If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0394252414000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.375278,"lon":-113.473649,"icon":""}]} |
Location: 00/14-24-039-25W4/0 | |
Location Alias: 00/14-24-39-25 W4M | |
Location Alias 2: 00/14-24-039-25 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 039 | |
Meridian: 4 | |
Range: 25 | |
Section: 24 | |
County/Municipality: Lacombe County | |
Well Name: CPC RESOURCES JOFFRE 14-24-39-25 | |
Operator Name: Lynx Energy ULC | |
License Number: 0361755 | |
License Date: 2006-08-16 | |
License Status: Issued | |
Spud Date: 2006-09-07 | |
Final Drill Date: 2006-09-08 | |
Well Total Depth: 908.00 m | |
Surface Hole Latitude: 52.375278 | |
Surface Hole Longitude: -113.473649 |
Date | Event |
---|---|
2006-08-16 | Obtained License |
2006-09-03 | Surface Casing Operation Performed |
2006-09-08 | Finished Drilling |
2006-09-08 | Production Casing Operation Performed |
2006-09-08 | Rig Released |
2006-09-08 | Well Mode changed to Drilled and Cased |
2006-09-26 | Well Log Performed |
2006-10-05 | Perforation Treatment Performed - Jet Perforation |
2006-10-05 | Well Fluid changed to Coalbed Methane-Coals and Other |
2006-10-05 | Well Mode changed to Testing |
2006-11-03 | Perforation Treatment Performed - Jet Perforation |
2006-11-06 | Perforation Treatment Performed - Fractured |
2006-11-13 | Well Began Production |
2006-11-13 | Well Fluid changed to Coalbed Methane-Coals and Other |
2006-11-13 | Well Mode changed to Flowing |
2015-02-24 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2006-10-05 | Perforation | 829.40 | 832.40 | 20 |
2006-11-03 | Perforation | 500.00 | 502.00 | 7 |
2006-11-03 | Perforation | 483.50 | 484.50 | 7 |
2006-11-03 | Perforation | 475.50 | 476.50 | 7 |
2006-11-03 | Perforation | 469.80 | 470.80 | 7 |
2006-11-03 | Perforation | 455.00 | 456.00 | 7 |
2006-11-03 | Perforation | 453.30 | 454.30 | 7 |
2006-11-03 | Perforation | 439.00 | 440.00 | 7 |
2006-11-03 | Perforation | 435.30 | 436.30 | 7 |
2006-11-03 | Perforation | 432.00 | 433.00 | 7 |
2006-11-03 | Perforation | 425.00 | 426.00 | 7 |
2006-11-03 | Perforation | 561.70 | 562.70 | 7 |
2006-11-03 | Perforation | 390.00 | 391.00 | 7 |
2006-11-03 | Perforation | 388.00 | 389.00 | 7 |
2006-11-03 | Perforation | 367.90 | 369.40 | 7 |
2006-11-03 | Perforation | 340.80 | 341.80 | 7 |
2006-11-03 | Perforation | 334.00 | 335.00 | 7 |
2006-11-03 | Perforation | 311.00 | 313.00 | 7 |
2006-11-03 | Perforation | 261.00 | 262.00 | 7 |
2006-11-03 | Perforation | 226.00 | 227.00 | 7 |
2006-11-03 | Perforation | 217.50 | 218.50 | 7 |
2006-11-03 | Perforation | 211.30 | 212.30 | 7 |
2006-11-03 | Perforation | 559.10 | 560.60 | 7 |
2006-11-03 | Perforation | 204.50 | 205.50 | 7 |
2006-11-03 | Perforation | 201.70 | 203.70 | 7 |
2006-11-06 | Fracture | 201.70 | 562.70 | 0 |
2006-11-03 | Perforation | 556.80 | 557.80 | 7 |
2006-11-03 | Perforation | 555.30 | 556.30 | 7 |
2006-11-03 | Perforation | 541.10 | 542.10 | 7 |
2006-11-03 | Perforation | 538.50 | 539.50 | 7 |
2006-11-03 | Perforation | 521.00 | 522.00 | 7 |
2006-11-03 | Perforation | 509.50 | 511.50 | 7 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2006 | 1272 | 0.0 | 0.0 | 0.0 |
2007 | 8327 | 0.0 | 0.0 | 0.0 |
2008 | 8779 | 0.0 | 0.0 | 0.0 |
2009 | 8669 | 0.0 | 0.0 | 0.0 |
2010 | 8698 | 0.0 | 0.0 | 0.0 |
2011 | 8628 | 0.0 | 0.0 | 0.0 |
2012 | 8726 | 0.0 | 0.0 | 0.0 |
2013 | 8713 | 0.0 | 0.0 | 0.0 |
2014 | 8749 | 0.0 | 0.0 | 0.0 |
2015 | 8755 | 0.0 | 0.0 | 0.0 |
2016 | 8759 | 0.0 | 0.0 | 0.0 |
2017 | 8757 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 8711 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2015-02-24 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]