X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394262215000

Well Details

Well ID: 0394262215000
Loading map...
Location: 00/15-22-039-26W4/0
Location Alias: 00/15-22-39-26 W4M
Location Alias 2: 00/15-22-039-26 W4/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 26
Section: 22
County/Municipality: Lacombe County
Well Name: TANAGER JOFFRE 15-22-39-26
Operator Name: Paleo Resources, Inc.
License Number: 0120039
License Date: 1985-12-04
License Status: Suspension
Spud Date: 1985-12-08
Final Drill Date: 1985-12-24
Well Total Depth: 2366.00 m
Surface Hole Latitude: 52.372554
Surface Hole Longitude: -113.658769

For data sources see[1][2]

Well History

Date Event
1985-12-04 Obtained License
1985-12-08 Lost Circulation Occurred
1985-12-09 Lost Circulation Occurred
1985-12-10 Surface Casing Operation Performed
1985-12-24 Finished Drilling
1985-12-24 Well Log Performed
1985-12-24 Well Mode changed to Drilled and Cased
1985-12-25 Well Log Performed
1985-12-27 Drill Stem Test Performed
1985-12-29 Production Casing Operation Performed
1985-12-29 Rig Released
1986-06-07 Well Log Performed
1986-06-08 Well Log Performed
1986-06-09 Perforation Treatment Performed - Jet Perforation
1986-06-09 Well Began Production
1986-06-09 Well Fluid changed to Crude Oil
1986-06-09 Well Mode changed to Flowing
1986-06-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-06-13 Well Log Performed
1986-06-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-06-14 Perforation Treatment Performed - Jet Perforation
1987-06-30 Well Log Performed
1988-09-09 Well Fluid changed to Crude Oil
1988-09-09 Well Mode changed to Pumping
1989-04-06 Well Log Performed
1989-04-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-04-07 Perforation Treatment Performed - Jet Perforation
1989-04-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-04-13 Well Began Injection
1989-04-13 Well Fluid changed to Solvent
1989-04-13 Well Type changed to Injection
1990-06-09 Perforation Treatment Performed - Jet Perforation
1990-06-10 Well Log Performed
1990-06-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-06-15 Well Log Performed
1992-05-25 Well Fluid changed to Gas
1992-05-25 Well Type changed to Injection
1992-07-21 Well Log Performed
1992-08-12 Perforation Treatment Performed - Jet Perforation
1992-08-13 Well Log Performed
1992-08-15 Perforation Treatment Performed - Cement Squeeze
1992-08-18 Perforation Treatment Performed - Jet Perforation
1992-08-18 Well Log Performed
1992-08-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-08-23 Well Fluid changed to Crude Oil
1992-08-23 Well Log Performed
1992-08-23 Well Mode changed to Flowing
1992-09-22 Well Log Performed
1992-09-26 Perforation Treatment Performed - Cement Squeeze
1992-10-08 Well Log Performed
1992-10-09 Perforation Treatment Performed - Jet Perforation
1992-10-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-12-12 Well Log Performed
1993-04-18 Perforation Treatment Performed - Jet Perforation
1993-04-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-04-13 Well Log Performed
1995-12-02 Perforation Treatment Performed - Acid Wash - No Pressure
1995-12-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-12-18 Perforation Treatment Performed - Jet Perforation
1995-12-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-11-01 Well Fluid changed to Crude Oil
1996-11-01 Well Mode changed to Suspended
1998-03-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-03-05 Plug Back Performed
1998-03-05 Well Fluid changed to Crude Oil
1998-03-05 Well Mode changed to Abandoned and Whipstocked
2004-05-21 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1986-06-09 Perforation 2150.00 2155.00 13
1990-06-12 Acid Treatment 2121.00 2125.00 0
1992-08-12 Perforation 2138.50 2145.00 13
1992-08-12 Perforation 2150.00 2155.00 13
1992-08-12 Perforation 2158.00 2161.60 13
1992-08-15 Cement Squeeze 2107.50 2161.60 0
1992-08-18 Perforation 2171.50 2176.50 13
1992-08-22 Acid Treatment 2171.50 2176.50 0
1992-09-26 Cement Squeeze 2171.50 2176.50 0
1992-10-09 Perforation 2166.00 2170.00 13
1992-10-11 Acid Treatment 2166.00 2170.00 0
1986-06-10 Acid Treatment 2150.00 2155.00 0
1993-04-18 Perforation 2170.00 2174.60 13
1993-04-19 Acid Treatment 2166.00 2174.60 0
1995-12-02 Acid Wash 2166.00 2174.60 0
1995-12-09 Acid Treatment 2166.00 2174.60 0
1995-12-18 Perforation 2175.50 2177.00 16
1995-12-18 Perforation 2178.00 2179.00 16
1995-12-23 Acid Treatment 2175.50 2179.00 0
1998-03-05 Packing Device Capped w/Cement 2052.00 2102.00 0
1986-06-14 Perforation 2158.00 2161.60 13
1986-06-14 Perforation 2138.50 2145.00 13
1986-06-14 Acid Treatment 2138.50 2161.60 0
1989-04-07 Packing Device Capped w/Cement 2131.50 2133.00 0
1989-04-07 Perforation 2107.50 2111.00 13
1989-04-08 Acid Treatment 2107.50 2111.00 0
1990-06-09 Perforation 2121.00 2125.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1986 4088 0.0 0.0 0.0
1987 8353 0.0 0.0 0.0
1988 5769 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 509 0.0 0.0 0.0
1993 6340 0.0 0.0 0.0
1994 7415 0.0 0.0 0.0
1995 3300 0.0 0.0 0.0
1996 4066 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1985-12-08 Lost Circulation 140.00 140.00
1985-12-09 Lost Circulation 374.00 374.00

For data sources see[6]

References