X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394241001000

Well Details

Well ID: 0394241001000
Loading map...
Location: 00/01-10-039-24W4/0
Location Alias: 00/01-10-39-24 W4M
Location Alias 2: 00/01-10-039-24 W4/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 24
Section: 10
County/Municipality: Lacombe County
Well Name: ENHANCEENERGY CLIVE 1-10-39-24
Operator Name: Enhance Energy Inc.
License Number: 0041235
License Date: 1971-11-05
License Status: Issued
Spud Date: 1971-12-14
Final Drill Date: 1971-12-26
Well Total Depth: 1889.80 m
Surface Hole Latitude: 52.333675
Surface Hole Longitude: -113.365650

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1971-11-05 Obtained License
1971-12-26 Finished Drilling
1971-12-26 Well Mode changed to Drilled and Cased
1971-12-27 Production Casing Operation Performed
1972-01-08 Perforation Treatment Performed - Jet Perforation
1972-01-09 Well Began Production
1972-01-09 Well Fluid changed to Crude Oil
1972-01-09 Well Mode changed to Flowing
1972-06-08 Perforation Treatment Performed - Jet Perforation
1972-06-08 Well Fluid changed to Crude Oil
1972-06-08 Well Mode changed to Flowing
1988-02-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-03-05 Well Fluid changed to Crude Oil
1988-03-05 Well Mode changed to Pumping
1988-09-13 Well Fluid changed to Crude Oil
1988-09-13 Well Mode changed to Pumping
1995-05-11 Well Log Performed
1995-05-13 Perforation Treatment Performed - Cement Squeeze
1995-05-15 Perforation Treatment Performed - Jet Perforation
1995-05-17 Perforation Treatment Performed - Jet Perforation
1995-05-17 Well Log Performed
1996-09-30 Well Fluid changed to Crude Oil
1996-09-30 Well Mode changed to Suspended
2002-10-01 Perforation Treatment Performed - Cement Squeeze
2002-10-09 Perforation Treatment Performed - Cement Squeeze
2002-10-12 Perforation Treatment Performed - Jet Perforation
2002-10-18 Well Fluid changed to Crude Oil
2002-10-18 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1972-01-08 Perforation 1857.50 1858.40 13
2002-10-12 Perforation 1865.40 1867.40 17
1972-06-08 Perforation 1834.90 1835.50 13
1988-02-25 Acid Treatment 1834.90 1835.50 0
1995-05-13 Cement Squeeze 1834.90 1835.50 0
1995-05-15 Perforation 1823.50 1827.00 17
1995-05-17 Perforation 1831.00 1833.00 17
2002-10-01 Cement Squeeze 1823.50 1827.00 0
2002-10-01 Cement Squeeze 1831.00 1833.00 0
2002-10-09 Cement Squeeze 1857.50 1858.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1972 893 0.0 0.0 0.0
1973 2123 0.0 0.0 0.0
1974 2287 0.0 0.0 0.0
1975 640 0.0 0.0 0.0
1976 1702 0.0 0.0 0.0
1977 1998 0.0 0.0 0.0
1978 884 0.0 0.0 0.0
1979 3433 0.0 0.0 0.0
1980 8005 0.0 0.0 0.0
1981 8537 0.0 0.0 0.0
1982 5881 0.0 0.0 0.0
1983 8683 0.0 0.0 0.0
1984 8197 0.0 0.0 0.0
1985 8497 0.0 0.0 0.0
1986 8543 0.0 0.0 0.0
1987 8476 0.0 0.0 0.0
1988 8517 0.0 0.0 0.0
1989 6666 0.0 0.0 0.0
1990 1582 0.0 0.0 0.0
1991 4050 0.0 0.0 0.0
1992 7986 0.0 0.0 0.0
1993 8157 0.0 0.0 0.0
1994 5041 0.0 0.0 0.0
1995 384 0.0 0.0 0.0
2002 1739 0.0 0.0 0.0
2003 8613 0.0 0.0 0.0
2004 7118 0.0 0.0 0.0
2005 4692 0.0 0.0 0.0
2006 4740 0.0 0.0 0.0
2007 4719 0.0 0.0 0.0
2008 4068 0.0 0.0 0.0
2009 4752 0.0 0.0 0.0
2010 5004 0.0 0.0 0.0
2011 5173 0.0 0.0 0.0
2012 2428 0.0 0.0 0.0
2013 3694 0.0 0.0 0.0
2014 4268 0.0 0.0 0.0
2015 4798 0.0 0.0 0.0
2016 5910 0.0 0.0 0.0
2017 3737 0.0 0.0 0.0
2018 2510 0.0 0.0 0.0
2019 1343 0.0 0.0 0.0

For data sources see[5]

References