If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0394251508020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.353456,"lon":-113.512445,"icon":""}]} |
| Location: 02/08-15-039-25W4/0 | |
| Location Alias: 02/08-15-39-25 W4M | |
| Location Alias 2: 02/08-15-039-25 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 039 | |
| Meridian: 4 | |
| Range: 25 | |
| Section: 15 | |
| County/Municipality: Lacombe County | |
| Well Name: CPC RESOURCES JOFFRE 8-15-39-25 | |
| Operator Name: Lynx Energy ULC | |
| License Number: 0299902 | |
| License Date: 2003-12-23 | |
| License Status: Amended | |
| Spud Date: 2004-01-11 | |
| Final Drill Date: 2004-01-13 | |
| Well Total Depth: 976.00 m | |
| Surface Hole Latitude: 52.353456 | |
| Surface Hole Longitude: -113.512445 |
| Date | Event |
|---|---|
| 2003-12-23 | Obtained License |
| 2004-01-11 | Surface Casing Operation Performed |
| 2004-01-13 | Finished Drilling |
| 2004-01-13 | Production Casing Operation Performed |
| 2004-01-13 | Rig Released |
| 2004-01-13 | Well Mode changed to Drilled and Cased |
| 2004-01-24 | Well Log Performed |
| 2004-02-06 | Perforation Treatment Performed - Jet Perforation |
| 2004-02-08 | Well Fluid changed to Gas |
| 2004-02-08 | Well Mode changed to Testing |
| 2004-04-10 | Well Began Production |
| 2004-04-10 | Well Fluid changed to Gas |
| 2004-04-10 | Well Mode changed to Flowing |
| 2007-07-08 | Plug Back Performed |
| 2007-07-12 | Perforation Treatment Performed - Jet Perforation |
| 2007-07-17 | Perforation Treatment Performed - Jet Perforation |
| 2007-07-30 | Perforation Treatment Performed - Jet Perforation |
| 2007-09-29 | Perforation Treatment Performed - Fractured |
| 2008-01-01 | Well Fluid changed to Gas |
| 2008-01-01 | Well Mode changed to Suspended |
| 2008-01-10 | Perforation Treatment Performed - Jet Perforation |
| 2008-02-02 | Perforation Treatment Performed - Jet Perforation |
| 2008-02-05 | Perforation Treatment Performed - Fractured |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2004-02-06 | Perforation | 869.00 | 871.00 | 7 |
| 2008-02-02 | Perforation | 237.30 | 238.30 | 7 |
| 2008-02-02 | Perforation | 240.80 | 241.80 | 7 |
| 2008-02-02 | Perforation | 244.00 | 246.00 | 7 |
| 2008-02-02 | Perforation | 250.90 | 251.90 | 7 |
| 2008-02-02 | Perforation | 255.00 | 257.00 | 7 |
| 2008-02-02 | Perforation | 363.20 | 364.20 | 7 |
| 2008-02-02 | Perforation | 372.90 | 373.90 | 7 |
| 2008-02-02 | Perforation | 402.00 | 404.00 | 7 |
| 2008-02-02 | Perforation | 417.00 | 419.00 | 7 |
| 2008-02-02 | Perforation | 436.00 | 438.00 | 7 |
| 2007-07-12 | Perforation | 850.00 | 851.00 | 20 |
| 2008-02-02 | Perforation | 451.40 | 452.40 | 7 |
| 2008-02-02 | Perforation | 533.80 | 535.80 | 7 |
| 2008-02-02 | Perforation | 539.30 | 541.30 | 7 |
| 2008-02-02 | Perforation | 576.40 | 577.40 | 7 |
| 2008-02-02 | Perforation | 577.90 | 578.90 | 7 |
| 2008-02-02 | Perforation | 589.20 | 590.70 | 7 |
| 2008-02-02 | Perforation | 594.40 | 595.20 | 7 |
| 2008-02-02 | Perforation | 597.10 | 598.10 | 7 |
| 2008-02-02 | Perforation | 604.70 | 605.70 | 7 |
| 2008-02-02 | Perforation | 611.80 | 612.80 | 7 |
| 2007-07-17 | Perforation | 716.50 | 717.50 | 20 |
| 2008-02-05 | Fracture | 230.50 | 598.10 | 0 |
| 2007-07-30 | Perforation | 637.50 | 638.50 | 20 |
| 2007-09-29 | Fracture | 637.50 | 851.00 | 0 |
| 2008-01-10 | Perforation | 691.40 | 693.40 | 13 |
| 2008-01-10 | Perforation | 670.00 | 673.00 | 13 |
| 2008-01-10 | Perforation | 637.00 | 639.00 | 13 |
| 2008-02-02 | Perforation | 230.50 | 231.50 | 7 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2004 | 6204 | 0.0 | 0.0 | 0.0 |
| 2005 | 8713 | 0.0 | 0.0 | 0.0 |
| 2006 | 5126 | 0.0 | 0.0 | 0.0 |
| 2007 | 7247 | 0.0 | 0.0 | 0.0 |
For data sources see[5]