X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394241410000

Well Details

Well ID: 0394241410000
Loading map...
Location: 00/10-14-039-24W4/0
Location Alias: 00/10-14-39-24 W4M
Location Alias 2: 00/10-14-039-24 W4/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 24
Section: 14
County/Municipality: Lacombe County
Well Name: FAIRBORNE CLIVE 10-14-39-24
Operator Name: Tourmaline Oil Corp.
License Number: 0030347
License Date: 1966-04-28
License Status: Abandoned
Spud Date: 1966-05-11
Final Drill Date: 1966-05-26
Well Total Depth: 1920.20 m
Surface Hole Latitude: 52.356550
Surface Hole Longitude: -113.349324

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1966-04-28 Obtained License
1966-05-22 Drill Stem Test Performed
1966-05-24 Drill Stem Test Performed
1966-05-26 Finished Drilling
1966-05-26 Well Mode changed to Drilled and Cased
1966-05-27 Production Casing Operation Performed
1966-06-11 Perforation Treatment Performed - Jet Perforation
1966-06-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-06-14 Perforation Treatment Performed - Cement Squeeze
1966-06-15 Perforation Treatment Performed - Jet Perforation
1966-06-19 Well Began Production
1966-06-19 Well Fluid changed to Crude Oil
1966-06-19 Well Mode changed to Pumping
1975-06-19 Well Fluid changed to Crude Oil
1975-06-19 Well Mode changed to Flowing
1975-10-07 Well Fluid changed to Crude Oil
1975-10-07 Well Mode changed to Pumping
1976-01-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-05-01 Well Fluid changed to Crude Oil
1996-05-01 Well Mode changed to Suspended
2001-07-29 Well Log Performed
2001-07-30 Well Log Performed
2001-08-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-08-08 Perforation Treatment Performed - Cement Squeeze
2001-08-08 Plug Back Performed
2001-08-09 Perforation Treatment Performed - Cement Plug
2001-08-09 Perforation Treatment Performed - Jet Perforation
2001-08-09 Perforation Treatment Performed - Remedial Casing
2001-08-09 Well Log Performed
2001-08-10 Perforation Treatment Performed - Cement Plug
2001-08-10 Perforation Treatment Performed - Jet Perforation
2001-08-10 Perforation Treatment Performed - Remedial Casing
2001-08-18 Well Abandoned
2001-08-18 Well Fluid changed to Crude Oil
2001-08-18 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1966-06-11 Perforation 1860.50 1865.40 13
2001-08-09 Cement Plug 1325.00 1381.00 0
2001-08-10 Perforation 249.00 249.80 13
2001-08-10 Remedial Casing Cementing 249.00 249.80 0
2001-08-10 Cement Plug 65.00 249.80 0
1966-06-13 Acid Treatment 1860.50 1865.40 0
1966-06-14 Cement Squeeze 1860.50 1865.40 0
1966-06-15 Perforation 1897.10 1897.70 13
1976-01-22 Acid Treatment 1897.10 1897.70 0
2001-08-08 Cement Squeeze 1897.10 1897.70 0
2001-08-08 Packing Device Capped w/Cement 1817.30 1882.00 0
2001-08-09 Perforation 1380.00 1381.00 13
2001-08-09 Remedial Casing Cementing 1380.00 1381.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1966 0 0.0 0.0 0.0
1967 2148 0.0 0.0 0.0
1968 2776 0.0 0.0 0.0
1969 3885 0.0 0.0 0.0
1970 4625 0.0 0.0 0.0
1975 1564 0.0 0.0 0.0
1976 7910 0.0 0.0 0.0
1977 8452 0.0 0.0 0.0
1978 8255 0.0 0.0 0.0
1979 8561 0.0 0.0 0.0
1980 8507 0.0 0.0 0.0
1981 8687 0.0 0.0 0.0
1982 6988 0.0 0.0 0.0
1983 8468 0.0 0.0 0.0
1984 8359 0.0 0.0 0.0
1985 8064 0.0 0.0 0.0
1986 8099 0.0 0.0 0.0
1987 8476 0.0 0.0 0.0
1988 7310 0.0 0.0 0.0
1989 744 0.0 0.0 0.0

For data sources see[5]

References