X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394282608020

Well Details

Well ID: 0394282608020
Loading map...
Location: 02/08-26-039-28W4/0
Location Alias: 02/08-26-39-28 W4M
Location Alias 2: 02/08-26-039-28 W4/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 28
Section: 26
County/Municipality: Lacombe County
Well Name: VESTA CYGNET 8-26-39-28
Operator Name: Vesta Energy Ltd.
License Number: 0486232
License Date: 2017-11-14
License Status: Issued
Spud Date: 2017-12-17
Final Drill Date: 2018-01-08
Well Total Depth: 5163.00 m
Surface Hole Latitude: 52.361101
Surface Hole Longitude: -113.925629

For data sources see[1][2]

Well History

Date Event
2017-10-31 Conductor Casing Operation Performed
2017-11-14 Obtained License
2017-12-18 Surface Casing Operation Performed
2017-12-31 Direction Drilling Operation Performed - Deviate
2018-01-03 Direction Drilling Operation Performed - Horizontal
2018-01-08 Finished Drilling
2018-01-08 Well Log Performed
2018-01-08 Well Mode changed to Drilled and Cased
2018-01-10 Production Casing Operation Performed
2018-01-12 Rig Released
2018-04-09 Perforation Treatment Performed - Jet Perforation
2018-04-27 Perforation Treatment Performed - Jet Perforation
2018-04-27 Perforation Treatment Performed - Multi-Stage Fracture
2018-04-28 Perforation Treatment Performed - Jet Perforation
2018-04-28 Perforation Treatment Performed - Multi-Stage Fracture
2018-04-29 Perforation Treatment Performed - Jet Perforation
2018-04-29 Perforation Treatment Performed - Multi-Stage Fracture
2018-04-30 Perforation Treatment Performed - Jet Perforation
2018-04-30 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-01 Perforation Treatment Performed - Jet Perforation
2018-05-02 Perforation Treatment Performed - Jet Perforation
2018-05-02 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-03 Perforation Treatment Performed - Jet Perforation
2018-05-03 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-04 Perforation Treatment Performed - Jet Perforation
2018-05-04 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-05 Perforation Treatment Performed - Jet Perforation
2018-05-05 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-06 Perforation Treatment Performed - Jet Perforation
2018-05-06 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-07 Perforation Treatment Performed - Jet Perforation
2018-05-07 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-08 Perforation Treatment Performed - Jet Perforation
2018-05-08 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-09 Perforation Treatment Performed - Jet Perforation
2018-05-09 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-10 Perforation Treatment Performed - Jet Perforation
2018-05-10 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-11 Perforation Treatment Performed - Jet Perforation
2018-05-11 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-12 Perforation Treatment Performed - Jet Perforation
2018-05-12 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-13 Perforation Treatment Performed - Jet Perforation
