If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0394243206002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.397103,"lon":-113.428519,"icon":""}]} |
Location: 00/06-32-039-24W4/2 | |
Location Alias: 00/06-32-39-24 W4M | |
Location Alias 2: 00/06-32-039-24 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 039 | |
Meridian: 4 | |
Range: 24 | |
Section: 32 | |
County/Municipality: Lacombe County | |
Well Name: EMBER CLIVE 6-32-39-24 | |
Operator Name: Ember Resources Inc. | |
License Number: 0100591 | |
License Date: 1983-02-15 | |
License Status: Issued | |
Spud Date: 1983-02-17 | |
Final Drill Date: 1983-02-22 | |
Well Total Depth: 870.00 m | |
Surface Hole Latitude: 52.397103 | |
Surface Hole Longitude: -113.428519 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1983-02-15 | Obtained License |
1983-02-22 | Finished Drilling |
1983-02-22 | Well Mode changed to Drilled and Cased |
1983-02-23 | Drill Stem Test Performed |
1983-02-24 | Drill Stem Test Performed |
1983-02-25 | Production Casing Operation Performed |
1984-09-17 | Perforation Treatment Performed - Jet Perforation |
1991-12-03 | Perforation Treatment Performed - Jet Perforation |
1991-12-06 | Well Began Production |
1991-12-06 | Well Fluid changed to Gas |
1991-12-06 | Well Mode changed to Flowing |
1993-02-28 | Well Fluid changed to Gas |
1993-02-28 | Well Mode changed to Suspended |
1994-02-11 | Perforation Treatment Performed - Jet Perforation |
1994-02-12 | Perforation Treatment Performed - Jet Perforation |
1994-02-18 | Perforation Treatment Performed - Fractured |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1984-09-17 | Perforation | 837.50 | 842.40 | 6 |
1984-09-17 | Perforation | 843.80 | 845.50 | 6 |
1991-12-03 | Perforation | 667.50 | 670.50 | 13 |
1991-12-03 | Perforation | 592.00 | 593.50 | 13 |
1994-02-11 | Perforation | 837.50 | 842.40 | 13 |
1994-02-11 | Perforation | 843.80 | 845.50 | 13 |
1994-02-12 | Perforation | 837.50 | 842.40 | 13 |
1994-02-18 | Fracture | 837.50 | 845.50 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1991 | 573 | 0.0 | 0.0 | 0.0 |
1992 | 1983 | 0.0 | 0.0 | 0.0 |
For data sources see[5]