If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0394252916000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.388619,"lon":-113.55802,"icon":""}]} |
Location: 00/16-29-039-25W4/0 | |
Location Alias: 00/16-29-39-25 W4M | |
Location Alias 2: 00/16-29-039-25 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 039 | |
Meridian: 4 | |
Range: 25 | |
Section: 29 | |
County/Municipality: Lacombe County | |
Well Name: CPC RESOURCES LACOMBE 16-29-39-25 | |
Operator Name: Lynx Energy ULC | |
License Number: 0319296 | |
License Date: 2004-11-19 | |
License Status: Issued | |
Spud Date: 2005-01-20 | |
Final Drill Date: 2005-01-21 | |
Well Total Depth: 744.00 m | |
Surface Hole Latitude: 52.388619 | |
Surface Hole Longitude: -113.558020 |
Date | Event |
---|---|
2004-11-19 | Obtained License |
2005-01-20 | Surface Casing Operation Performed |
2005-01-21 | Finished Drilling |
2005-01-21 | Production Casing Operation Performed |
2005-01-21 | Rig Released |
2005-01-21 | Well Mode changed to Drilled and Cased |
2005-01-30 | Well Log Performed |
2005-02-03 | Perforation Treatment Performed - Jet Perforation |
2005-02-26 | Perforation Treatment Performed - Fractured |
2005-02-27 | Well Fluid changed to Coalbed Methane-Coals and Other |
2005-02-27 | Well Mode changed to Testing |
2005-07-13 | Well Began Production |
2005-07-13 | Well Fluid changed to Coalbed Methane-Coals and Other |
2005-07-13 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2005-02-03 | Perforation | 687.50 | 688.50 | 13 |
2005-02-03 | Perforation | 634.00 | 636.00 | 13 |
2005-02-03 | Perforation | 631.50 | 632.50 | 13 |
2005-02-03 | Perforation | 627.00 | 630.00 | 13 |
2005-02-03 | Perforation | 618.60 | 621.60 | 13 |
2005-02-03 | Perforation | 609.00 | 610.00 | 13 |
2005-02-03 | Perforation | 601.50 | 602.50 | 13 |
2005-02-03 | Perforation | 598.00 | 599.00 | 13 |
2005-02-03 | Perforation | 571.50 | 572.50 | 13 |
2005-02-03 | Perforation | 550.70 | 551.70 | 13 |
2005-02-03 | Perforation | 542.50 | 543.50 | 13 |
2005-02-03 | Perforation | 686.00 | 687.00 | 13 |
2005-02-03 | Perforation | 537.50 | 538.50 | 13 |
2005-02-03 | Perforation | 535.50 | 536.50 | 13 |
2005-02-03 | Perforation | 485.50 | 486.50 | 13 |
2005-02-03 | Perforation | 475.50 | 476.50 | 13 |
2005-02-03 | Perforation | 468.00 | 470.00 | 13 |
2005-02-03 | Perforation | 426.00 | 427.00 | 13 |
2005-02-03 | Perforation | 331.50 | 332.50 | 13 |
2005-02-03 | Perforation | 320.50 | 321.50 | 13 |
2005-02-03 | Perforation | 313.00 | 314.00 | 13 |
2005-02-03 | Perforation | 306.00 | 308.00 | 13 |
2005-02-03 | Perforation | 676.00 | 677.00 | 13 |
2005-02-03 | Perforation | 251.00 | 254.00 | 13 |
2005-02-03 | Perforation | 249.50 | 250.50 | 13 |
2005-02-03 | Perforation | 247.00 | 249.00 | 13 |
2005-02-03 | Perforation | 244.50 | 246.50 | 13 |
2005-02-03 | Perforation | 242.50 | 244.50 | 13 |
2005-02-03 | Perforation | 231.00 | 232.00 | 13 |
2005-02-03 | Perforation | 225.00 | 227.00 | 13 |
2005-02-26 | Fracture | 225.00 | 689.00 | 0 |
2005-02-03 | Perforation | 673.00 | 675.00 | 13 |
2005-02-03 | Perforation | 668.50 | 669.50 | 13 |
2005-02-03 | Perforation | 665.50 | 668.50 | 13 |
2005-02-03 | Perforation | 659.00 | 660.00 | 13 |
2005-02-03 | Perforation | 656.00 | 657.00 | 13 |
2005-02-03 | Perforation | 643.50 | 644.50 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2005 | 4218 | 0.0 | 0.0 | 0.0 |
2006 | 8699 | 0.0 | 0.0 | 0.0 |
2007 | 8759 | 0.0 | 0.0 | 0.0 |
2008 | 8783 | 0.0 | 0.0 | 0.0 |
2009 | 8669 | 0.0 | 0.0 | 0.0 |
2010 | 8698 | 0.0 | 0.0 | 0.0 |
2011 | 8628 | 0.0 | 0.0 | 0.0 |
2012 | 8726 | 0.0 | 0.0 | 0.0 |
2013 | 8713 | 0.0 | 0.0 | 0.0 |
2014 | 8749 | 0.0 | 0.0 | 0.0 |
2015 | 8755 | 0.0 | 0.0 | 0.0 |
2016 | 8759 | 0.0 | 0.0 | 0.0 |
2017 | 8757 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 8711 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]