2018-05-13 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-14 Perforation Treatment Performed - Jet Perforation
2018-05-14 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-15 Perforation Treatment Performed - Jet Perforation
2018-05-15 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-16 Perforation Treatment Performed - Jet Perforation
2018-05-16 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-17 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-18 Perforation Treatment Performed - Jet Perforation
2018-05-18 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-19 Perforation Treatment Performed - Jet Perforation
2018-05-19 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-20 Perforation Treatment Performed - Jet Perforation
2018-05-20 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-21 Perforation Treatment Performed - Jet Perforation
2018-05-21 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-22 Perforation Treatment Performed - Jet Perforation
2018-05-22 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-23 Perforation Treatment Performed - Jet Perforation
2018-05-23 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-25 Perforation Treatment Performed - Jet Perforation
2018-05-25 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-26 Perforation Treatment Performed - Jet Perforation
2018-05-26 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-27 Perforation Treatment Performed - Jet Perforation
2018-05-27 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-28 Perforation Treatment Performed - Jet Perforation
2018-05-28 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-29 Perforation Treatment Performed - Jet Perforation
2018-05-29 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-30 Perforation Treatment Performed - Jet Perforation
2018-05-30 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-31 Perforation Treatment Performed - Jet Perforation
2018-05-31 Perforation Treatment Performed - Multi-Stage Fracture
2018-07-12 Well Began Production
2018-07-12 Well Fluid changed to Crude Oil
2018-07-12 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-12-17 Bonanza Drilling Inc. 9 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-12-31 760.70 Deviate (5 - 79 degrees)
2018-01-03 2836.20 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-04-09 Perforation 5137.10 5137.30 20
2018-04-27 Perforation 5085.40 5085.60 20
2018-05-07 Perforation 4516.40 4516.60 20
2018-05-07 Perforation 4510.50 4510.70 20
2018-05-08 Multi-Stage Fracture 4510.50 4542.50 0
2018-05-08 Perforation 4503.50 4503.70 20
2018-05-08 Perforation 4497.00 4497.20 20
2018-05-08 Perforation 4490.50 4490.70 20
2018-05-08 Perforation 4484.10 4484.30 20
2018-05-08 Perforation 4477.60 4477.80 20
2018-05-08 Perforation 4471.10 4471.30 20
2018-05-08 Multi-Stage Fracture 4471.10 4503.70 0
2018-04-27 Perforation 5078.90 5079.10 20
2018-05-08 Perforation 4464.70 4464.90 20
2018-05-08 Perforation 4458.20 4458.40 20
