X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394242603032

Well Details

Well ID: 0394242603032
Loading map...
Location: 03/03-26-039-24W4/2
Location Alias: 03/03-26-39-24 W4M
Location Alias 2: 03/03-26-039-24 W4/02
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 24
Section: 26
County/Municipality: Lacombe County
Well Name: EMBER 103 CLIVE 3-26-39-24
Operator Name: Ember Resources Inc.
License Number: 0288173
License Date: 2003-06-09
License Status: Issued
Spud Date: 2003-07-06
Final Drill Date: 2003-07-12
Well Total Depth: 562.00 m
Surface Hole Latitude: 52.378897
Surface Hole Longitude: -113.353613

For data sources see[1][2]

Well History

Date Event
2003-06-09 Obtained License
2003-07-06 Surface Casing Operation Performed
2003-07-12 Finished Drilling
2003-07-12 Well Mode changed to Drilled and Cased
2003-07-13 Production Casing Operation Performed
2003-07-13 Rig Released
2003-07-21 Well Log Performed
2003-07-23 Perforation Treatment Performed - Jet Perforation
2003-07-23 Well Log Performed
2003-08-13 Perforation Treatment Performed - Fractured
2003-11-24 Perforation Treatment Performed - Cement Squeeze
2003-11-24 Plug Back Performed
2003-11-30 Well Log Performed
2003-12-01 Perforation Treatment Performed - Jet Perforation
2003-12-05 Perforation Treatment Performed - Fractured
2003-12-18 Well Began Production
2003-12-18 Well Fluid changed to Coalbed Methane-Coals Only
2003-12-18 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2003-07-23 Perforation 471.50 475.50 20
2003-12-01 Perforation 404.50 406.00 13
2003-12-01 Perforation 424.50 426.00 13
2003-12-01 Perforation 436.00 437.50 13
2003-12-01 Perforation 442.00 443.00 13
2003-12-01 Perforation 455.50 457.00 13
2003-12-01 Perforation 465.00 466.50 13
2003-12-01 Perforation 478.00 479.50 13
2003-12-01 Perforation 485.00 486.00 13
2003-12-01 Perforation 494.00 495.50 13
2003-12-01 Perforation 500.50 502.00 13
2003-07-23 Perforation 337.00 341.50 20
2003-12-01 Perforation 518.00 521.00 13
2003-12-01 Perforation 528.00 530.00 13
2003-12-05 Fracture 375.00 376.50 0
2003-12-05 Fracture 390.00 393.00 0
2003-12-05 Fracture 404.50 406.00 0
2003-12-05 Fracture 424.50 426.00 0
2003-12-05 Fracture 436.00 437.50 0
2003-12-05 Fracture 442.00 443.00 0
2003-12-05 Fracture 455.50 457.00 0
2003-12-05 Fracture 465.00 466.50 0
2003-07-23 Perforation 318.00 321.50 20
2003-12-05 Fracture 478.00 479.50 0
2003-12-05 Fracture 485.00 486.00 0
2003-12-05 Fracture 494.00 495.50 0
2003-12-05 Fracture 500.50 502.00 0
2003-12-05 Fracture 518.00 521.00 0
2003-12-05 Fracture 528.00 530.00 0
2003-08-13 Fracture 471.50 475.50 0
2003-08-13 Fracture 337.00 341.50 0
2003-08-13 Fracture 318.00 321.50 0
2003-11-24 Cement Squeeze 318.00 475.50 0
2003-12-01 Perforation 375.00 376.50 13
2003-12-01 Perforation 390.00 393.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 312 0.0 0.0 0.0
2004 8535 0.0 0.0 0.0
2005 8556 0.0 0.0 0.0
2006 8179 0.0 0.0 0.0
2007 8728 0.0 0.0 0.0
2008 8757 0.0 0.0 0.0
2009 7979 0.0 0.0 0.0
2010 8751 0.0 0.0 0.0
2011 8021 0.0 0.0 0.0
2012 8476 0.0 0.0 0.0
2013 8754 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8756 0.0 0.0 0.0
2016 8732 0.0 0.0 0.0
2017 6804 0.0 0.0 0.0
2018 6614 0.0 0.0 0.0
2019 7059 0.0 0.0 0.0
2020 1763 0.0 0.0 0.0

For data sources see[5]

References