X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394242610002

Well Details

Well ID: 0394242610002
Loading map...
Location: 00/10-26-039-24W4/2
Location Alias: 00/10-26-39-24 W4M
Location Alias 2: 00/10-26-039-24 W4/02
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 24
Section: 26
County/Municipality: Lacombe County
Well Name: FAIRBORNE CLIVE 10-26-39-24
Operator Name: Tourmaline Oil Corp.
License Number: 0030789
License Date: 1966-08-08
License Status: Suspension
Spud Date: 1966-08-12
Final Drill Date: 1966-08-24
Well Total Depth: 1907.70 m
Surface Hole Latitude: 52.385144
Surface Hole Longitude: -113.348432

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1966-08-08 Obtained License
1966-08-24 Finished Drilling
1966-08-24 Well Mode changed to Drilled and Cased
1966-08-25 Drill Stem Test Performed
1966-08-26 Drill Stem Test Performed
1966-08-27 Drill Stem Test Performed
1966-08-28 Drill Stem Test Performed
1966-08-29 Drill Stem Test Performed
1966-08-30 Production Casing Operation Performed
1966-09-04 Perforation Treatment Performed - Jet Perforation
1966-09-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-09-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-09-08 Perforation Treatment Performed - Jet Perforation
1966-09-09 Well Began Production
1966-09-09 Well Fluid changed to Crude Oil
1966-09-09 Well Mode changed to Flowing
1979-07-19 Well Fluid changed to Crude Oil
1979-07-19 Well Mode changed to Pumping
1992-09-29 Well Log Performed
1992-09-30 Perforation Treatment Performed - Cement Squeeze
1992-10-01 Perforation Treatment Performed - Jet Perforation
1992-10-01 Well Log Performed
1992-10-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-10-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-11-26 Perforation Treatment Performed - Cement Squeeze
1995-11-26 Plug Back Performed
1995-11-29 Well Log Performed
1995-11-30 Perforation Treatment Performed - Jet Perforation
1995-12-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-12-06 Well Fluid changed to Crude Oil
1995-12-06 Well Log Performed
1995-12-06 Well Mode changed to Suspended
1995-12-07 Perforation Treatment Performed - Jet Perforation
1995-12-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-12-14 Perforation Treatment Performed - Cement Squeeze
1995-12-14 Plug Back Performed
2002-09-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-09-30 Perforation Treatment Performed - Jet Perforation
2002-10-02 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-10-09 Well Fluid changed to Crude Oil
2002-10-09 Well Mode changed to Pumping
2011-12-31 Well Fluid changed to Crude Oil
2011-12-31 Well Mode changed to Suspended
2016-07-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2016-07-06 Perforation Treatment Performed - Cement Squeeze
2016-07-06 Plug Back Performed
2016-07-06 Well Fluid changed to Crude Oil
2016-07-06 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1966-09-04 Perforation 1876.30 1878.20 3
1995-11-30 Perforation 1868.00 1871.00 17
1995-12-04 Acid Treatment 1868.00 1871.00 0
1995-12-07 Perforation 1843.50 1846.50 17
1995-12-10 Acid Treatment 1843.50 1846.50 0
1995-12-14 Cement Squeeze 1843.50 1846.50 0
2002-09-29 Packing Device Capped w/Cement 1847.00 1855.00 0
2002-09-30 Perforation 1832.50 1840.00 17
2002-10-02 Acid Treatment 1832.50 1840.00 0
2016-07-06 Cement Squeeze 1832.50 1840.00 0
2016-07-06 Packing Device Capped w/Cement 1780.00 1830.80 0
1966-09-06 Acid Treatment 1876.30 1878.20 0
1966-09-08 Perforation 1848.90 1850.70 7
1966-09-08 Acid Treatment 1848.90 1850.70 0
1992-09-30 Cement Squeeze 1876.30 1878.20 0
1992-10-01 Perforation 1873.30 1874.50 18
1992-10-02 Acid Treatment 1873.30 1874.50 0
1992-10-06 Acid Treatment 1848.90 1850.70 0
1995-11-26 Cement Squeeze 1848.90 1874.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1966 0 0.0 0.0 0.0
1967 3576 0.0 0.0 0.0
1968 4000 0.0 0.0 0.0
1969 2498 0.0 0.0 0.0
1970 1604 0.0 0.0 0.0
1972 3308 0.0 0.0 0.0
1973 4398 0.0 0.0 0.0
1974 24 0.0 0.0 0.0
1975 5397 0.0 0.0 0.0
1976 5575 0.0 0.0 0.0
1977 7732 0.0 0.0 0.0
1978 7264 0.0 0.0 0.0
1979 6893 0.0 0.0 0.0
1980 8135 0.0 0.0 0.0
1981 8759 0.0 0.0 0.0
1982 7917 0.0 0.0 0.0
1983 8623 0.0 0.0 0.0
1984 8309 0.0 0.0 0.0
1985 8340 0.0 0.0 0.0
1986 7932 0.0 0.0 0.0
1987 8428 0.0 0.0 0.0
1988 8375 0.0 0.0 0.0
1989 8055 0.0 0.0 0.0
1990 8388 0.0 0.0 0.0
1991 8127 0.0 0.0 0.0
1992 8380 0.0 0.0 0.0
1993 8315 0.0 0.0 0.0
1994 8395 0.0 0.0 0.0
1995 3630 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-07-07 No Incident Encountered 0.00 0.00

For data sources see[6]

References