2018-05-08 Perforation 4451.00 4451.20 20
2018-05-08 Perforation 4445.30 4445.50 20
2018-05-08 Perforation 4438.80 4439.00 20
2018-05-08 Perforation 4432.30 4432.50 20
2018-05-09 Multi-Stage Fracture 4432.30 4464.90 0
2018-05-09 Perforation 4425.90 4426.10 20
2018-05-09 Perforation 4419.40 4419.60 20
2018-05-09 Perforation 4412.90 4413.10 20
2018-04-27 Perforation 5072.40 5072.60 20
2018-05-09 Perforation 4406.50 4406.70 20
2018-05-09 Perforation 4400.00 4400.20 20
2018-05-09 Perforation 4393.00 4393.20 20
2018-05-10 Multi-Stage Fracture 4393.00 4426.10 0
2018-05-10 Perforation 4387.10 4387.30 20
2018-05-10 Perforation 4376.40 4376.60 20
2018-05-10 Perforation 4365.60 4365.80 20
2018-05-10 Perforation 4354.80 4355.00 20
2018-05-10 Multi-Stage Fracture 4354.80 4387.30 0
2018-05-10 Perforation 4348.30 4348.50 20
2018-04-27 Perforation 5066.00 5066.20 20
2018-05-10 Perforation 4340.30 4340.50 20
2018-05-10 Perforation 4332.30 4332.50 20
2018-05-10 Perforation 4325.00 4325.20 20
2018-05-10 Perforation 4316.00 4316.20 20
2018-05-11 Multi-Stage Fracture 4316.00 4348.50 0
2018-05-11 Perforation 4309.50 4309.70 20
2018-05-11 Perforation 4302.00 4302.20 20
2018-05-11 Perforation 4293.50 4293.70 20
2018-05-11 Perforation 4285.50 4285.70 20
2018-05-11 Perforation 4278.00 4278.20 20
2018-04-27 Perforation 5059.50 5059.70 20
2018-05-12 Multi-Stage Fracture 4278.00 4309.70 0
2018-05-12 Perforation 4270.70 4270.90 20
2018-05-12 Perforation 4262.70 4262.90 20
2018-05-12 Perforation 4255.00 4255.20 20
2018-05-12 Perforation 4246.60 4246.80 20
2018-05-12 Perforation 4238.40 4238.60 20
2018-05-12 Multi-Stage Fracture 4238.40 4270.90 0
2018-05-12 Perforation 4231.90 4232.10 20
2018-05-12 Perforation 4223.90 4224.10 20
2018-05-12 Perforation 4215.90 4216.10 20
2018-04-27 Perforation 5053.00 5053.20 20
2018-05-12 Perforation 4207.00 4207.20 20
2018-05-12 Perforation 4199.60 4199.80 20
2018-05-13 Multi-Stage Fracture 4199.60 4232.10 0
2018-05-13 Perforation 4193.10 4193.30 20
2018-05-13 Perforation 4184.50 4184.70 20
2018-05-13 Perforation 4177.10 4177.30 20
2018-05-13 Perforation 4169.00 4169.20 20
2018-05-13 Perforation 4160.80 4161.00 20
2018-05-13 Multi-Stage Fracture 4160.80 4193.30 0
2018-05-13 Perforation 4154.30 4154.50 20
2018-04-28 Multi-Stage Fracture 5053.00 5085.60 0
2018-05-13 Perforation 4146.30 4146.50 20
2018-05-13 Perforation 4137.80 4138.00 20
2018-05-13 Perforation 4130.30 4130.50 20
2018-05-13 Perforation 4122.00 4122.20 20
2018-05-14 Multi-Stage Fracture 4122.00 4154.50 0
2018-05-14 Perforation 4114.50 4114.70 20
2018-05-14 Perforation 4107.50 4107.70 20
2018-05-14 Perforation 4099.50 4099.70 20
2018-05-14 Perforation 4091.50 4091.70 20
2018-05-14 Perforation 4083.20 4083.40 20
2018-04-28 Perforation 5046.00 5046.20 20
2018-05-15 Multi-Stage Fracture 4083.20 4114.70 0
2018-05-15 Perforation 4075.70 4075.90 20
2018-05-15 Perforation 4067.70 4067.90 20
2018-05-15 Perforation 4059.70 4059.90 20
2018-05-15 Perforation 4051.70 4051.90 20
2018-05-15 Perforation 4044.40 4044.60 20
2018-05-16 Multi-Stage Fracture 4044.40 4075.90 0
