X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394242609000

Well Details

Well ID: 0394242609000
Loading map...
Location: 00/09-26-039-24W4/0
Location Alias: 00/09-26-39-24 W4M
Location Alias 2: 00/09-26-039-24 W4/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 24
Section: 26
County/Municipality: Lacombe County
Well Name: FAIRBORNE CLIVE 9-26-39-24
Operator Name: Tourmaline Oil Corp.
License Number: 0141553
License Date: 1989-10-27
License Status: Suspension
Spud Date: 1989-11-26
Final Drill Date: 1989-12-06
Well Total Depth: 1915.00 m
Surface Hole Latitude: 52.384771
Surface Hole Longitude: -113.342499

For data sources see[1][2]

Well History

Date Event
1989-10-27 Obtained License
1989-11-26 Lost Circulation Occurred
1989-11-27 Surface Casing Operation Performed
1989-12-06 Finished Drilling
1989-12-06 Well Mode changed to Drilled and Cased
1989-12-07 Drill Stem Test Performed
1989-12-07 Well Log Performed
1989-12-09 Production Casing Operation Performed
1989-12-10 Rig Released
1989-12-15 Perforation Treatment Performed - Jet Perforation
1989-12-15 Well Log Performed
1989-12-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-12-19 Well Log Performed
1989-12-20 Perforation Treatment Performed - Cement Squeeze
1989-12-20 Perforation Treatment Performed - Jet Perforation
1989-12-20 Well Log Performed
1989-12-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-12-28 Perforation Treatment Performed - Jet Perforation
1989-12-28 Well Log Performed
1989-12-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-01-01 Well Began Production
1990-01-01 Well Fluid changed to Crude Oil
1990-01-01 Well Mode changed to Flowing
1990-01-10 Well Fluid changed to Crude Oil
1990-01-10 Well Mode changed to Pumping
1992-12-01 Perforation Treatment Performed - Cement Squeeze
1992-12-01 Well Log Performed
1992-12-02 Perforation Treatment Performed - Jet Perforation
1992-12-02 Well Log Performed
1992-12-03 Well Log Performed
1992-12-07 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-07-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-07-21 Plug Back Performed
2007-07-21 Well Fluid changed to Crude Oil
2007-07-21 Well Mode changed to Abandoned Zone
2007-07-22 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1989-12-15 Perforation 1879.30 1879.80 13
1992-12-02 Perforation 1870.00 1872.00 18
1992-12-07 Acid Treatment 1868.00 1872.00 0
2007-07-21 Packing Device Capped w/Cement 1848.00 1856.00 0
1989-12-18 Acid Treatment 1879.30 1879.80 0
1989-12-20 Cement Squeeze 1879.30 1879.80 0
1989-12-20 Perforation 1873.50 1875.00 13
1989-12-21 Acid Treatment 1873.50 1875.00 0
1989-12-28 Perforation 1839.00 1840.00 13
1989-12-29 Acid Treatment 1839.00 1840.00 0
1992-12-01 Cement Squeeze 1873.50 1875.00 0
1992-12-02 Perforation 1868.00 1869.50 18

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1990 7913 0.0 0.0 0.0
1991 8281 0.0 0.0 0.0
1992 8127 0.0 0.0 0.0
1993 7614 0.0 0.0 0.0
1994 8730 0.0 0.0 0.0
1995 8179 0.0 0.0 0.0
1996 8704 0.0 0.0 0.0
1997 8483 0.0 0.0 0.0
1998 8759 0.0 0.0 0.0
1999 8468 0.0 0.0 0.0
2000 8771 0.0 0.0 0.0
2001 8529 0.0 0.0 0.0
2002 8373 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1989-11-26 Lost Circulation 28.00 208.00

For data sources see[6]

References