If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0394261901000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.362758,"lon":-113.72638,"icon":""}]} |
| Location: 00/01-19-039-26W4/0 | |
| Location Alias: 00/01-19-39-26 W4M | |
| Location Alias 2: 00/01-19-039-26 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 039 | |
| Meridian: 4 | |
| Range: 26 | |
| Section: 19 | |
| County/Municipality: Lacombe County | |
| Well Name: NALR D2AUNIT JOFFRE 1-19-39-26 | |
| Operator Name: NAL Resources Limited | |
| License Number: 0014329 | |
| License Date: 1957-11-28 | |
| License Status: RecCertified | |
| Spud Date: 1957-12-14 | |
| Final Drill Date: 1958-01-17 | |
| Well Total Depth: 2105.90 m | |
| Surface Hole Latitude: 52.362758 | |
| Surface Hole Longitude: -113.726380 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1957-11-28 | Obtained License |
| 1957-12-29 | Lost Circulation Occurred |
| 1958-01-04 | Drill Stem Test Performed |
| 1958-01-17 | Finished Drilling |
| 1958-01-17 | Well Mode changed to Drilled and Cased |
| 1958-01-18 | Perforation Treatment Performed - Open-Hole Completion |
| 1958-01-18 | Production Casing Operation Performed |
| 1958-02-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1958-02-12 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1958-03-07 | Well Began Production |
| 1958-03-07 | Well Fluid changed to Crude Oil |
| 1958-03-07 | Well Mode changed to Pumping |
| 1960-05-11 | Perforation Treatment Performed - Fractured |
| 1961-09-05 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1961-10-20 | Perforation Treatment Performed - Fractured |
| 1963-07-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1985-10-05 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1985-10-05 | Plug Back Performed |
| 1985-10-05 | Well Fluid changed to Crude Oil |
| 1985-10-05 | Well Log Performed |
| 1985-10-05 | Well Mode changed to Suspended |
| 1988-03-15 | Well Log Performed |
| 1992-02-27 | Well Abandoned |
| 1992-02-27 | Well Fluid changed to Crude Oil |
| 1992-02-27 | Well Mode changed to Abandoned |
| 1992-07-27 | Perforation Treatment Performed - Cement Plug |
| 1992-07-27 | Perforation Treatment Performed - Jet Perforation |
| 1992-07-27 | Perforation Treatment Performed - Remedial Casing |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1958-01-18 | Open Hole/Barefoot Completion | 2102.20 | 2105.90 | 0 |
| 1992-07-27 | Remedial Casing Cementing | 202.00 | 202.50 | 0 |
| 1992-07-27 | Cement Plug | 144.50 | 184.50 | 0 |
| 1958-02-10 | Acid Treatment | 2102.20 | 2105.90 | 0 |
| 1958-02-12 | Acid Treatment | 2102.20 | 2105.90 | 0 |
| 1960-05-11 | Fracture | 2074.20 | 2083.30 | 0 |
| 1961-09-05 | Acid Treatment | 2102.20 | 2105.90 | 0 |
| 1961-10-20 | Fracture | 2102.20 | 2105.90 | 0 |
| 1963-07-22 | Acid Treatment | 2102.20 | 2105.90 | 0 |
| 1985-10-05 | Packing Device Capped w/Cement | 2030.00 | 2042.00 | 0 |
| 1992-07-27 | Perforation | 202.00 | 202.50 | 13 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1961 | 0 | 0.0 | 0.0 | 0.0 |
| 1962 | 0 | 0.0 | 0.0 | 0.0 |
| 1963 | 0 | 0.0 | 0.0 | 0.0 |
| 1964 | 0 | 0.0 | 0.0 | 0.0 |
| 1965 | 0 | 0.0 | 0.0 | 0.0 |
| 1966 | 0 | 0.0 | 0.0 | 0.0 |
| 1967 | 744 | 0.0 | 0.0 | 0.0 |
| 1968 | 1012 | 0.0 | 0.0 | 0.0 |
| 1969 | 4680 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 1957-12-29 | Lost Circulation | 1622.80 | 1629.20 |
For data sources see[6]