2018-05-16 Perforation 4037.90 4038.10 20
2018-05-16 Perforation 4030.50 4030.70 20
2018-05-16 Perforation 4021.90 4022.10 20
2018-04-28 Perforation 5040.10 5040.30 20
2018-05-16 Perforation 4013.90 4014.10 20
2018-05-16 Perforation 4005.60 4005.80 20
2018-05-17 Multi-Stage Fracture 4005.60 4038.10 0
2018-05-18 Perforation 3999.10 3999.30 20
2018-05-18 Perforation 3991.10 3991.30 20
2018-05-18 Perforation 3982.50 3982.70 20
2018-05-18 Perforation 3975.00 3975.20 20
2018-05-18 Perforation 3966.80 3967.00 20
2018-05-18 Multi-Stage Fracture 3966.80 3999.30 0
2018-05-18 Perforation 3959.50 3959.70 20
2018-04-28 Perforation 5033.60 5033.80 20
2018-05-18 Perforation 3952.40 3952.60 20
2018-05-18 Perforation 3944.40 3944.60 20
2018-05-18 Perforation 3935.40 3935.60 20
2018-05-18 Perforation 3928.00 3928.20 20
2018-05-18 Multi-Stage Fracture 3928.00 3959.70 0
2018-05-18 Perforation 3921.60 3921.80 20
2018-05-18 Perforation 3914.50 3914.70 20
2018-05-18 Perforation 3906.00 3906.20 20
2018-05-18 Perforation 3897.50 3897.70 20
2018-05-18 Perforation 3889.20 3889.40 20
2018-04-09 Perforation 5130.60 5130.80 20
2018-04-28 Perforation 5027.20 5027.40 20
2018-05-19 Multi-Stage Fracture 3889.20 3921.80 0
2018-05-19 Perforation 3882.80 3883.00 20
2018-05-19 Perforation 3874.80 3875.00 20
2018-05-19 Perforation 3865.80 3866.00 20
2018-05-19 Perforation 3857.80 3858.00 20
2018-05-19 Perforation 3850.40 3850.60 20
2018-05-19 Multi-Stage Fracture 3850.40 3883.00 0
2018-05-19 Perforation 3843.00 3843.20 20
2018-05-19 Perforation 3835.00 3835.20 20
2018-05-19 Perforation 3827.00 3827.20 20
2018-04-28 Perforation 5020.70 5020.90 20
2018-05-19 Perforation 3819.00 3819.20 20
2018-05-19 Perforation 3811.60 3811.80 20
2018-05-19 Multi-Stage Fracture 3811.60 3843.20 0
2018-05-20 Perforation 3805.20 3805.40 20
2018-05-20 Perforation 3796.50 3796.70 20
2018-05-20 Perforation 3789.20 3789.40 20
2018-05-20 Perforation 3781.10 3781.30 20
2018-05-20 Perforation 3772.80 3773.00 20
2018-05-20 Multi-Stage Fracture 3772.80 3805.40 0
2018-05-20 Perforation 3766.40 3766.60 20
2018-04-28 Perforation 5014.30 5014.50 20
2018-05-20 Perforation 3758.40 3758.60 20
2018-05-20 Perforation 3749.40 3749.60 20
2018-05-20 Perforation 3741.40 3741.60 20
2018-05-20 Perforation 3734.10 3734.30 20
2018-05-20 Multi-Stage Fracture 3734.10 3766.60 0
2018-05-20 Perforation 3726.50 3726.70 20
2018-05-20 Perforation 3719.60 3719.80 20
2018-05-20 Perforation 3711.60 3711.80 20
2018-05-20 Perforation 3703.50 3703.70 20
2018-05-20 Perforation 3695.30 3695.50 20
2018-04-28 Multi-Stage Fracture 5014.30 5046.20 0
2018-05-20 Multi-Stage Fracture 3695.30 3726.70 0
2018-05-21 Perforation 3688.80 3689.00 20
2018-05-21 Perforation 3680.00 3680.20 20
2018-05-21 Perforation 3672.80 3673.00 20
2018-05-21 Perforation 3664.70 3664.90 20
2018-05-21 Perforation 3656.50 3656.70 20
2018-05-21 Multi-Stage Fracture 3656.50 3689.00 0
2018-05-21 Perforation 3650.00 3650.20 20
2018-05-21 Perforation 3642.00 3642.20 20
2018-05-21 Perforation 3633.00 3633.20 20
