X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394243516002

Well Details

Well ID: 0394243516002
Loading map...
Location: 00/16-35-039-24W4/2
Location Alias: 00/16-35-39-24 W4M
Location Alias 2: 00/16-35-039-24 W4/02
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 24
Section: 35
County/Municipality: Lacombe County
Well Name: FAIRBORNE CLIVE 16-35-39-24
Operator Name: Tourmaline Oil Corp.
License Number: 0107637
License Date: 1984-06-14
License Status: Suspension
Spud Date: 1984-06-18
Final Drill Date: 1984-06-30
Well Total Depth: 1940.00 m
Surface Hole Latitude: 52.403417
Surface Hole Longitude: -113.342065

For data sources see[1][2]

Well History

Date Event
1984-06-14 Obtained License
1984-06-19 Surface Casing Operation Performed
1984-06-30 Finished Drilling
1984-06-30 Well Log Performed
1984-06-30 Well Mode changed to Drilled and Cased
1984-07-02 Production Casing Operation Performed
1984-07-02 Rig Released
1984-07-26 Perforation Treatment Performed - Jet Perforation
1984-07-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-07-30 Well Log Performed
1984-08-01 Perforation Treatment Performed - Cement Squeeze
1984-08-01 Well Log Performed
1984-08-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-08-02 Perforation Treatment Performed - Jet Perforation
1984-08-03 Perforation Treatment Performed - Jet Perforation
1984-08-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-09-20 Well Began Production
1984-09-20 Well Fluid changed to Crude Oil
1984-09-20 Well Mode changed to Pumping
1990-03-03 Perforation Treatment Performed - Cement Squeeze
1990-03-06 Perforation Treatment Performed - Jet Perforation
1990-03-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-03-12 Perforation Treatment Performed - Jet Perforation
1990-03-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-06-17 Perforation Treatment Performed - Cement Squeeze
1992-06-18 Perforation Treatment Performed - Jet Perforation
2002-08-13 Perforation Treatment Performed - Cement Squeeze
2002-08-14 Perforation Treatment Performed - Jet Perforation
2002-08-15 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-12-31 Well Fluid changed to Crude Oil
2011-12-31 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-07-26 Perforation 1906.00 1907.00 14
1990-03-06 Perforation 1894.50 1895.50 13
1990-03-07 Acid Treatment 1894.50 1895.50 0
1990-03-12 Perforation 1855.00 1856.00 13
1990-03-13 Acid Treatment 1855.00 1856.00 0
1992-06-17 Cement Squeeze 1894.50 1895.50 0
1992-06-18 Perforation 1888.50 1890.50 16
2002-08-13 Cement Squeeze 1855.00 1856.00 0
2002-08-14 Perforation 1850.00 1853.50 17
2002-08-15 Acid Treatment 1850.50 1853.50 0
1984-07-27 Acid Treatment 1906.00 1907.00 0
1984-08-01 Cement Squeeze 1906.00 1907.00 0
1984-08-02 Perforation 1899.20 1900.20 14
1984-08-02 Acid Treatment 1899.20 1900.20 0
1984-08-03 Perforation 1862.50 1863.00 7
1984-08-04 Acid Treatment 1862.50 1863.00 0
1990-03-03 Cement Squeeze 1899.20 1900.20 0
1990-03-03 Cement Squeeze 1862.50 1863.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 2319 0.0 0.0 0.0
1985 8561 0.0 0.0 0.0
1986 7720 0.0 0.0 0.0
1987 8428 0.0 0.0 0.0
1988 8585 0.0 0.0 0.0
1989 7707 0.0 0.0 0.0
1990 8086 0.0 0.0 0.0
1991 8273 0.0 0.0 0.0
1992 8162 0.0 0.0 0.0
1993 8185 0.0 0.0 0.0
1994 8668 0.0 0.0 0.0
1995 8418 0.0 0.0 0.0
1996 8400 0.0 0.0 0.0
1997 8473 0.0 0.0 0.0
1998 8687 0.0 0.0 0.0
1999 8399 0.0 0.0 0.0
2000 8719 0.0 0.0 0.0
2001 4521 0.0 0.0 0.0
2002 3188 0.0 0.0 0.0
2003 6642 0.0 0.0 0.0

For data sources see[5]

References