If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0394243516002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.403417,"lon":-113.342065,"icon":""}]} |
| Location: 00/16-35-039-24W4/2 | |
| Location Alias: 00/16-35-39-24 W4M | |
| Location Alias 2: 00/16-35-039-24 W4/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 039 | |
| Meridian: 4 | |
| Range: 24 | |
| Section: 35 | |
| County/Municipality: Lacombe County | |
| Well Name: FAIRBORNE CLIVE 16-35-39-24 | |
| Operator Name: Tourmaline Oil Corp. | |
| License Number: 0107637 | |
| License Date: 1984-06-14 | |
| License Status: Suspension | |
| Spud Date: 1984-06-18 | |
| Final Drill Date: 1984-06-30 | |
| Well Total Depth: 1940.00 m | |
| Surface Hole Latitude: 52.403417 | |
| Surface Hole Longitude: -113.342065 |
| Date | Event |
|---|---|
| 1984-06-14 | Obtained License |
| 1984-06-19 | Surface Casing Operation Performed |
| 1984-06-30 | Finished Drilling |
| 1984-06-30 | Well Log Performed |
| 1984-06-30 | Well Mode changed to Drilled and Cased |
| 1984-07-02 | Production Casing Operation Performed |
| 1984-07-02 | Rig Released |
| 1984-07-26 | Perforation Treatment Performed - Jet Perforation |
| 1984-07-27 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1984-07-30 | Well Log Performed |
| 1984-08-01 | Perforation Treatment Performed - Cement Squeeze |
| 1984-08-01 | Well Log Performed |
| 1984-08-02 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1984-08-02 | Perforation Treatment Performed - Jet Perforation |
| 1984-08-03 | Perforation Treatment Performed - Jet Perforation |
| 1984-08-04 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1984-09-20 | Well Began Production |
| 1984-09-20 | Well Fluid changed to Crude Oil |
| 1984-09-20 | Well Mode changed to Pumping |
| 1990-03-03 | Perforation Treatment Performed - Cement Squeeze |
| 1990-03-06 | Perforation Treatment Performed - Jet Perforation |
| 1990-03-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1990-03-12 | Perforation Treatment Performed - Jet Perforation |
| 1990-03-13 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1992-06-17 | Perforation Treatment Performed - Cement Squeeze |
| 1992-06-18 | Perforation Treatment Performed - Jet Perforation |
| 2002-08-13 | Perforation Treatment Performed - Cement Squeeze |
| 2002-08-14 | Perforation Treatment Performed - Jet Perforation |
| 2002-08-15 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2011-12-31 | Well Fluid changed to Crude Oil |
| 2011-12-31 | Well Mode changed to Suspended |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1984-07-26 | Perforation | 1906.00 | 1907.00 | 14 |
| 1990-03-06 | Perforation | 1894.50 | 1895.50 | 13 |
| 1990-03-07 | Acid Treatment | 1894.50 | 1895.50 | 0 |
| 1990-03-12 | Perforation | 1855.00 | 1856.00 | 13 |
| 1990-03-13 | Acid Treatment | 1855.00 | 1856.00 | 0 |
| 1992-06-17 | Cement Squeeze | 1894.50 | 1895.50 | 0 |
| 1992-06-18 | Perforation | 1888.50 | 1890.50 | 16 |
| 2002-08-13 | Cement Squeeze | 1855.00 | 1856.00 | 0 |
| 2002-08-14 | Perforation | 1850.00 | 1853.50 | 17 |
| 2002-08-15 | Acid Treatment | 1850.50 | 1853.50 | 0 |
| 1984-07-27 | Acid Treatment | 1906.00 | 1907.00 | 0 |
| 1984-08-01 | Cement Squeeze | 1906.00 | 1907.00 | 0 |
| 1984-08-02 | Perforation | 1899.20 | 1900.20 | 14 |
| 1984-08-02 | Acid Treatment | 1899.20 | 1900.20 | 0 |
| 1984-08-03 | Perforation | 1862.50 | 1863.00 | 7 |
| 1984-08-04 | Acid Treatment | 1862.50 | 1863.00 | 0 |
| 1990-03-03 | Cement Squeeze | 1899.20 | 1900.20 | 0 |
| 1990-03-03 | Cement Squeeze | 1862.50 | 1863.00 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1984 | 2319 | 0.0 | 0.0 | 0.0 |
| 1985 | 8561 | 0.0 | 0.0 | 0.0 |
| 1986 | 7720 | 0.0 | 0.0 | 0.0 |
| 1987 | 8428 | 0.0 | 0.0 | 0.0 |
| 1988 | 8585 | 0.0 | 0.0 | 0.0 |
| 1989 | 7707 | 0.0 | 0.0 | 0.0 |
| 1990 | 8086 | 0.0 | 0.0 | 0.0 |
| 1991 | 8273 | 0.0 | 0.0 | 0.0 |
| 1992 | 8162 | 0.0 | 0.0 | 0.0 |
| 1993 | 8185 | 0.0 | 0.0 | 0.0 |
| 1994 | 8668 | 0.0 | 0.0 | 0.0 |
| 1995 | 8418 | 0.0 | 0.0 | 0.0 |
| 1996 | 8400 | 0.0 | 0.0 | 0.0 |
| 1997 | 8473 | 0.0 | 0.0 | 0.0 |
| 1998 | 8687 | 0.0 | 0.0 | 0.0 |
| 1999 | 8399 | 0.0 | 0.0 | 0.0 |
| 2000 | 8719 | 0.0 | 0.0 | 0.0 |
| 2001 | 4521 | 0.0 | 0.0 | 0.0 |
| 2002 | 3188 | 0.0 | 0.0 | 0.0 |
| 2003 | 6642 | 0.0 | 0.0 | 0.0 |
For data sources see[5]