2018-04-28 Perforation 5007.80 5008.00 20
2018-05-21 Perforation 3625.00 3625.20 20
2018-05-21 Perforation 3617.70 3617.90 20
2018-05-21 Multi-Stage Fracture 3617.70 3650.20 0
2018-05-21 Perforation 3611.20 3611.40 20
2018-05-21 Perforation 3603.20 3603.40 20
2018-05-21 Perforation 3595.20 3595.40 20
2018-05-21 Perforation 3586.20 3586.40 20
2018-05-21 Perforation 3578.90 3579.10 20
2018-05-22 Multi-Stage Fracture 3578.90 3611.40 0
2018-05-22 Perforation 3572.40 3572.60 20
2018-04-28 Perforation 5001.30 5001.50 20
2018-05-22 Perforation 3564.90 3565.10 20
2018-05-22 Perforation 3556.90 3557.10 20
2018-05-22 Perforation 3548.90 3549.10 20
2018-05-22 Perforation 3539.60 3539.80 20
2018-05-22 Multi-Stage Fracture 3539.60 3572.60 0
2018-05-22 Perforation 3533.60 3533.80 20
2018-05-22 Perforation 3526.50 3526.70 20
2018-05-22 Perforation 3517.50 3517.70 20
2018-05-22 Perforation 3509.50 3509.70 20
2018-05-22 Perforation 3501.30 3501.50 20
2018-04-28 Perforation 4994.90 4995.10 20
2018-05-23 Multi-Stage Fracture 3501.30 3533.80 0
2018-05-23 Perforation 3494.80 3495.00 20
2018-05-23 Perforation 3486.80 3487.00 20
2018-05-23 Perforation 3478.00 3478.20 20
2018-05-23 Perforation 3470.00 3470.20 20
2018-05-23 Perforation 3462.50 3462.70 20
2018-05-25 Multi-Stage Fracture 3462.50 3495.00 0
2018-05-25 Perforation 3456.50 3456.70 20
2018-05-25 Perforation 3447.90 3448.10 20
2018-05-25 Perforation 3439.80 3440.00 20
2018-04-28 Perforation 4988.40 4988.60 20
2018-05-25 Perforation 3431.00 3431.20 20
2018-05-25 Perforation 3423.70 3423.90 20
2018-05-25 Multi-Stage Fracture 3423.70 3456.70 0
2018-05-25 Perforation 3417.20 3417.40 20
2018-05-25 Perforation 3409.60 3409.80 20
2018-05-25 Perforation 3401.00 3401.20 20
2018-05-25 Perforation 3392.90 3393.10 20
2018-05-25 Perforation 3384.90 3385.10 20
2018-05-26 Multi-Stage Fracture 3384.90 3417.40 0
2018-05-26 Perforation 3378.40 3378.60 20
2018-04-28 Perforation 4981.90 4982.10 20
2018-05-26 Perforation 3370.00 3370.20 20
2018-05-26 Perforation 3361.00 3361.20 20
2018-05-26 Perforation 3353.50 3353.70 20
2018-05-26 Perforation 3346.10 3346.30 20
2018-05-26 Multi-Stage Fracture 3346.10 3378.60 0
2018-05-26 Perforation 3340.00 3340.20 20
2018-05-26 Perforation 3331.50 3331.70 20
2018-05-26 Perforation 3323.40 3323.60 20
2018-05-26 Perforation 3315.00 3315.20 20
2018-05-26 Perforation 3307.30 3307.50 20
2018-04-28 Perforation 4975.50 4975.70 20
2018-05-26 Multi-Stage Fracture 3307.30 3340.20 0
2018-05-26 Perforation 3300.90 3301.10 20
2018-05-26 Perforation 3293.00 3293.20 20
2018-05-26 Perforation 3285.00 3285.20 20
2018-05-26 Perforation 3277.00 3277.20 20
2018-05-26 Perforation 3268.50 3268.70 20
2018-05-27 Multi-Stage Fracture 3268.50 3301.10 0
2018-05-27 Perforation 3262.10 3262.30 20
2018-05-27 Perforation 3254.00 3254.20 20
2018-05-27 Perforation 3246.50 3246.70 20
2018-04-09 Perforation 5124.20 5124.40 20
2018-04-29 Multi-Stage Fracture 4975.50 5008.00 0
2018-05-27 Perforation 3238.00 3238.20 20
2018-05-27 Perforation 3229.70 3229.90 20
