If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0394243306000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.39405,"lon":-113.405264,"icon":""}]} |
Location: 00/06-33-039-24W4/0 | |
Location Alias: 00/06-33-39-24 W4M | |
Location Alias 2: 00/06-33-039-24 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 039 | |
Meridian: 4 | |
Range: 24 | |
Section: 33 | |
County/Municipality: Lacombe County | |
Well Name: EMBER ET AL CLIVE 6-33-39-24 | |
Operator Name: Ember Resources Inc. | |
License Number: 0420835 | |
License Date: 2010-06-02 | |
License Status: Issued | |
Spud Date: 2010-08-08 | |
Final Drill Date: 2010-08-09 | |
Well Total Depth: 878.00 m | |
Surface Hole Latitude: 52.394050 | |
Surface Hole Longitude: -113.405264 |
Date | Event |
---|---|
2010-06-02 | Obtained License |
2010-08-08 | Surface Casing Operation Performed |
2010-08-09 | Finished Drilling |
2010-08-09 | Production Casing Operation Performed |
2010-08-09 | Rig Released |
2010-08-09 | Well Mode changed to Drilled and Cased |
2010-08-27 | Well Log Performed |
2010-09-27 | Perforation Treatment Performed - Jet Perforation |
2010-09-27 | Well Log Performed |
2010-10-15 | Well Began Production |
2010-10-15 | Well Fluid changed to Gas |
2010-10-15 | Well Mode changed to Flowing |
2010-11-02 | Perforation Treatment Performed - Jet Perforation |
2010-11-02 | Well Fluid changed to Coalbed Methane-Coals and Other |
2010-11-02 | Well Log Performed |
2010-11-02 | Well Mode changed to Flowing |
2010-12-22 | Perforation Treatment Performed - Fractured |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-09-27 | Perforation | 590.00 | 591.00 | 17 |
2010-11-02 | Perforation | 477.00 | 479.00 | 17 |
2010-11-02 | Perforation | 460.50 | 462.00 | 17 |
2010-11-02 | Perforation | 449.50 | 452.00 | 17 |
2010-11-02 | Perforation | 433.00 | 433.50 | 17 |
2010-11-02 | Perforation | 425.70 | 426.20 | 17 |
2010-11-02 | Perforation | 418.50 | 419.00 | 17 |
2010-11-02 | Perforation | 411.50 | 412.50 | 17 |
2010-11-02 | Perforation | 406.00 | 406.50 | 17 |
2010-11-02 | Perforation | 347.00 | 347.50 | 17 |
2010-12-22 | Fracture | 547.50 | 548.50 | 0 |
2010-09-27 | Perforation | 588.00 | 589.00 | 17 |
2010-12-22 | Fracture | 542.00 | 543.00 | 0 |
2010-12-22 | Fracture | 537.00 | 539.50 | 0 |
2010-12-22 | Fracture | 522.00 | 523.00 | 0 |
2010-12-22 | Fracture | 516.50 | 517.50 | 0 |
2010-12-22 | Fracture | 503.50 | 504.00 | 0 |
2010-12-22 | Fracture | 477.00 | 479.00 | 0 |
2010-12-22 | Fracture | 460.50 | 462.00 | 0 |
2010-12-22 | Fracture | 449.50 | 452.00 | 0 |
2010-12-22 | Fracture | 433.00 | 433.50 | 0 |
2010-12-22 | Fracture | 425.70 | 426.20 | 0 |
2010-09-27 | Perforation | 577.50 | 578.50 | 17 |
2010-12-22 | Fracture | 418.50 | 419.00 | 0 |
2010-12-22 | Fracture | 411.50 | 412.50 | 0 |
2010-12-22 | Fracture | 406.00 | 406.50 | 0 |
2010-12-22 | Fracture | 347.00 | 347.50 | 0 |
2010-11-02 | Perforation | 547.50 | 548.50 | 17 |
2010-11-02 | Perforation | 542.00 | 543.00 | 17 |
2010-11-02 | Perforation | 537.00 | 539.50 | 17 |
2010-11-02 | Perforation | 522.00 | 523.00 | 17 |
2010-11-02 | Perforation | 516.50 | 517.50 | 17 |
2010-11-02 | Perforation | 503.50 | 504.00 | 17 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 1754 | 0.0 | 0.0 | 0.0 |
2011 | 8757 | 0.0 | 0.0 | 0.0 |
2012 | 8778 | 0.0 | 0.0 | 0.0 |
2013 | 8759 | 0.0 | 0.0 | 0.0 |
2014 | 8759 | 0.0 | 0.0 | 0.0 |
2015 | 8754 | 0.0 | 0.0 | 0.0 |
2016 | 8698 | 0.0 | 0.0 | 0.0 |
2017 | 8341 | 0.0 | 0.0 | 0.0 |
2018 | 8361 | 0.0 | 0.0 | 0.0 |
2019 | 8035 | 0.0 | 0.0 | 0.0 |
2020 | 2011 | 0.0 | 0.0 | 0.0 |
For data sources see[5]