X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394252416020

Well Details

Well ID: 0394252416020
Loading map...
Location: 02/16-24-039-25W4/0
Location Alias: 02/16-24-39-25 W4M
Location Alias 2: 02/16-24-039-25 W4/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 25
Section: 24
County/Municipality: Lacombe County
Well Name: CPC RESOURCES JOFFRE 16-24-39-25
Operator Name: Lynx Energy ULC
License Number: 0362610
License Date: 2006-09-01
License Status: Issued
Spud Date: 2006-09-07
Final Drill Date: 2006-09-08
Well Total Depth: 894.00 m
Surface Hole Latitude: 52.375186
Surface Hole Longitude: -113.460419

For data sources see[1][2]

Well History

Date Event
2006-09-01 Obtained License
2006-09-07 Surface Casing Operation Performed
2006-09-08 Finished Drilling
2006-09-08 Production Casing Operation Performed
2006-09-08 Rig Released
2006-09-08 Well Mode changed to Drilled and Cased
2006-09-26 Well Log Performed
2006-10-05 Perforation Treatment Performed - Jet Perforation
2006-10-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-10-26 Perforation Treatment Performed - Jet Perforation
2006-10-26 Plug Back Performed
2006-10-26 Well Mode changed to Abandoned Zone
2006-11-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-11-02 Plug Back Performed
2006-11-03 Perforation Treatment Performed - Fractured
2006-11-03 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-10-05 Perforation 843.00 844.00 20
2006-11-03 Perforation 534.80 535.80 13
2006-11-03 Perforation 525.00 526.00 13
2006-11-03 Perforation 521.10 522.10 13
2006-11-03 Perforation 500.80 501.80 13
2006-11-03 Perforation 489.50 490.50 13
2006-11-03 Perforation 483.00 485.00 13
2006-11-03 Perforation 464.00 465.00 13
2006-11-03 Perforation 456.00 457.00 13
2006-11-03 Perforation 450.00 451.00 13
2006-11-03 Perforation 434.50 435.50 13
2006-10-26 Packing Device Capped w/Cement 826.00 834.00 0
2006-11-03 Perforation 432.00 433.00 13
2006-11-03 Perforation 418.00 420.00 13
2006-11-03 Perforation 405.60 406.60 13
2006-11-03 Perforation 379.00 380.00 13
2006-11-03 Perforation 352.30 353.30 13
2006-11-03 Perforation 348.00 349.00 13
2006-11-03 Perforation 343.20 344.20 13
2006-11-03 Perforation 334.80 336.30 13
2006-11-03 Perforation 290.50 292.00 13
2006-11-03 Perforation 277.30 278.30 13
2006-10-26 Perforation 649.10 650.10 20
2006-11-03 Fracture 277.30 551.00 0
2006-10-26 Perforation 630.50 631.50 20
2006-11-02 Packing Device Capped w/Cement 617.00 625.00 0
2006-11-03 Perforation 550.00 551.00 13
2006-11-03 Perforation 543.30 544.30 13
2006-11-03 Perforation 539.90 541.40 13
2006-11-03 Perforation 536.70 537.70 13

For data sources see[4]



References