X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394241412000

Well Details

Well ID: 0394241412000
Loading map...
Location: 00/12-14-039-24W4/0
Location Alias: 00/12-14-39-24 W4M
Location Alias 2: 00/12-14-039-24 W4/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 24
Section: 14
County/Municipality: Lacombe County
Well Name: FAIRBORNE CLIVE 12-14-39-24
Operator Name: Tourmaline Oil Corp.
License Number: 0030628
License Date: 1966-06-27
License Status: Suspension
Spud Date: 1966-06-30
Final Drill Date: 1966-07-12
Well Total Depth: 1941.60 m
Surface Hole Latitude: 52.355964
Surface Hole Longitude: -113.359413

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1966-06-27 Obtained License
1966-07-11 Drill Stem Test Performed
1966-07-11 Lost Circulation Occurred
1966-07-12 Finished Drilling
1966-07-12 Well Mode changed to Drilled and Cased
1966-07-13 Production Casing Operation Performed
1966-07-23 Perforation Treatment Performed - Jet Perforation
1966-07-23 Well Began Production
1966-07-23 Well Fluid changed to Crude Oil
1966-07-23 Well Mode changed to Flowing
1966-08-03 Perforation Treatment Performed - Jet Perforation
1966-08-05 Well Fluid changed to Crude Oil
1966-08-05 Well Mode changed to Flowing
1974-10-01 Well Fluid changed to Crude Oil
1974-10-01 Well Mode changed to Suspended
1977-03-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-03-25 Perforation Treatment Performed - Cement Squeeze
1977-03-25 Well Fluid changed to Crude Oil
1977-03-25 Well Mode changed to Abandoned Zone
1977-04-13 Well Log Performed
1977-04-14 Perforation Treatment Performed - Jet Perforation
1977-04-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-03-02 Perforation Treatment Performed - Cement Squeeze
1992-03-03 Perforation Treatment Performed - Jet Perforation
1992-03-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-03-09 Perforation Treatment Performed - Jet Perforation
1992-03-10 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1966-07-23 Perforation 1883.40 1883.70 13
1992-03-09 Perforation 1905.60 1906.80 16
1992-03-10 Acid Treatment 1903.80 1906.80 0
1966-08-03 Perforation 1914.10 1915.40 13
1977-03-25 Acid Treatment 1883.40 1883.70 0
1977-03-25 Cement Squeeze 1883.40 1883.70 0
1977-04-14 Perforation 1914.10 1915.40 13
1977-04-15 Acid Treatment 1914.10 1915.40 0
1992-03-02 Cement Squeeze 1914.10 1915.40 0
1992-03-03 Perforation 1903.80 1905.60 16
1992-03-05 Acid Treatment 1903.80 1905.60 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1966 0 0.0 0.0 0.0
1967 3121 0.0 0.0 0.0
1968 5049 0.0 0.0 0.0
1969 2331 0.0 0.0 0.0
1970 1364 0.0 0.0 0.0
1975 576 0.0 0.0 0.0
1976 24 0.0 0.0 0.0
1977 859 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1966-07-11 Lost Circulation 1888.20 1888.20

For data sources see[6]

References