X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394261403000

Well Details

Well ID: 0394261403000
Loading map...
Location: 00/03-14-039-26W4/0
Location Alias: 00/03-14-39-26 W4M
Location Alias 2: 00/03-14-039-26 W4/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 26
Section: 14
County/Municipality: Lacombe County
Well Name: CNRL JOFFRE 3-14-39-26
Operator Name: Canadian Natural Resources Limited
License Number: 0386193
License Date: 2007-12-03
License Status: Amended
Spud Date: 2008-01-23
Final Drill Date: 2008-01-24
Well Total Depth: 690.00 m
Surface Hole Latitude: 52.349647
Surface Hole Longitude: -113.647892

For data sources see[1][2]

Well History

Date Event
2007-12-03 Obtained License
2008-01-23 Surface Casing Operation Performed
2008-01-24 Direction Drilling Operation Performed - Deviate
2008-01-24 Finished Drilling
2008-01-24 Well Mode changed to Drilled and Cased
2008-01-25 Production Casing Operation Performed
2008-01-25 Rig Released
2008-01-26 Well Log Performed
2008-02-25 Perforation Treatment Performed - Jet Perforation
2008-02-25 Well Log Performed
2008-03-04 Perforation Treatment Performed - Fractured
2008-08-01 Well Began Production
2008-08-01 Well Fluid changed to Coalbed Methane-Coals Only
2008-08-01 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2008-01-24 83.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2008-02-25 Perforation 282.00 282.50 13
2008-02-25 Perforation 568.10 568.50 13
2008-02-25 Perforation 597.20 597.50 13
2008-02-25 Perforation 599.50 599.90 13
2008-02-25 Perforation 616.40 618.70 7
2008-02-25 Perforation 626.90 627.30 13
2008-02-25 Perforation 628.80 629.40 13
2008-02-25 Perforation 636.60 636.90 13
2008-02-25 Perforation 658.80 659.40 13
2008-02-25 Perforation 660.00 660.60 13
2008-02-25 Perforation 661.80 662.00 13
2008-02-25 Perforation 285.90 286.30 13
2008-02-25 Perforation 663.00 663.40 13
2008-02-25 Perforation 664.20 664.70 13
2008-02-25 Perforation 674.90 675.20 13
2008-02-25 Perforation 676.80 677.00 13
2008-03-04 Fracture 282.00 677.00 0
2008-02-25 Perforation 294.00 296.30 7
2008-02-25 Perforation 300.60 301.10 13
2008-02-25 Perforation 310.90 312.00 13
2008-02-25 Perforation 430.40 431.00 13
2008-02-25 Perforation 443.00 443.40 13
2008-02-25 Perforation 469.00 469.60 13
2008-02-25 Perforation 548.10 548.80 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2008 3638 0.0 0.0 0.0
2009 8587 0.0 0.0 0.0
2010 8555 0.0 0.0 0.0
2011 8593 0.0 0.0 0.0
2012 8652 0.0 0.0 0.0
2013 8691 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8781 0.0 0.0 0.0
2017 8687 0.0 0.0 0.0
2018 8735 0.0 0.0 0.0
2019 8184 0.0 0.0 0.0
2020 2174 0.0 0.0 0.0

For data sources see[6]

References