X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394242512002

Well Details

Well ID: 0394242512002
Loading map...
Location: 00/12-25-039-24W4/2
Location Alias: 00/12-25-39-24 W4M
Location Alias 2: 00/12-25-039-24 W4/02
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 24
Section: 25
County/Municipality: Lacombe County
Well Name: FAIRBORNE CLIVE 12-25-39-24
Operator Name: Tourmaline Oil Corp.
License Number: 0030827
License Date: 1966-08-16
License Status: Suspension
Spud Date: 1966-08-16
Final Drill Date: 1966-08-25
Well Total Depth: 1882.10 m
Surface Hole Latitude: 52.385702
Surface Hole Longitude: -113.337201

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1966-08-16 Obtained License
1966-08-25 Finished Drilling
1966-08-25 Well Mode changed to Drilled and Cased
1966-08-26 Production Casing Operation Performed
1966-08-30 Perforation Treatment Performed - Bullet Perforation
1966-08-31 Perforation Treatment Performed - Acid Wash - No Pressure
1966-09-16 Perforation Treatment Performed - Jet Perforation
1966-09-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-09-18 Well Began Production
1966-09-18 Well Fluid changed to Crude Oil
1966-09-18 Well Mode changed to Flowing
1966-11-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-11-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-11-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-04-09 Well Fluid changed to Crude Oil
1985-04-09 Well Mode changed to Pumping
1992-02-06 Well Log Performed
1992-02-08 Perforation Treatment Performed - Cement Squeeze
1992-02-10 Well Log Performed
1992-02-11 Perforation Treatment Performed - Jet Perforation
1992-02-12 Well Log Performed
1992-02-13 Perforation Treatment Performed - Jet Perforation
1992-02-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-02-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-02-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-03-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-03-10 Perforation Treatment Performed - Acid Wash - No Pressure
2003-05-03 Perforation Treatment Performed - Cement Squeeze
2003-05-03 Plug Back Performed
2003-05-03 Well Fluid changed to Crude Oil
2003-05-03 Well Mode changed to Abandoned Zone
2003-05-10 Perforation Treatment Performed - Jet Perforation
2003-05-11 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-05-14 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-05-14 Perforation Treatment Performed - Jet Perforation
2016-06-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2016-06-29 Perforation Treatment Performed - Cement Squeeze
2016-06-29 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1966-08-30 Bullet Perforation 1853.20 1854.40 7
1992-02-13 Perforation 1820.30 1823.30 20
1992-02-14 Acid Treatment 1820.30 1823.30 0
1992-02-15 Acid Treatment 1820.30 1823.30 0
1992-02-20 Acid Treatment 1820.30 1823.30 0
1992-03-16 Acid Treatment 1820.30 1823.30 0
1998-03-10 Acid Wash 1820.30 1823.30 0
2003-05-03 Cement Squeeze 1849.50 1851.00 0
2003-05-03 Cement Squeeze 1820.30 1823.30 0
2003-05-10 Perforation 1863.50 1866.00 17
2003-05-10 Perforation 1858.00 1860.00 17
1966-08-31 Acid Wash 1853.20 1854.40 0
2003-05-11 Acid Treatment 1863.50 1866.00 0
2003-05-11 Acid Treatment 1858.00 1860.00 0
2003-05-14 Perforation 1849.50 1851.50 17
2003-05-14 Acid Treatment 1849.50 1851.50 0
2016-06-29 Cement Squeeze 1849.50 1851.50 0
2016-06-29 Packing Device Capped w/Cement 1760.00 1847.90 0
1966-09-16 Perforation 1821.80 1823.00 7
1966-09-17 Acid Treatment 1821.80 1823.00 0
1966-11-18 Acid Treatment 1821.80 1823.00 0
1980-11-05 Acid Treatment 1821.80 1823.00 0
1982-11-26 Acid Treatment 1821.80 1823.00 0
1992-02-08 Cement Squeeze 1853.20 1854.40 0
1992-02-11 Perforation 1849.50 1851.00 20

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1966 0 0.0 0.0 0.0
1967 4125 0.0 0.0 0.0
1968 3768 0.0 0.0 0.0
1969 4045 0.0 0.0 0.0
1970 1718 0.0 0.0 0.0
1971 101 0.0 0.0 0.0
1972 614 0.0 0.0 0.0
1973 6 0.0 0.0 0.0
1974 198 0.0 0.0 0.0
1975 4670 0.0 0.0 0.0
1976 3244 0.0 0.0 0.0
1978 4438 0.0 0.0 0.0
1979 8615 0.0 0.0 0.0
1980 8305 0.0 0.0 0.0
1981 8735 0.0 0.0 0.0
1982 8242 0.0 0.0 0.0
1983 8567 0.0 0.0 0.0
1984 4048 0.0 0.0 0.0
1985 7999 0.0 0.0 0.0
1986 8232 0.0 0.0 0.0
1987 8224 0.0 0.0 0.0
1988 8644 0.0 0.0 0.0
1989 6620 0.0 0.0 0.0
1990 7776 0.0 0.0 0.0
1991 8257 0.0 0.0 0.0
1992 6713 0.0 0.0 0.0
1993 8358 0.0 0.0 0.0
1994 8520 0.0 0.0 0.0
1995 8426 0.0 0.0 0.0
1996 8056 0.0 0.0 0.0
1997 8451 0.0 0.0 0.0
1998 8591 0.0 0.0 0.0
1999 8419 0.0 0.0 0.0
2000 8628 0.0 0.0 0.0
2001 8531 0.0 0.0 0.0
2002 8200 0.0 0.0 0.0
2003 2614 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-06-29 No Incident Encountered 0.00 0.00

For data sources see[6]

References