X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394241010000

Well Details

Well ID: 0394241010000
Loading map...
Location: 00/10-10-039-24W4/0
Location Alias: 00/10-10-39-24 W4M
Location Alias 2: 00/10-10-039-24 W4/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 24
Section: 10
County/Municipality: Lacombe County
Well Name: HUBER CLIVE 10-10-39-24
Operator Name: J. M. Huber Corporation
License Number: 0030881
License Date: 1966-08-26
License Status: RecCertified
Spud Date: 1966-08-29
Final Drill Date: 1966-09-10
Well Total Depth: 1914.10 m
Surface Hole Latitude: 52.341809
Surface Hole Longitude: -113.371541

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1966-08-26 Obtained License
1966-09-10 Finished Drilling
1966-09-10 Well Mode changed to Drilled and Cased
1966-09-11 Drill Stem Test Performed
1966-09-12 Drill Stem Test Performed
1966-09-13 Production Casing Operation Performed
1966-09-22 Perforation Treatment Performed - Jet Perforation
1966-09-23 Perforation Treatment Performed - Acid Wash - No Pressure
1966-09-25 Perforation Treatment Performed - Jet Perforation
1966-09-26 Perforation Treatment Performed - Acid Wash - No Pressure
1966-09-28 Perforation Treatment Performed - Cement Squeeze
1966-10-03 Well Began Production
1966-10-03 Well Fluid changed to Crude Oil
1966-10-03 Well Mode changed to Flowing
1979-11-09 Well Fluid changed to Crude Oil
1979-11-09 Well Mode changed to Pumping
1990-04-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-04-03 Plug Back Performed
1990-04-03 Well Fluid changed to Crude Oil
1990-04-03 Well Mode changed to Abandoned
1990-04-04 Perforation Treatment Performed - Jet Perforation
1990-04-04 Perforation Treatment Performed - Remedial Casing
1990-04-11 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1966-09-22 Perforation 1880.90 1885.80 13
1966-09-23 Acid Wash 1880.90 1885.80 0
1966-09-25 Perforation 1848.30 1849.50 13
1966-09-26 Acid Wash 1848.30 1849.50 0
1966-09-28 Cement Squeeze 1848.30 1849.50 0
1990-04-03 Packing Device Capped w/Cement 1863.40 1873.00 0
1990-04-04 Perforation 559.00 560.00 7
1990-04-04 Remedial Casing Cementing 559.00 560.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1966 0 0.0 0.0 0.0
1967 2793 0.0 0.0 0.0
1968 2597 0.0 0.0 0.0
1969 1960 0.0 0.0 0.0
1970 4018 0.0 0.0 0.0
1971 7492 0.0 0.0 0.0
1972 7242 0.0 0.0 0.0
1973 7337 0.0 0.0 0.0
1974 5349 0.0 0.0 0.0
1975 5128 0.0 0.0 0.0
1976 4158 0.0 0.0 0.0
1977 3366 0.0 0.0 0.0
1978 4732 0.0 0.0 0.0
1979 5959 0.0 0.0 0.0
1980 7644 0.0 0.0 0.0
1981 8322 0.0 0.0 0.0
1982 5594 0.0 0.0 0.0
1983 5192 0.0 0.0 0.0
1984 5307 0.0 0.0 0.0
1985 3786 0.0 0.0 0.0
1986 120 0.0 0.0 0.0

For data sources see[5]

References