If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0394251716000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.359152,"lon":-113.56056,"icon":""}]} |
Location: 00/16-17-039-25W4/0 | |
Location Alias: 00/16-17-39-25 W4M | |
Location Alias 2: 00/16-17-039-25 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 039 | |
Meridian: 4 | |
Range: 25 | |
Section: 17 | |
County/Municipality: Lacombe County | |
Well Name: CPC RESOURCES JOFFRE 16-17-39-25 | |
Operator Name: Lynx Energy ULC | |
License Number: 0341888 | |
License Date: 2005-11-03 | |
License Status: Issued | |
Spud Date: 2005-11-19 | |
Final Drill Date: 2005-11-20 | |
Well Total Depth: 710.00 m | |
Surface Hole Latitude: 52.359152 | |
Surface Hole Longitude: -113.560560 |
Date | Event |
---|---|
2005-11-03 | Obtained License |
2005-11-18 | Surface Casing Operation Performed |
2005-11-20 | Finished Drilling |
2005-11-20 | Production Casing Operation Performed |
2005-11-20 | Rig Released |
2005-11-20 | Well Mode changed to Drilled and Cased |
2005-11-28 | Well Log Performed |
2005-12-12 | Perforation Treatment Performed - Jet Perforation |
2005-12-13 | Perforation Treatment Performed - Fractured |
2005-12-20 | Well Began Production |
2005-12-20 | Well Fluid changed to Coalbed Methane-Coals and Other |
2005-12-20 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2005-12-12 | Perforation | 256.80 | 257.30 | 13 |
2005-12-12 | Perforation | 424.20 | 424.70 | 13 |
2005-12-12 | Perforation | 428.40 | 428.90 | 13 |
2005-12-12 | Perforation | 447.50 | 448.50 | 13 |
2005-12-12 | Perforation | 450.00 | 452.00 | 13 |
2005-12-12 | Perforation | 484.00 | 484.50 | 13 |
2005-12-12 | Perforation | 485.10 | 485.60 | 13 |
2005-12-12 | Perforation | 491.50 | 492.00 | 13 |
2005-12-12 | Perforation | 498.80 | 499.30 | 13 |
2005-12-12 | Perforation | 513.00 | 513.50 | 13 |
2005-12-12 | Perforation | 523.00 | 524.00 | 13 |
2005-12-12 | Perforation | 259.50 | 260.50 | 13 |
2005-12-12 | Perforation | 534.70 | 535.20 | 13 |
2005-12-12 | Perforation | 544.70 | 545.20 | 13 |
2005-12-12 | Perforation | 548.70 | 549.20 | 13 |
2005-12-12 | Perforation | 567.90 | 568.90 | 13 |
2005-12-12 | Perforation | 573.10 | 573.60 | 13 |
2005-12-12 | Perforation | 575.10 | 575.60 | 13 |
2005-12-12 | Perforation | 582.70 | 583.20 | 13 |
2005-12-12 | Perforation | 603.70 | 604.20 | 13 |
2005-12-12 | Perforation | 605.90 | 606.40 | 13 |
2005-12-12 | Perforation | 607.00 | 607.50 | 13 |
2005-12-12 | Perforation | 261.30 | 262.80 | 13 |
2005-12-12 | Perforation | 611.90 | 612.40 | 13 |
2005-12-12 | Perforation | 613.90 | 614.40 | 13 |
2005-12-12 | Perforation | 615.00 | 615.50 | 13 |
2005-12-12 | Perforation | 618.30 | 618.80 | 13 |
2005-12-13 | Fracture | 256.80 | 618.60 | 0 |
2005-12-12 | Perforation | 264.20 | 264.70 | 13 |
2005-12-12 | Perforation | 275.20 | 275.70 | 13 |
2005-12-12 | Perforation | 310.20 | 311.20 | 13 |
2005-12-12 | Perforation | 315.60 | 316.60 | 13 |
2005-12-12 | Perforation | 334.00 | 336.00 | 13 |
2005-12-12 | Perforation | 354.50 | 355.50 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2005 | 288 | 0.0 | 0.0 | 0.0 |
2006 | 8747 | 0.0 | 0.0 | 0.0 |
2007 | 8759 | 0.0 | 0.0 | 0.0 |
2008 | 8783 | 0.0 | 0.0 | 0.0 |
2009 | 8669 | 0.0 | 0.0 | 0.0 |
2010 | 8698 | 0.0 | 0.0 | 0.0 |
2011 | 8628 | 0.0 | 0.0 | 0.0 |
2012 | 8726 | 0.0 | 0.0 | 0.0 |
2013 | 8713 | 0.0 | 0.0 | 0.0 |
2014 | 8749 | 0.0 | 0.0 | 0.0 |
2015 | 8755 | 0.0 | 0.0 | 0.0 |
2016 | 8759 | 0.0 | 0.0 | 0.0 |
2017 | 8757 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 8711 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]