X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394243508002

Well Details

Well ID: 0394243508002
Loading map...
Location: 00/08-35-039-24W4/2
Location Alias: 00/08-35-39-24 W4M
Location Alias 2: 00/08-35-039-24 W4/02
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 24
Section: 35
County/Municipality: Lacombe County
Well Name: FAIRBORNE CLIVE 8-35-39-24
Operator Name: Tourmaline Oil Corp.
License Number: 0107445
License Date: 1984-06-04
License Status: Suspension
Spud Date: 1984-07-02
Final Drill Date: 1984-07-14
Well Total Depth: 1914.00 m
Surface Hole Latitude: 52.395982
Surface Hole Longitude: -113.342385

For data sources see[1][2]

Well History

Date Event
1984-06-04 Obtained License
1984-07-03 Surface Casing Operation Performed
1984-07-14 Finished Drilling
1984-07-14 Well Log Performed
1984-07-14 Well Mode changed to Drilled and Cased
1984-07-16 Drill Stem Test Performed
1984-07-18 Drill Stem Test Performed
1984-07-20 Rig Released
1984-08-24 Well Log Performed
1984-08-25 Perforation Treatment Performed - Jet Perforation
1984-08-28 Well Log Performed
1984-08-29 Perforation Treatment Performed - Jet Perforation
1984-08-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-08-31 Well Log Performed
1984-09-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-09-01 Perforation Treatment Performed - Jet Perforation
1984-09-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-10-12 Well Began Production
1984-10-12 Well Fluid changed to Crude Oil
1984-10-12 Well Mode changed to Pumping
1987-02-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-02-27 Perforation Treatment Performed - Jet Perforation
1987-02-28 Perforation Treatment Performed - Acid Wash - No Pressure
1991-04-17 Perforation Treatment Performed - Cement Squeeze
1991-04-20 Perforation Treatment Performed - Jet Perforation
1991-04-23 Perforation Treatment Performed - Jet Perforation
1991-04-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-04-26 Perforation Treatment Performed - Cement Squeeze
1991-05-01 Perforation Treatment Performed - Jet Perforation
1991-05-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-05-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-05-07 Perforation Treatment Performed - Jet Perforation
1991-05-08 Perforation Treatment Performed - Cement Plug
1991-05-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-05-10 Perforation Treatment Performed - Jet Perforation
1991-05-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-05-25 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-12-31 Well Fluid changed to Crude Oil
2011-12-31 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-08-25 Perforation 1876.50 1877.00 8
1991-04-17 Cement Squeeze 1869.00 1870.00 0
1991-04-17 Cement Squeeze 1833.50 1836.00 0
1991-04-20 Perforation 1866.50 1868.00 16
1991-04-23 Perforation 1865.00 1866.00 16
1991-04-24 Acid Treatment 1865.00 1866.00 0
1991-04-26 Cement Squeeze 1865.00 1866.00 0
1991-05-01 Perforation 1863.00 1865.00 18
1991-05-02 Acid Treatment 1863.00 1865.00 0
1991-05-04 Packing Device Capped w/Cement 1850.50 1855.00 0
1991-05-07 Perforation 1832.00 1833.00 18
1984-08-29 Perforation 1835.50 1836.00 7
1991-05-08 Cement Plug 1843.00 1850.50 0
1991-05-09 Acid Treatment 1832.00 1833.00 0
1991-05-10 Perforation 1833.00 1835.00 18
1991-05-11 Acid Treatment 1832.00 1835.00 0
1992-05-25 Acid Treatment 1832.00 1835.00 0
1984-08-30 Acid Treatment 1835.50 1836.00 0
1984-09-01 Perforation 1833.50 1834.50 0
1984-09-01 Acid Treatment 1833.50 1834.50 0
1984-09-08 Acid Treatment 1833.50 1836.00 0
1987-02-27 Acid Treatment 1833.50 1836.00 0
1987-02-27 Perforation 1869.00 1870.00 13
1987-02-28 Acid Wash 1833.50 1870.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 1848 0.0 0.0 0.0
1985 8669 0.0 0.0 0.0
1986 8299 0.0 0.0 0.0
1987 8109 0.0 0.0 0.0
1988 8613 0.0 0.0 0.0
1989 7827 0.0 0.0 0.0
1990 8527 0.0 0.0 0.0
1991 6787 0.0 0.0 0.0
1992 7958 0.0 0.0 0.0
1993 7981 0.0 0.0 0.0
1994 8676 0.0 0.0 0.0
1995 8378 0.0 0.0 0.0
1996 8128 0.0 0.0 0.0
1997 7942 0.0 0.0 0.0
1998 7801 0.0 0.0 0.0
1999 1368 0.0 0.0 0.0
2000 1848 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2006-10-02 No Incident Encountered 0.00 0.00

For data sources see[6]

References