X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394242512000

Well Details

Well ID: 0394242512000
Loading map...
Location: 00/12-25-039-24W4/0
Location Alias: 00/12-25-39-24 W4M
Location Alias 2: 00/12-25-039-24 W4/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 24
Section: 25
County/Municipality: Lacombe County
Well Name: FAIRBORNE CLIVE 12-25-39-24
Operator Name: Tourmaline Oil Corp.
License Number: 0030827
License Date: 1966-08-16
License Status: Suspension
Spud Date: 1966-08-16
Final Drill Date: 1966-08-25
Well Total Depth: 1882.10 m
Surface Hole Latitude: 52.385702
Surface Hole Longitude: -113.337201

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1966-08-16 Obtained License
1966-08-25 Finished Drilling
1966-08-25 Well Mode changed to Drilled and Cased
1966-08-26 Production Casing Operation Performed
1966-08-30 Perforation Treatment Performed - Bullet Perforation
1966-08-31 Perforation Treatment Performed - Acid Wash - No Pressure
1966-09-03 Well Began Production
1966-09-03 Well Fluid changed to Crude Oil
1966-09-03 Well Mode changed to Flowing
1966-09-16 Perforation Treatment Performed - Jet Perforation
1966-09-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-09-18 Well Fluid changed to Crude Oil
1966-09-18 Well Mode changed to Flowing
1966-11-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-11-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-11-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-04-09 Well Fluid changed to Crude Oil
1985-04-09 Well Mode changed to Pumping
1992-02-06 Well Log Performed
1992-02-08 Perforation Treatment Performed - Cement Squeeze
1992-02-10 Well Log Performed
1992-02-11 Perforation Treatment Performed - Jet Perforation
1992-02-12 Well Log Performed
1992-02-13 Perforation Treatment Performed - Jet Perforation
1992-02-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-02-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-02-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-03-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-03-10 Perforation Treatment Performed - Acid Wash - No Pressure
2003-05-03 Perforation Treatment Performed - Cement Squeeze
2003-05-03 Plug Back Performed
2003-05-10 Perforation Treatment Performed - Jet Perforation
2003-05-11 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-05-14 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-05-14 Perforation Treatment Performed - Jet Perforation
2011-12-31 Well Fluid changed to Crude Oil
2011-12-31 Well Mode changed to Suspended
2016-06-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2016-06-29 Perforation Treatment Performed - Cement Squeeze
2016-06-29 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1966-08-30 Bullet Perforation 1853.20 1854.40 7
1992-02-13 Perforation 1820.30 1823.30 20
1992-02-14 Acid Treatment 1820.30 1823.30 0
1992-02-15 Acid Treatment 1820.30 1823.30 0
1992-02-20 Acid Treatment 1820.30 1823.30 0
1992-03-16 Acid Treatment 1820.30 1823.30 0
1998-03-10 Acid Wash 1820.30 1823.30 0
2003-05-03 Cement Squeeze 1849.50 1851.00 0
2003-05-03 Cement Squeeze 1820.30 1823.30 0
2003-05-10 Perforation 1863.50 1866.00 17
2003-05-10 Perforation 1858.00 1860.00 17
1966-08-31 Acid Wash 1853.20 1854.40 0
2003-05-11 Acid Treatment 1863.50 1866.00 0
2003-05-11 Acid Treatment 1858.00 1860.00 0
2003-05-14 Perforation 1849.50 1851.50 17
2003-05-14 Acid Treatment 1849.50 1851.50 0
2016-06-29 Cement Squeeze 1849.50 1851.50 0
2016-06-29 Packing Device Capped w/Cement 1760.00 1847.90 0
1966-09-16 Perforation 1821.80 1823.00 7
1966-09-17 Acid Treatment 1821.80 1823.00 0
1966-11-18 Acid Treatment 1821.80 1823.00 0
1980-11-05 Acid Treatment 1821.80 1823.00 0
1982-11-26 Acid Treatment 1821.80 1823.00 0
1992-02-08 Cement Squeeze 1853.20 1854.40 0
1992-02-11 Perforation 1849.50 1851.00 20

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1966 0 0.0 0.0 0.0
1967 5218 0.0 0.0 0.0
1968 4612 0.0 0.0 0.0
1969 4549 0.0 0.0 0.0
1970 3627 0.0 0.0 0.0
1971 7732 0.0 0.0 0.0
1972 6503 0.0 0.0 0.0
1973 8372 0.0 0.0 0.0
1974 4801 0.0 0.0 0.0
1975 7581 0.0 0.0 0.0
1976 8344 0.0 0.0 0.0
1977 7958 0.0 0.0 0.0
1978 8163 0.0 0.0 0.0
1979 8179 0.0 0.0 0.0
1980 8303 0.0 0.0 0.0
1981 8495 0.0 0.0 0.0
1982 8222 0.0 0.0 0.0
1983 8567 0.0 0.0 0.0
1984 7972 0.0 0.0 0.0
1985 8180 0.0 0.0 0.0
1986 8363 0.0 0.0 0.0
1987 8332 0.0 0.0 0.0
1988 8728 0.0 0.0 0.0
1989 7741 0.0 0.0 0.0
1990 8394 0.0 0.0 0.0
1991 7071 0.0 0.0 0.0
1992 6252 0.0 0.0 0.0
1993 8342 0.0 0.0 0.0
1994 8736 0.0 0.0 0.0
1995 8426 0.0 0.0 0.0
1996 8076 0.0 0.0 0.0
1997 8074 0.0 0.0 0.0
1998 8660 0.0 0.0 0.0
1999 8233 0.0 0.0 0.0
2000 8771 0.0 0.0 0.0
2001 4403 0.0 0.0 0.0
2002 4994 0.0 0.0 0.0
2003 7310 0.0 0.0 0.0
2004 8649 0.0 0.0 0.0
2005 6839 0.0 0.0 0.0
2006 8291 0.0 0.0 0.0
2007 8756 0.0 0.0 0.0
2008 1896 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-06-29 No Incident Encountered 0.00 0.00

For data sources see[6]

References