X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394250616000

Well Details

Well ID: 0394250616000
Loading map...
Location: 00/16-06-039-25W4/0
Location Alias: 00/16-06-39-25 W4M
Location Alias 2: 00/16-06-039-25 W4/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 25
Section: 06
County/Municipality: Lacombe County
Well Name: CPC RESOURCES JOFFRE 16-6-39-25
Operator Name: Lynx Energy ULC
License Number: 0342124
License Date: 2005-11-07
License Status: Issued
Spud Date: 2005-11-19
Final Drill Date: 2005-11-20
Well Total Depth: 992.00 m
Surface Hole Latitude: 52.331594
Surface Hole Longitude: -113.580544

For data sources see[1][2]

Well History

Date Event
2005-11-07 Obtained License
2005-11-19 Surface Casing Operation Performed
2005-11-20 Finished Drilling
2005-11-20 Production Casing Operation Performed
2005-11-20 Rig Released
2005-11-20 Well Mode changed to Drilled and Cased
2005-11-28 Well Log Performed
2005-12-12 Perforation Treatment Performed - Jet Perforation
2005-12-13 Perforation Treatment Performed - Fractured
2005-12-23 Well Began Production
2005-12-23 Well Fluid changed to Coalbed Methane-Coals and Other
2005-12-23 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-12-12 Perforation 251.20 251.70 13
2005-12-12 Perforation 427.80 428.30 13
2005-12-12 Perforation 450.50 454.50 13
2005-12-12 Perforation 483.10 483.60 13
2005-12-12 Perforation 492.00 492.50 13
2005-12-12 Perforation 538.50 539.00 13
2005-12-12 Perforation 549.00 549.50 13
2005-12-12 Perforation 550.70 551.20 13
2005-12-12 Perforation 567.90 569.90 13
2005-12-12 Perforation 575.40 575.90 13
2005-12-12 Perforation 577.00 578.00 13
2005-12-12 Perforation 259.20 259.70 13
2005-12-12 Perforation 583.90 584.40 13
2005-12-12 Perforation 603.50 604.00 13
2005-12-12 Perforation 605.80 606.30 13
2005-12-12 Perforation 607.60 608.10 13
2005-12-12 Perforation 613.20 613.70 13
2005-12-12 Perforation 614.00 614.50 13
2005-12-12 Perforation 615.20 615.70 13
2005-12-12 Perforation 617.20 617.70 13
2005-12-12 Perforation 625.00 625.50 13
2005-12-12 Perforation 632.00 632.50 13
2005-12-12 Perforation 268.40 269.40 13
2005-12-12 Perforation 681.00 682.00 13
2005-12-13 Fracture 251.20 682.00 0
2005-12-12 Perforation 275.80 276.30 13
2005-12-12 Perforation 286.00 287.00 13
2005-12-12 Perforation 359.30 359.80 13
2005-12-12 Perforation 360.50 361.50 13
2005-12-12 Perforation 404.50 406.50 13
2005-12-12 Perforation 416.50 417.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 216 0.0 0.0 0.0
2006 8747 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8669 0.0 0.0 0.0
2010 8698 0.0 0.0 0.0
2011 8628 0.0 0.0 0.0
2012 8726 0.0 0.0 0.0
2013 8713 0.0 0.0 0.0
2014 8749 0.0 0.0 0.0
2015 8755 0.0 0.0 0.0
2016 8759 0.0 0.0 0.0
2017 8747 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8711 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References