X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394241112000

Well Details

Well ID: 0394241112000
Loading map...
Location: 00/12-11-039-24W4/0
Location Alias: 00/12-11-39-24 W4M
Location Alias 2: 00/12-11-039-24 W4/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 24
Section: 11
County/Municipality: Lacombe County
Well Name: FAIRBORNE CLIVE 12-11-39-24
Operator Name: Tourmaline Oil Corp.
License Number: 0030924
License Date: 1966-09-06
License Status: Suspension
Spud Date: 1966-09-13
Final Drill Date: 1966-09-25
Well Total Depth: 1947.70 m
Surface Hole Latitude: 52.341859
Surface Hole Longitude: -113.361210

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1966-09-06 Obtained License
1966-09-25 Finished Drilling
1966-09-25 Well Mode changed to Drilled and Cased
1966-09-26 Production Casing Operation Performed
1966-10-07 Perforation Treatment Performed - Bullet Perforation
1966-10-08 Perforation Treatment Performed - Acid Wash - No Pressure
1966-10-08 Well Began Production
1966-10-08 Well Fluid changed to Crude Oil
1966-10-08 Well Mode changed to Flowing
1970-07-01 Well Fluid changed to Crude Oil
1970-07-01 Well Mode changed to Suspended
1970-07-21 Perforation Treatment Performed - Cement Squeeze
1970-07-28 Perforation Treatment Performed - Open-Hole Completion
1970-07-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-08-27 Well Began Injection
1970-08-27 Well Fluid changed to Water
1970-08-27 Well Type changed to Injection
2001-07-20 Well Log Performed
2001-07-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-07-21 Perforation Treatment Performed - Cement Squeeze
2001-07-21 Plug Back Performed
2001-07-22 Perforation Treatment Performed - Cement Plug
2001-07-22 Perforation Treatment Performed - Jet Perforation
2001-07-22 Perforation Treatment Performed - Remedial Casing
2001-07-22 Well Log Performed
2001-07-23 Perforation Treatment Performed - Cement Plug
2001-07-23 Perforation Treatment Performed - Jet Perforation
2001-07-23 Perforation Treatment Performed - Remedial Casing
2001-07-23 Well Log Performed
2001-07-25 Well Abandoned
2001-07-25 Well Fluid changed to Water
2001-07-25 Well Mode changed to Abandoned and Re-entered
2001-07-25 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1966-10-07 Bullet Perforation 1890.10 1891.30 7
2001-07-22 Cement Plug 488.00 588.00 0
2001-07-23 Perforation 250.00 251.00 13
2001-07-23 Remedial Casing Cementing 250.00 251.00 0
2001-07-23 Cement Plug 172.00 251.00 0
1966-10-08 Acid Wash 1890.10 1891.30 0
1970-07-21 Cement Squeeze 1890.10 1891.30 0
1970-07-28 Open Hole/Barefoot Completion 1916.60 1947.70 0
1970-07-31 Acid Treatment 1916.60 1947.70 0
2001-07-21 Cement Squeeze 1916.60 1947.70 0
2001-07-21 Packing Device Capped w/Cement 1846.00 1905.00 0
2001-07-22 Perforation 587.00 588.00 13
2001-07-22 Remedial Casing Cementing 587.00 588.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1966 0 0.0 0.0 0.0
1967 4850 0.0 0.0 0.0
1968 4351 0.0 0.0 0.0
1969 4499 0.0 0.0 0.0
1970 2458 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0

For data sources see[5]

References