X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0395010311000

Well Details

Well ID: 0395010311000
Loading map...
Location: 00/11-03-039-01W5/0
Location Alias: 00/11-03-39-01 W5M
Location Alias 2: 00/11-03-039-01 W5/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 5
Range: 01
Section: 03
County/Municipality: Red Deer County
Well Name: AMOCO ET AL C-1 PREVO 11-3-39-1
Operator Name: ConocoPhillips Canada Resources Corp.
License Number: 0059803
License Date: 1976-08-18
License Status: Re-Entered
Spud Date: 1976-08-18
Final Drill Date: 1976-08-30
Well Total Depth: 2057.40 m
Surface Hole Latitude: 52.329567
Surface Hole Longitude: -114.065900

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-08-18 Obtained License
1976-08-30 Finished Drilling
1976-08-31 Drill Stem Test Performed
1976-09-01 Drill Stem Test Performed
1976-09-02 Production Casing Operation Performed
1976-09-14 Perforation Treatment Performed - Jet Perforation
1976-09-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-09-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-09-21 Perforation Treatment Performed - Cement Squeeze
1976-09-22 Perforation Treatment Performed - Jet Perforation
1976-10-04 Well Mode changed to Drilled and Cased
1978-11-13 Well Began Production
1978-11-13 Well Fluid changed to Gas
1978-11-13 Well Mode changed to Flowing
1982-11-01 Well Fluid changed to Gas
1982-11-01 Well Mode changed to Suspended
1988-12-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-12-06 Plug Back Performed
1988-12-06 Well Abandoned
1988-12-06 Well Fluid changed to Gas
1988-12-06 Well Log Performed
1988-12-06 Well Mode changed to Abandoned and Re-entered

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-09-14 Perforation 2003.80 2005.00 7
1976-09-14 Perforation 2010.50 2011.70 7
1976-09-15 Acid Treatment 2003.80 2011.70 0
1976-09-17 Acid Treatment 2003.80 2011.70 0
1976-09-21 Cement Squeeze 2003.80 2011.70 0
1976-09-22 Perforation 1960.80 1962.90 7
1988-12-06 Packing Device Capped w/Cement 1942.00 1950.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1978 1024 0.0 0.0 0.0
1979 4407 0.0 0.0 0.0
1980 4773 0.0 0.0 0.0
1981 4805 0.0 0.0 0.0
1982 576 0.0 0.0 0.0

For data sources see[5]

References