If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0394242609002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.384771,"lon":-113.342499,"icon":""}]} |
| Location: 00/09-26-039-24W4/2 | |
| Location Alias: 00/09-26-39-24 W4M | |
| Location Alias 2: 00/09-26-039-24 W4/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 039 | |
| Meridian: 4 | |
| Range: 24 | |
| Section: 26 | |
| County/Municipality: Lacombe County | |
| Well Name: FAIRBORNE CLIVE 9-26-39-24 | |
| Operator Name: Tourmaline Oil Corp. | |
| License Number: 0141553 | |
| License Date: 1989-10-27 | |
| License Status: Suspension | |
| Spud Date: 1989-11-26 | |
| Final Drill Date: 1989-12-06 | |
| Well Total Depth: 1915.00 m | |
| Surface Hole Latitude: 52.384771 | |
| Surface Hole Longitude: -113.342499 |
| Date | Event |
|---|---|
| 1989-10-27 | Obtained License |
| 1989-11-26 | Lost Circulation Occurred |
| 1989-11-27 | Surface Casing Operation Performed |
| 1989-12-06 | Finished Drilling |
| 1989-12-06 | Well Mode changed to Drilled and Cased |
| 1989-12-07 | Drill Stem Test Performed |
| 1989-12-07 | Well Log Performed |
| 1989-12-09 | Production Casing Operation Performed |
| 1989-12-10 | Rig Released |
| 1989-12-15 | Perforation Treatment Performed - Jet Perforation |
| 1989-12-15 | Well Log Performed |
| 1989-12-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1989-12-19 | Well Log Performed |
| 1989-12-20 | Perforation Treatment Performed - Cement Squeeze |
| 1989-12-20 | Perforation Treatment Performed - Jet Perforation |
| 1989-12-20 | Well Log Performed |
| 1989-12-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1989-12-28 | Perforation Treatment Performed - Jet Perforation |
| 1989-12-28 | Well Log Performed |
| 1989-12-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1990-01-01 | Well Began Production |
| 1990-01-01 | Well Fluid changed to Crude Oil |
| 1990-01-01 | Well Mode changed to Flowing |
| 1990-01-10 | Well Fluid changed to Crude Oil |
| 1990-01-10 | Well Mode changed to Pumping |
| 1992-12-01 | Perforation Treatment Performed - Cement Squeeze |
| 1992-12-01 | Well Log Performed |
| 1992-12-02 | Perforation Treatment Performed - Jet Perforation |
| 1992-12-02 | Well Log Performed |
| 1992-12-03 | Well Log Performed |
| 1992-12-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2007-07-21 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2007-07-21 | Plug Back Performed |
| 2007-07-22 | Well Log Performed |
| 2011-12-31 | Well Fluid changed to Crude Oil |
| 2011-12-31 | Well Mode changed to Suspended |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1989-12-15 | Perforation | 1879.30 | 1879.80 | 13 |
| 1992-12-02 | Perforation | 1870.00 | 1872.00 | 18 |
| 1992-12-07 | Acid Treatment | 1868.00 | 1872.00 | 0 |
| 2007-07-21 | Packing Device Capped w/Cement | 1848.00 | 1856.00 | 0 |
| 1989-12-18 | Acid Treatment | 1879.30 | 1879.80 | 0 |
| 1989-12-20 | Cement Squeeze | 1879.30 | 1879.80 | 0 |
| 1989-12-20 | Perforation | 1873.50 | 1875.00 | 13 |
| 1989-12-21 | Acid Treatment | 1873.50 | 1875.00 | 0 |
| 1989-12-28 | Perforation | 1839.00 | 1840.00 | 13 |
| 1989-12-29 | Acid Treatment | 1839.00 | 1840.00 | 0 |
| 1992-12-01 | Cement Squeeze | 1873.50 | 1875.00 | 0 |
| 1992-12-02 | Perforation | 1868.00 | 1869.50 | 18 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1990 | 7987 | 0.0 | 0.0 | 0.0 |
| 1991 | 8295 | 0.0 | 0.0 | 0.0 |
| 1992 | 8270 | 0.0 | 0.0 | 0.0 |
| 1993 | 8230 | 0.0 | 0.0 | 0.0 |
| 1994 | 8682 | 0.0 | 0.0 | 0.0 |
| 1995 | 8408 | 0.0 | 0.0 | 0.0 |
| 1996 | 8704 | 0.0 | 0.0 | 0.0 |
| 1997 | 8483 | 0.0 | 0.0 | 0.0 |
| 1998 | 8711 | 0.0 | 0.0 | 0.0 |
| 1999 | 8458 | 0.0 | 0.0 | 0.0 |
| 2000 | 8759 | 0.0 | 0.0 | 0.0 |
| 2001 | 2991 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 1989-11-26 | Lost Circulation | 28.00 | 208.00 |
For data sources see[6]