X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394242616002

Well Details

Well ID: 0394242616002
Loading map...
Location: 00/16-26-039-24W4/2
Location Alias: 00/16-26-39-24 W4M
Location Alias 2: 00/16-26-039-24 W4/02
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 24
Section: 26
County/Municipality: Lacombe County
Well Name: EMBER CLIVE 16-26-39-24
Operator Name: Ember Resources Inc.
License Number: 0082643
License Date: 1980-05-07
License Status: Suspension
Spud Date: 1980-06-14
Final Drill Date: 1980-06-26
Well Total Depth: 1878.70 m
Surface Hole Latitude: 52.388756
Surface Hole Longitude: -113.343176

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-05-07 Obtained License
1980-06-26 Finished Drilling
1980-06-26 Well Log Performed
1980-06-26 Well Mode changed to Drilled and Cased
1980-06-27 Production Casing Operation Performed
1980-07-23 Perforation Treatment Performed - Jet Perforation
1980-07-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-07-25 Perforation Treatment Performed - Jet Perforation
1980-07-25 Well Began Production
1980-07-25 Well Fluid changed to Crude Oil
1980-07-25 Well Mode changed to Flowing
1980-07-26 Perforation Treatment Performed - Acid Wash - No Pressure
1980-07-30 Perforation Treatment Performed - Cement Squeeze
1980-08-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-08-01 Perforation Treatment Performed - Jet Perforation
1980-08-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-08-12 Perforation Treatment Performed - Cement Squeeze
1980-08-13 Perforation Treatment Performed - Jet Perforation
1980-09-01 Well Fluid changed to Crude Oil
1980-09-01 Well Mode changed to Suspended
2003-01-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-01-21 Plug Back Performed
2003-01-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-01-22 Plug Back Performed
2003-01-22 Well Fluid changed to Crude Oil
2003-01-22 Well Mode changed to Abandoned Zone
2003-01-24 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-07-23 Perforation 1857.00 1859.00 13
1980-08-13 Perforation 1824.50 1826.50 13
2003-01-21 Packing Device Capped w/Cement 1840.80 1848.80 0
2003-01-22 Packing Device Capped w/Cement 1812.00 1820.00 0
2003-01-24 Perforation 1414.50 1417.50 17
1980-07-24 Acid Treatment 1857.00 1859.00 0
1980-07-25 Perforation 1833.00 1834.50 13
1980-07-26 Acid Wash 1833.00 1834.50 0
1980-07-30 Cement Squeeze 1833.00 1834.50 0
1980-08-01 Perforation 1824.50 1827.50 13
1980-08-01 Acid Treatment 1824.50 1827.50 0
1980-08-07 Acid Treatment 1824.50 1827.50 0
1980-08-12 Cement Squeeze 1824.50 1827.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 7 0.0 0.0 0.0

For data sources see[5]

References