0394243504000

Well Details

Well ID: 0394243504000
Loading map...
Location: 00/04-35-039-24W4/0
Location Alias: 00/04-35-39-24 W4M
Location Alias 2: 00/04-35-039-24 W4/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 24
Section: 35
County/Municipality: Lacombe County
Well Name: FAIRBORNE CLIVE 4-35-39-24
Operator Name: Tourmaline Oil Corp.
License Number: 0030548
License Date: 1966-06-10
License Status: Abandoned
Spud Date: 1966-06-14
Final Drill Date: 1966-06-25
Well Total Depth: 1902.90 m
Surface Hole Latitude: 52.392316
Surface Hole Longitude: -113.359379

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1966-06-10 Obtained License
1966-06-25 Finished Drilling
1966-06-25 Production Casing Operation Performed
1966-06-25 Well Mode changed to Drilled and Cased
1966-06-26 Perforation Treatment Performed - Jet Perforation
1966-06-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-06-27 Perforation Treatment Performed - Acid Wash - No Pressure
1966-07-01 Well Began Production
1966-07-01 Well Fluid changed to Crude Oil
1966-07-01 Well Mode changed to Flowing
1966-07-06 Well Fluid changed to Crude Oil
1966-07-06 Well Mode changed to Flowing
1979-12-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-01-15 Well Fluid changed to Crude Oil
1981-01-15 Well Mode changed to Pumping
1986-09-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1986-09-18 Perforation Treatment Performed - Cement Squeeze
1986-09-18 Plug Back Performed
1986-09-18 Well Fluid changed to Crude Oil
1986-09-18 Well Mode changed to Abandoned Zone
1986-09-19 Perforation Treatment Performed - Jet Perforation
1986-09-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-04-06 Perforation Treatment Performed - Cement Squeeze
1990-04-06 Plug Back Performed
1990-04-11 Perforation Treatment Performed - Jet Perforation
1990-04-12 Perforation Treatment Performed - Cement Squeeze
1990-04-12 Perforation Treatment Performed - Jet Perforation
1990-04-12 Well Fluid changed to Crude Oil
1990-04-12 Well Mode changed to Pumping
1990-04-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-04-30 Well Fluid changed to Crude Oil
1996-04-30 Well Mode changed to Suspended
2001-05-30 Well Log Performed
2001-05-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-05-31 Perforation Treatment Performed - Cement Squeeze
2001-05-31 Plug Back Performed
2001-05-31 Well Fluid changed to Crude Oil
2001-05-31 Well Mode changed to Abandoned Zone
2001-06-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-06-01 Perforation Treatment Performed - Jet Perforation
2001-06-01 Perforation Treatment Performed - Remedial Casing
2001-06-01 Well Log Performed
2001-07-08 Well Abandoned
2001-07-08 Well Fluid changed to Crude Oil
2001-07-08 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1966-06-26 Perforation 1873.30 1874.20 7
1986-09-19 Perforation 1832.00 1833.00 13
1986-09-20 Acid Treatment 1832.00 1833.00 0
1990-04-06 Cement Squeeze 1832.00 1842.50 0
1990-04-11 Perforation 1873.30 1874.20 13
1990-04-12 Cement Squeeze 1873.30 1874.20 0
1990-04-12 Perforation 1866.90 1869.10 13
1990-04-13 Acid Treatment 1866.90 1869.10 0
2001-05-31 Cement Squeeze 1866.90 1869.10 0
2001-05-31 Packing Device Capped w/Cement 1683.80 1855.00 0
2001-06-01 Perforation 246.00 247.00 13
1966-06-26 Perforation 1841.60 1842.50 7
2001-06-01 Remedial Casing Cementing 246.00 247.00 0
2001-06-01 Packing Device Capped w/Cement 158.00 247.00 0
1966-06-27 Acid Wash 1873.30 1874.20 0
1966-06-27 Acid Wash 1841.60 1842.50 0
1966-06-27 Acid Treatment 1873.30 1874.20 0
1966-06-27 Acid Treatment 1841.60 1842.50 0
1979-12-22 Acid Treatment 1841.60 1842.50 0
1986-09-18 Packing Device Capped w/Cement 1838.90 1854.60 0
1986-09-18 Cement Squeeze 1841.60 1842.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1966 0 0.0 0.0 0.0
1967 2563 0.0 0.0 0.0
1968 2679 0.0 0.0 0.0
1969 3286 0.0 0.0 0.0
1970 1984 0.0 0.0 0.0
1972 5248 0.0 0.0 0.0
1973 8038 0.0 0.0 0.0
1974 3368 0.0 0.0 0.0
1975 7813 0.0 0.0 0.0
1976 8474 0.0 0.0 0.0
1977 8333 0.0 0.0 0.0
1978 7575 0.0 0.0 0.0
1979 7503 0.0 0.0 0.0
1980 6372 0.0 0.0 0.0
1981 8019 0.0 0.0 0.0
1982 7196 0.0 0.0 0.0
1983 8491 0.0 0.0 0.0
1984 8201 0.0 0.0 0.0
1985 3516 0.0 0.0 0.0
1990 5884 0.0 0.0 0.0
1991 8135 0.0 0.0 0.0
1992 1752 0.0 0.0 0.0

For data sources see[5]

References