2018-05-27 Multi-Stage Fracture 3229.70 3262.30 0
2018-05-27 Perforation 3223.50 3223.70 20
2018-05-27 Perforation 3215.20 3215.40 20
2018-05-27 Perforation 3207.10 3207.30 20
2018-05-27 Perforation 3198.60 3198.80 20
2018-05-27 Perforation 3190.90 3191.10 20
2018-05-27 Multi-Stage Fracture 3190.90 3223.70 0
2018-05-27 Perforation 3184.50 3184.70 20
2018-04-29 Perforation 4969.00 4969.20 20
2018-05-27 Perforation 3175.50 3175.70 20
2018-05-27 Perforation 3168.30 3168.50 20
2018-05-27 Perforation 3160.20 3160.40 20
2018-05-27 Perforation 3152.10 3152.30 20
2018-05-28 Multi-Stage Fracture 3152.10 3184.70 0
2018-05-28 Perforation 3145.70 3145.90 20
2018-05-28 Perforation 3137.60 3137.80 20
2018-05-28 Perforation 3129.00 3129.20 20
2018-05-28 Perforation 3121.40 3121.60 20
2018-05-28 Perforation 3113.40 3113.60 20
2018-04-29 Perforation 4962.50 4962.70 20
2018-05-28 Multi-Stage Fracture 3113.40 3145.90 0
2018-05-29 Perforation 3106.00 3106.20 20
2018-05-29 Perforation 3098.80 3099.00 20
2018-05-29 Perforation 3090.70 3090.90 20
2018-05-29 Perforation 3082.60 3082.80 20
2018-05-29 Perforation 3074.60 3074.80 20
2018-05-29 Multi-Stage Fracture 3074.60 3106.20 0
2018-05-29 Perforation 3067.80 3068.00 20
2018-05-29 Perforation 3059.50 3059.70 20
2018-05-29 Perforation 3051.90 3052.10 20
2018-04-29 Perforation 4956.10 4956.30 20
2018-05-29 Perforation 3043.80 3044.00 20
2018-05-29 Perforation 3035.80 3036.00 20
2018-05-29 Multi-Stage Fracture 3035.80 3068.00 0
2018-05-29 Perforation 3029.30 3029.50 20
2018-05-29 Perforation 3021.20 3021.40 20
2018-05-29 Perforation 3013.10 3013.30 20
2018-05-29 Perforation 3005.00 3005.20 20
2018-05-29 Perforation 2997.00 2997.20 20
2018-05-30 Multi-Stage Fracture 2997.00 3029.50 0
2018-05-30 Perforation 2990.50 2990.70 20
2018-04-29 Perforation 4949.60 4949.80 20
2018-05-30 Perforation 2982.40 2982.60 20
2018-05-30 Perforation 2974.30 2974.50 20
2018-05-30 Perforation 2966.20 2966.40 20
2018-05-30 Perforation 2958.20 2958.40 20
2018-05-30 Multi-Stage Fracture 2958.20 2990.70 0
2018-05-30 Perforation 2951.70 2951.90 20
2018-05-30 Perforation 2943.60 2943.80 20
2018-05-30 Perforation 2935.50 2935.70 20
2018-05-30 Perforation 2927.40 2927.60 20
2018-05-30 Perforation 2920.00 2920.20 20
2018-04-29 Perforation 4943.10 4943.30 20
2018-05-30 Multi-Stage Fracture 2920.00 2951.90 0
2018-05-30 Perforation 2912.90 2913.10 20
2018-05-30 Perforation 2904.80 2905.00 20
2018-05-30 Perforation 2896.70 2896.90 20
2018-05-30 Perforation 2888.60 2888.80 20
2018-05-30 Perforation 2880.60 2880.80 20
2018-05-31 Multi-Stage Fracture 2880.60 2913.10 0
2018-05-31 Perforation 2874.10 2874.30 20
2018-05-31 Perforation 2866.40 2866.60 20
2018-05-31 Perforation 2857.90 2858.10 20
2018-04-29 Perforation 4936.70 4936.90 20
2018-05-31 Perforation 2849.80 2850.00 20
2018-05-31 Perforation 2841.80 2842.00 20
2018-05-31 Multi-Stage Fracture 2841.80 2874.30 0
2018-05-31 Perforation 2835.30 2835.50 20
2018-05-31 Perforation 2827.20 2827.40 20
2018-05-31 Perforation 2819.10 2819.30 20
2018-05-31 Perforation 2811.00 2811.20 20
