If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0394252008003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.367351,"lon":-113.560573,"icon":""}]} |
Location: 00/08-20-039-25W4/3 | |
Location Alias: 00/08-20-39-25 W4M | |
Location Alias 2: 00/08-20-039-25 W4/03 | |
Country: Canada | |
Province: Alberta | |
Township: 039 | |
Meridian: 4 | |
Range: 25 | |
Section: 20 | |
County/Municipality: Lacombe County | |
Well Name: CPC RESOURCES LACOMBE 8-20-39-25 | |
Operator Name: Lynx Energy ULC | |
License Number: 0295325 | |
License Date: 2003-10-31 | |
License Status: Issued | |
Spud Date: 2003-11-22 | |
Final Drill Date: 2003-11-24 | |
Well Total Depth: 1009.00 m | |
Surface Hole Latitude: 52.367351 | |
Surface Hole Longitude: -113.560573 |
Date | Event |
---|---|
2003-10-31 | Obtained License |
2003-11-22 | Surface Casing Operation Performed |
2003-11-24 | Finished Drilling |
2003-11-24 | Production Casing Operation Performed |
2003-11-24 | Rig Released |
2003-11-24 | Well Log Performed |
2003-11-24 | Well Mode changed to Drilled and Cased |
2003-12-02 | Well Log Performed |
2003-12-18 | Perforation Treatment Performed - Jet Perforation |
2003-12-20 | Perforation Treatment Performed - Jet Perforation |
2004-01-22 | Perforation Treatment Performed - Fractured |
2004-02-04 | Perforation Treatment Performed - Jet Perforation |
2004-02-06 | Perforation Treatment Performed - Jet Perforation |
2004-02-08 | Perforation Treatment Performed - Jet Perforation |
2004-02-09 | Perforation Treatment Performed - Jet Perforation |
2004-02-11 | Perforation Treatment Performed - Jet Perforation |
2004-02-29 | Perforation Treatment Performed - Fractured |
2004-03-12 | Well Log Performed |
2004-03-22 | Well Log Performed |
2004-05-02 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2004-05-02 | Plug Back Performed |
2004-05-03 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2004-05-03 | Plug Back Performed |
2005-07-04 | Well Began Production |
2005-07-04 | Well Fluid changed to Coalbed Methane-Coals and Other |
2005-07-04 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2003-12-18 | Perforation | 823.00 | 825.00 | 7 |
2004-02-11 | Perforation | 625.00 | 630.00 | 13 |
2004-02-11 | Perforation | 622.00 | 624.00 | 13 |
2004-02-11 | Perforation | 618.50 | 619.50 | 13 |
2004-02-11 | Perforation | 614.50 | 615.50 | 13 |
2004-02-11 | Perforation | 590.00 | 591.00 | 13 |
2004-02-11 | Perforation | 582.50 | 583.50 | 13 |
2004-02-11 | Perforation | 578.50 | 581.50 | 13 |
2004-02-11 | Perforation | 567.50 | 568.50 | 13 |
2004-02-11 | Perforation | 552.00 | 553.00 | 13 |
2004-02-11 | Perforation | 521.00 | 522.00 | 13 |
2003-12-20 | Perforation | 791.50 | 793.50 | 7 |
2004-02-11 | Perforation | 508.00 | 509.00 | 13 |
2004-02-11 | Perforation | 489.50 | 492.50 | 13 |
2004-02-11 | Perforation | 281.00 | 282.00 | 13 |
2004-02-11 | Perforation | 268.00 | 269.00 | 13 |
2004-02-11 | Perforation | 264.50 | 267.50 | 13 |
2004-02-11 | Perforation | 256.00 | 257.00 | 13 |
2004-02-11 | Perforation | 206.00 | 208.00 | 13 |
2004-02-11 | Perforation | 196.50 | 198.50 | 13 |
2004-02-11 | Perforation | 192.50 | 195.50 | 13 |
2004-02-11 | Perforation | 466.00 | 468.00 | 13 |
2004-01-22 | Fracture | 791.50 | 793.50 | 0 |
2004-02-11 | Perforation | 271.50 | 273.50 | 13 |
2004-02-29 | Fracture | 192.50 | 638.00 | 0 |
2004-05-02 | Packing Device Capped w/Cement | 807.00 | 815.00 | 0 |
2004-05-03 | Packing Device Capped w/Cement | 778.00 | 786.00 | 0 |
2004-02-04 | Perforation | 645.00 | 647.00 | 7 |
2004-02-06 | Perforation | 426.00 | 427.00 | 7 |
2004-02-06 | Perforation | 420.50 | 422.50 | 7 |
2004-02-08 | Perforation | 296.00 | 298.00 | 7 |
2004-02-09 | Perforation | 286.00 | 288.00 | 7 |
2004-02-11 | Perforation | 637.00 | 638.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2005 | 4306 | 0.0 | 0.0 | 0.0 |
2006 | 8747 | 0.0 | 0.0 | 0.0 |
2007 | 8759 | 0.0 | 0.0 | 0.0 |
2008 | 8783 | 0.0 | 0.0 | 0.0 |
2009 | 8669 | 0.0 | 0.0 | 0.0 |
2010 | 8698 | 0.0 | 0.0 | 0.0 |
2011 | 8628 | 0.0 | 0.0 | 0.0 |
2012 | 8726 | 0.0 | 0.0 | 0.0 |
2013 | 8713 | 0.0 | 0.0 | 0.0 |
2014 | 8749 | 0.0 | 0.0 | 0.0 |
2015 | 8755 | 0.0 | 0.0 | 0.0 |
2016 | 8759 | 0.0 | 0.0 | 0.0 |
2017 | 8757 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 8711 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]