If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0394251306002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.353521,"lon":-113.475294,"icon":""}]} |
Location: 00/06-13-039-25W4/2 | |
Location Alias: 00/06-13-39-25 W4M | |
Location Alias 2: 00/06-13-039-25 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 039 | |
Meridian: 4 | |
Range: 25 | |
Section: 13 | |
County/Municipality: Lacombe County | |
Well Name: CPC RESOURCES JOFFRE 6-13-39-25 | |
Operator Name: Lynx Energy ULC | |
License Number: 0331715 | |
License Date: 2005-05-27 | |
License Status: Amended | |
Spud Date: 2005-07-04 | |
Final Drill Date: 2005-07-05 | |
Well Total Depth: 913.00 m | |
Surface Hole Latitude: 52.353521 | |
Surface Hole Longitude: -113.475294 |
Date | Event |
---|---|
2005-05-27 | Obtained License |
2005-06-01 | Surface Casing Operation Performed |
2005-07-05 | Finished Drilling |
2005-07-05 | Production Casing Operation Performed |
2005-07-05 | Rig Released |
2005-07-05 | Well Mode changed to Drilled and Cased |
2005-08-04 | Well Log Performed |
2005-09-05 | Perforation Treatment Performed - Jet Perforation |
2005-10-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2005-10-12 | Perforation Treatment Performed - Jet Perforation |
2005-10-12 | Plug Back Performed |
2005-10-17 | Perforation Treatment Performed - Fractured |
2008-01-09 | Perforation Treatment Performed - Jet Perforation |
2008-01-11 | Perforation Treatment Performed - Fractured |
2008-01-19 | Well Began Production |
2008-01-19 | Well Fluid changed to Coalbed Methane-Coals and Other |
2008-01-19 | Well Mode changed to Flowing |
2008-02-01 | Well Fluid changed to Coalbed Methane-Coals and Other |
2008-02-01 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2005-09-05 | Perforation | 661.00 | 662.00 | 13 |
2005-10-12 | Perforation | 296.50 | 297.50 | 13 |
2005-10-12 | Perforation | 301.20 | 302.20 | 13 |
2005-10-12 | Perforation | 312.30 | 313.30 | 13 |
2005-10-12 | Perforation | 372.00 | 373.00 | 13 |
2005-10-12 | Perforation | 403.00 | 404.00 | 13 |
2005-10-12 | Perforation | 423.20 | 424.20 | 13 |
2005-10-12 | Perforation | 603.00 | 604.00 | 13 |
2005-10-17 | Fracture | 223.00 | 604.00 | 0 |
2008-01-09 | Perforation | 203.60 | 204.60 | 7 |
2008-01-09 | Perforation | 408.90 | 409.90 | 7 |
2005-10-12 | Packing Device Capped w/Cement | 647.00 | 655.00 | 0 |
2008-01-09 | Perforation | 413.00 | 414.00 | 7 |
2008-01-09 | Perforation | 419.00 | 420.10 | 7 |
2008-01-09 | Perforation | 424.60 | 425.60 | 7 |
2008-01-09 | Perforation | 437.30 | 438.30 | 7 |
2008-01-09 | Perforation | 493.90 | 494.90 | 7 |
2008-01-09 | Perforation | 496.90 | 497.90 | 7 |
2008-01-09 | Perforation | 502.50 | 503.50 | 7 |
2008-01-09 | Perforation | 510.90 | 511.90 | 7 |
2008-01-09 | Perforation | 526.90 | 527.90 | 7 |
2008-01-09 | Perforation | 529.50 | 530.50 | 7 |
2005-10-12 | Perforation | 200.30 | 201.30 | 13 |
2008-01-09 | Perforation | 543.40 | 544.40 | 7 |
2008-01-09 | Perforation | 547.50 | 549.50 | 7 |
2008-01-09 | Perforation | 550.40 | 551.40 | 7 |
2008-01-09 | Perforation | 559.90 | 560.90 | 7 |
2008-01-11 | Fracture | 203.30 | 560.90 | 0 |
2005-10-12 | Perforation | 223.00 | 224.00 | 13 |
2005-10-12 | Perforation | 226.50 | 227.50 | 13 |
2005-10-12 | Perforation | 248.50 | 249.50 | 13 |
2005-10-12 | Perforation | 259.50 | 260.50 | 13 |
2005-10-12 | Perforation | 276.90 | 277.90 | 13 |
2005-10-12 | Perforation | 279.70 | 280.70 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2008 | 8351 | 0.0 | 0.0 | 0.0 |
2009 | 8669 | 0.0 | 0.0 | 0.0 |
2010 | 8698 | 0.0 | 0.0 | 0.0 |
2011 | 8628 | 0.0 | 0.0 | 0.0 |
2012 | 8726 | 0.0 | 0.0 | 0.0 |
2013 | 8713 | 0.0 | 0.0 | 0.0 |
2014 | 8749 | 0.0 | 0.0 | 0.0 |
2015 | 8755 | 0.0 | 0.0 | 0.0 |
2016 | 8759 | 0.0 | 0.0 | 0.0 |
2017 | 8753 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 8711 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]