2018-05-31 Perforation 2803.00 2803.20 20
2018-05-31 Multi-Stage Fracture 2803.00 2835.50 0
2018-04-29 Multi-Stage Fracture 4936.70 4969.20 0
2018-04-30 Perforation 4929.50 4929.70 20
2018-04-30 Perforation 4923.70 4923.90 20
2018-04-09 Perforation 5117.70 5117.90 20
2018-04-30 Perforation 4917.30 4917.50 20
2018-04-30 Perforation 4910.80 4911.00 20
2018-04-30 Perforation 4904.30 4904.50 20
2018-04-30 Perforation 4897.90 4898.10 20
2018-04-30 Multi-Stage Fracture 4897.90 4929.70 0
2018-04-30 Perforation 4891.40 4891.60 20
2018-04-30 Perforation 4885.00 4885.20 20
2018-04-30 Perforation 4878.50 4878.70 20
2018-04-30 Perforation 4872.00 4872.20 20
2018-04-30 Perforation 4865.50 4865.70 20
2018-04-09 Perforation 5111.20 5111.40 20
2018-04-30 Perforation 4859.10 4859.30 20
2018-04-30 Multi-Stage Fracture 4859.10 4891.60 0
2018-05-01 Perforation 4852.60 4852.80 20
2018-05-01 Perforation 4846.10 4846.30 20
2018-05-01 Perforation 4839.70 4839.90 20
2018-05-01 Perforation 4833.20 4833.40 20
2018-05-01 Perforation 4827.00 4827.20 20
2018-05-01 Perforation 4820.30 4820.50 20
2018-05-02 Multi-Stage Fracture 4820.30 4852.80 0
2018-05-02 Perforation 4813.80 4814.00 20
2018-04-09 Perforation 5104.80 5105.00 20
2018-05-02 Perforation 4807.40 4807.60 20
2018-05-02 Perforation 4800.90 4801.10 20
2018-05-02 Perforation 4794.40 4794.60 20
2018-05-02 Perforation 4788.00 4788.20 20
2018-05-02 Perforation 4781.50 4781.70 20
2018-05-03 Multi-Stage Fracture 4781.50 4814.00 0
2018-05-03 Perforation 4775.00 4775.20 20
2018-05-03 Perforation 4764.30 4764.50 20
2018-05-03 Perforation 4753.50 4753.70 20
2018-05-03 Perforation 4742.70 4742.90 20
2018-04-09 Perforation 5098.30 5098.50 20
2018-05-04 Multi-Stage Fracture 4742.70 4775.20 0
2018-05-04 Perforation 4736.20 4736.40 20
2018-05-04 Perforation 4725.50 4725.70 20
2018-05-04 Perforation 4714.70 4714.90 20
2018-05-04 Perforation 4703.90 4704.10 20
2018-05-04 Multi-Stage Fracture 4703.90 4736.40 0
2018-05-04 Perforation 4697.40 4697.60 20
2018-05-04 Perforation 4686.00 4686.20 20
2018-05-04 Perforation 4674.50 4674.70 20
2018-05-04 Perforation 4665.10 4665.30 20
2018-04-09 Perforation 5091.80 5092.00 20
2018-05-05 Multi-Stage Fracture 4665.10 4697.60 0
2018-05-05 Perforation 4658.60 4658.80 20
2018-05-05 Perforation 4647.90 4648.10 20
2018-05-05 Perforation 4637.10 4637.30 20
2018-05-05 Perforation 4626.30 4626.50 20
2018-05-06 Multi-Stage Fracture 4626.30 4658.80 0
2018-05-06 Perforation 4619.80 4620.00 20
2018-05-06 Perforation 4609.10 4609.30 20
2018-05-06 Perforation 4598.30 4598.50 20
2018-05-06 Perforation 4587.50 4587.70 20
2018-04-27 Multi-Stage Fracture 5091.80 5137.30 0
2018-05-06 Multi-Stage Fracture 4587.50 4620.00 0
2018-05-06 Perforation 4581.10 4581.30 20
2018-05-06 Perforation 4570.40 4570.60 20
2018-05-06 Perforation 4559.60 4559.80 20
2018-05-06 Perforation 4548.70 4548.90 20
2018-05-07 Multi-Stage Fracture 4548.70 4581.30 0
2018-05-07 Perforation 4542.30 4542.50 20
2018-05-07 Perforation 4535.80 4536.00 20
2018-05-07 Perforation 4529.80 4530.00 20
