X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394263203000

Well Details

Well ID: 0394263203000
Loading map...
Location: 00/03-32-039-26W4/0
Location Alias: 00/03-32-39-26 W4M
Location Alias 2: 00/03-32-039-26 W4/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 26
Section: 32
County/Municipality: Lacombe County
Well Name: ALTANA ET AL JOFFRE 3-32-39-26
Operator Name: Altana Exploration Company
License Number: 0111624
License Date: 1984-12-12
License Status: Re-Entered
Spud Date: 1984-12-19
Final Drill Date: 1985-01-06
Well Total Depth: 2120.00 m
Surface Hole Latitude: 52.391965
Surface Hole Longitude: -113.713754

For data sources see[1][2]

Well History

Date Event
1984-12-12 Obtained License
1984-12-21 Surface Casing Operation Performed
1985-01-05 Drill Stem Test Performed
1985-01-06 Finished Drilling
1985-01-07 Well Log Performed
1985-01-08 Production Casing Operation Performed
1985-01-09 Rig Released
1985-02-07 Well Log Performed
1985-02-09 Perforation Treatment Performed - Jet Perforation
1985-02-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-06-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-06-28 Perforation Treatment Performed - Jet Perforation
1985-07-02 Well Log Performed
1985-07-12 Well Log Performed
1985-07-13 Well Log Performed
1985-07-14 Perforation Treatment Performed - Jet Perforation
1985-07-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-07-16 Plug Back Performed
1985-07-16 Well Abandoned
1985-07-16 Well Log Performed
1985-07-16 Well Mode changed to Abandoned
1985-07-17 Well Mode changed to Abandoned and Re-entered

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-02-09 Perforation 2078.50 2085.00 13
1985-02-12 Acid Treatment 2078.50 2085.00 0
1985-06-27 Packing Device Capped w/Cement 2066.80 2074.80 0
1985-06-28 Perforation 1667.40 1668.80 13
1985-07-14 Perforation 1700.50 1703.00 13
1985-07-16 Packing Device Capped w/Cement 1681.00 1689.00 0
1985-07-16 Packing Device Capped w/Cement 1642.00 1650.00 0

For data sources see[4]



References