 0.0
1989 8153 0.0 0.0 0.0
1990 6414 0.0 0.0 0.0
1991 328 0.0 0.0 0.0

For data sources see[5]

References