2018-05-07 Perforation 4522.90 4523.10 20

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-04-27 2018-05-31 2,507 71,802 N/A
2 2018-04-27 2018-05-28 2,507 0 N/A
3 2018-05-02 2018-05-31 2,507 0 N/A
4 2018-05-02 2018-05-02 2,507 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 91.9066 N/A
50/140 Sand (Domestic) Calfrac Crystalline silica (Quartz) 14808-60-7 100 7.0063 N/A
SaniFrac 8844 Calfrac Bactericide/Biocide Acetamide. 2.2-dibromo-2-cyano 10222-01-2 100 0.0378 N/A
Acetonitrile. 2.2-dibromo 3252-43-5 100 0.0378 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0378 N/A
Polyethylene glycol 25322-68-3 100 0.0378 N/A
Sodium bromide 7647-15-6 100 0.0378 N/A
DWP-690 Calfrac Breaker Hydrogen peroxide 7722-84-1 100 0.0484 N/A
Water 7732-18-5 100 0.0484 N/A
DWP-641 Calfrac Friction Reducer Ammonium chloride 12125-02-9 100 0.1966 N/A
Distillates (petroleum). hydrotreated light 64742-47-8 100 0.1966 N/A
Non-Hazardous Ingredients Trade Secret 100 0.1966 N/A
CalSurf 9400 Calfrac Surfactant Ethoxylated Alcohols Trade Secret 100 0.0089 N/A
Methanol 67-56-1 100 0.0089 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0089 N/A
2 15% HCl Calfrac Acid Hydrochloric acid 7647-01-0 100 0.916 N/A
Water 7732-18-5 100 0.916 N/A
CI-9100G Calfrac Corrosion Inhibitor Alcohols. C12-15. ethoxylated 68131-39-5 100 0.0004 N/A
Cinnamaldehyde 104-55-2 100 0.0004 N/A
Dipropylene glycol monomethyl ether 34590-94-8 100 0.0004 N/A
Ethylene Glycol 107-21-1 100 0.0004 N/A
Formic acid 64-18-6 100 0.0004 N/A
Isopropyl alcohol 67-63-0 100 0.0004 N/A
Tar bases. quinoline derivs. 68513-87-1 100 0.0004 N/A
Tar bases. quinolone derivs.. benzyl chloride-quarternized 72480-70-7 100 0.0004 N/A
3 7.5% HCl Calfrac Acid Hydrochloric acid 7647-01-0 100 0.0008 N/A
Water 7732-18-5 100 0.0008 N/A
4 DWP-107 Calfrac Buffer Non-Hazardous Ingredients Trade Secret 100 0.0089 N/A
Organic acid 8454 100 0.0089 N/A
DWP-126 Calfrac Crosslinker Borate Salt #1 9033 100 0.0074 N/A
Borate Salt #2 9033 100 0.0074 N/A
Water 7732-18-5 100 0.0074 N/A
DWP-101 Calfrac Gelling Agent Guar gum 9000-30-0 100 0.0243 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0243 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-05-02 2018-05-24 Surface Water - River 20968
2018-04-27 2018-05-23 Surface Water - River 27800
2018-04-20 2018-05-29 Surface Water - Runoff 18202
2018-05-02 2018-05-29 Oilfield Produced Water 1597
2018-05-08 2018-05-22 Oilfield Produced Water 34
2018-05-14 2018-05-27 Oilfield Produced Water 54
2018-05-02 2018-05-27 Oilfield Produced Water 86
2018-05-01 2018-05-29 Oilfield Produced Water 1302
2018-05-01 2018-05-29 Oilfield Produced Water 630
2018-05-03 2018-05-08 Oilfield Produced Water 27
2018-05-22 2018-05-26 Oilfield Produced Water 136

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 4117 0.0 0.0 0.0
2019 8160 0.0 0.0 0.0
2020 2162 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-12-17 No Incident Encountered 0.00 0.00
2018-05-31 No Incident Encountered 0.00 0.00

For data sources see[10]

References