If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0394252914000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.3873,"lon":-113.569998,"icon":""}]} |
Location: 00/14-29-039-25W4/0 | |
Location Alias: 00/14-29-39-25 W4M | |
Location Alias 2: 00/14-29-039-25 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 039 | |
Meridian: 4 | |
Range: 25 | |
Section: 29 | |
County/Municipality: Lacombe County | |
Well Name: CPC RESOURCES LACOMBE 14-29-39-25 | |
Operator Name: Lynx Energy ULC | |
License Number: 0319295 | |
License Date: 2004-11-19 | |
License Status: Issued | |
Spud Date: 2005-01-20 | |
Final Drill Date: 2005-01-22 | |
Well Total Depth: 738.00 m | |
Surface Hole Latitude: 52.387300 | |
Surface Hole Longitude: -113.569998 |
Date | Event |
---|---|
2004-11-19 | Obtained License |
2005-01-17 | Surface Casing Operation Performed |
2005-01-22 | Finished Drilling |
2005-01-22 | Production Casing Operation Performed |
2005-01-22 | Rig Released |
2005-01-22 | Well Mode changed to Drilled and Cased |
2005-01-30 | Well Log Performed |
2005-02-03 | Perforation Treatment Performed - Jet Perforation |
2005-02-04 | Perforation Treatment Performed - Jet Perforation |
2005-02-25 | Perforation Treatment Performed - Fractured |
2005-02-26 | Well Fluid changed to Coalbed Methane-Coals and Other |
2005-02-26 | Well Mode changed to Testing |
2005-07-13 | Well Began Production |
2005-07-13 | Well Fluid changed to Coalbed Methane-Coals and Other |
2005-07-13 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2005-02-03 | Perforation | 681.00 | 682.00 | 13 |
2005-02-03 | Perforation | 630.50 | 631.50 | 13 |
2005-02-04 | Perforation | 625.30 | 626.30 | 13 |
2005-02-04 | Perforation | 621.00 | 623.00 | 13 |
2005-02-04 | Perforation | 619.00 | 621.00 | 13 |
2005-02-04 | Perforation | 603.00 | 604.00 | 13 |
2005-02-04 | Perforation | 599.00 | 600.00 | 13 |
2005-02-04 | Perforation | 548.50 | 550.50 | 13 |
2005-02-04 | Perforation | 542.00 | 543.00 | 13 |
2005-02-04 | Perforation | 536.50 | 537.50 | 13 |
2005-02-04 | Perforation | 534.00 | 535.00 | 13 |
2005-02-03 | Perforation | 677.50 | 678.50 | 13 |
2005-02-04 | Perforation | 531.00 | 532.00 | 13 |
2005-02-04 | Perforation | 527.00 | 530.00 | 13 |
2005-02-04 | Perforation | 473.00 | 474.00 | 13 |
2005-02-04 | Perforation | 413.50 | 414.50 | 13 |
2005-02-04 | Perforation | 405.00 | 406.00 | 13 |
2005-02-04 | Perforation | 361.00 | 362.00 | 13 |
2005-02-04 | Perforation | 314.00 | 315.00 | 13 |
2005-02-04 | Perforation | 307.00 | 308.00 | 13 |
2005-02-04 | Perforation | 302.00 | 304.00 | 13 |
2005-02-04 | Perforation | 297.00 | 298.00 | 13 |
2005-02-03 | Perforation | 668.50 | 669.50 | 13 |
2005-02-04 | Perforation | 289.50 | 290.50 | 13 |
2005-02-04 | Perforation | 288.00 | 289.00 | 13 |
2005-02-04 | Perforation | 282.00 | 283.00 | 13 |
2005-02-04 | Perforation | 244.50 | 246.50 | 13 |
2005-02-04 | Perforation | 238.50 | 240.50 | 13 |
2005-02-04 | Perforation | 236.00 | 238.00 | 13 |
2005-02-04 | Perforation | 234.00 | 235.00 | 13 |
2005-02-25 | Fracture | 234.00 | 682.00 | 0 |
2005-02-03 | Perforation | 666.00 | 668.00 | 13 |
2005-02-03 | Perforation | 659.50 | 661.50 | 13 |
2005-02-03 | Perforation | 657.00 | 658.00 | 13 |
2005-02-03 | Perforation | 652.50 | 653.50 | 13 |
2005-02-03 | Perforation | 649.00 | 650.00 | 13 |
2005-02-03 | Perforation | 634.00 | 635.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2005 | 4218 | 0.0 | 0.0 | 0.0 |
2006 | 8699 | 0.0 | 0.0 | 0.0 |
2007 | 8759 | 0.0 | 0.0 | 0.0 |
2008 | 8783 | 0.0 | 0.0 | 0.0 |
2009 | 8669 | 0.0 | 0.0 | 0.0 |
2010 | 8698 | 0.0 | 0.0 | 0.0 |
2011 | 8628 | 0.0 | 0.0 | 0.0 |
2012 | 8726 | 0.0 | 0.0 | 0.0 |
2013 | 8713 | 0.0 | 0.0 | 0.0 |
2014 | 8749 | 0.0 | 0.0 | 0.0 |
2015 | 8755 | 0.0 | 0.0 | 0.0 |
2016 | 8759 | 0.0 | 0.0 | 0.0 |
2017 | 8757 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 8711 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]