X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394251408020

Well Details

Well ID: 0394251408020
Loading map...
Location: 02/08-14-039-25W4/0
Location Alias: 02/08-14-39-25 W4M
Location Alias 2: 02/08-14-039-25 W4/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 25
Section: 14
County/Municipality: Lacombe County
Well Name: CPC RESOURCES JOFFRE 8-14-39-25
Operator Name: Lynx Energy ULC
License Number: 0319288
License Date: 2004-11-19
License Status: Issued
Spud Date: 2005-02-27
Final Drill Date: 2005-03-01
Well Total Depth: 739.00 m
Surface Hole Latitude: 52.350598
Surface Hole Longitude: -113.485983

For data sources see[1][2]

Well History

Date Event
2004-11-19 Obtained License
2005-02-28 Surface Casing Operation Performed
2005-03-01 Finished Drilling
2005-03-01 Production Casing Operation Performed
2005-03-01 Rig Released
2005-03-01 Well Mode changed to Drilled and Cased
2005-06-23 Well Log Performed
2005-07-09 Perforation Treatment Performed - Jet Perforation
2005-07-10 Perforation Treatment Performed - Fractured
2005-07-17 Well Began Production
2005-07-17 Well Fluid changed to Coalbed Methane-Coals and Other
2005-07-17 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-07-09 Perforation 615.50 616.50 13
2005-07-09 Perforation 462.00 463.00 13
2005-07-09 Perforation 475.50 476.50 13
2005-07-09 Perforation 505.00 506.00 13
2005-07-09 Perforation 519.30 521.30 13
2005-07-09 Perforation 532.50 534.50 13
2005-07-09 Perforation 560.50 561.50 13
2005-07-09 Perforation 579.40 580.40 13
2005-07-09 Perforation 581.30 582.30 13
2005-07-09 Perforation 586.80 587.80 13
2005-07-09 Perforation 594.50 596.50 13
2005-07-09 Perforation 620.00 621.00 13
2005-07-09 Perforation 601.00 603.00 13
2005-07-09 Perforation 604.00 605.00 13
2005-07-10 Fracture 615.50 621.00 0
2005-07-10 Fracture 601.00 605.00 0
2005-07-10 Fracture 594.50 596.50 0
2005-07-10 Fracture 579.40 587.80 0
2005-07-10 Fracture 560.50 561.50 0
2005-07-10 Fracture 532.50 534.50 0
2005-07-10 Fracture 519.30 521.30 0
2005-07-10 Fracture 505.00 506.00 0
2005-07-09 Perforation 383.50 384.50 13
2005-07-10 Fracture 475.50 476.50 0
2005-07-10 Fracture 462.00 463.00 0
2005-07-10 Fracture 439.00 440.00 0
2005-07-10 Fracture 421.00 427.30 0
2005-07-10 Fracture 405.50 408.50 0
2005-07-10 Fracture 399.90 400.90 0
2005-07-10 Fracture 383.50 386.50 0
2005-07-09 Perforation 385.30 386.30 13
2005-07-09 Perforation 399.90 400.90 13
2005-07-09 Perforation 405.50 408.50 13
2005-07-09 Perforation 421.00 422.00 13
2005-07-09 Perforation 424.30 427.30 13
2005-07-09 Perforation 439.00 440.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 4003 0.0 0.0 0.0
2006 8747 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8669 0.0 0.0 0.0
2010 8698 0.0 0.0 0.0
2011 8628 0.0 0.0 0.0
2012 8726 0.0 0.0 0.0
2013 8713 0.0 0.0 0.0
2014 8749 0.0 0.0 0.0
2015 8755 0.0 0.0 0.0
2016 8759 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8711 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References