X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394240308002

Well Details

Well ID: 0394240308002
Loading map...
Location: 00/08-03-039-24W4/2
Location Alias: 00/08-03-39-24 W4M
Location Alias 2: 00/08-03-039-24 W4/02
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 24
Section: 03
County/Municipality: Lacombe County
Well Name: FAIRBORNE CLIVE 8-3-39-24
Operator Name: Tourmaline Oil Corp.
License Number: 0032555
License Date: 1967-07-31
License Status: Suspension
Spud Date: 1967-07-31
Final Drill Date: 1967-08-10
Well Total Depth: 1899.20 m
Surface Hole Latitude: 52.323314
Surface Hole Longitude: -113.366622

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1967-07-31 Obtained License
1967-08-10 Finished Drilling
1967-08-10 Well Mode changed to Drilled and Cased
1967-08-12 Drill Stem Test Performed
1967-08-13 Production Casing Operation Performed
1967-08-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-08-14 Perforation Treatment Performed - Jet Perforation
1967-08-16 Well Began Production
1967-08-16 Well Fluid changed to Crude Oil
1967-08-16 Well Mode changed to Flowing
1979-05-30 Well Fluid changed to Crude Oil
1979-05-30 Well Mode changed to Pumping
1992-05-05 Well Log Performed
1992-05-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-05-06 Perforation Treatment Performed - Cement Squeeze
1992-05-06 Plug Back Performed
1992-05-06 Well Fluid changed to Crude Oil
1992-05-06 Well Mode changed to Pumping
1992-05-14 Perforation Treatment Performed - Jet Perforation
1992-05-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-05-20 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-03-16 Perforation Treatment Performed - Jet Perforation
2007-08-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-08-19 Plug Back Performed
2007-08-19 Well Fluid changed to Crude Oil
2007-08-19 Well Log Performed
2007-08-19 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1967-08-14 Perforation 1845.30 1845.90 13
1992-05-20 Acid Treatment 1839.20 1841.60 0
2003-03-16 Perforation 1409.40 1412.40 14
2007-08-19 Packing Device Capped w/Cement 1823.70 1831.70 0
1967-08-14 Perforation 1868.40 1869.30 13
1967-08-14 Acid Treatment 1845.30 1845.90 0
1967-08-14 Acid Treatment 1868.40 1869.30 0
1992-05-06 Cement Squeeze 1868.40 1869.30 0
1992-05-06 Cement Squeeze 1845.30 1845.90 0
1992-05-06 Packing Device Capped w/Cement 1842.60 1851.30 0
1992-05-14 Perforation 1839.20 1841.60 20
1992-05-19 Acid Treatment 1839.20 1841.60 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1967 342 0.0 0.0 0.0
1968 1729 0.0 0.0 0.0
1969 1159 0.0 0.0 0.0
1970 195 0.0 0.0 0.0
1971 236 0.0 0.0 0.0
1972 1564 0.0 0.0 0.0
1973 4230 0.0 0.0 0.0
1975 3811 0.0 0.0 0.0
1976 6139 0.0 0.0 0.0
1977 6851 0.0 0.0 0.0
1978 6262 0.0 0.0 0.0
1979 8058 0.0 0.0 0.0
1980 7353 0.0 0.0 0.0
1981 8609 0.0 0.0 0.0
1982 7102 0.0 0.0 0.0
1983 8468 0.0 0.0 0.0
1984 8035 0.0 0.0 0.0
1985 8161 0.0 0.0 0.0
1986 1200 0.0 0.0 0.0
1992 4934 0.0 0.0 0.0
1993 8291 0.0 0.0 0.0
1994 7760 0.0 0.0 0.0
1995 8288 0.0 0.0 0.0
1996 7733 0.0 0.0 0.0
1997 7789 0.0 0.0 0.0
1998 8478 0.0 0.0 0.0
1999 8374 0.0 0.0 0.0
2000 8743 0.0 0.0 0.0
2001 7658 0.0 0.0 0.0
2002 7960 0.0 0.0 0.0
2003 1894 0.0 0.0 0.0

For data sources see[5]

References