X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394240308000

Well Details

Well ID: 0394240308000
Loading map...
Location: 00/08-03-039-24W4/0
Location Alias: 00/08-03-39-24 W4M
Location Alias 2: 00/08-03-039-24 W4/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 24
Section: 03
County/Municipality: Lacombe County
Well Name: FAIRBORNE CLIVE 8-3-39-24
Operator Name: Tourmaline Oil Corp.
License Number: 0032555
License Date: 1967-07-31
License Status: Suspension
Spud Date: 1967-07-31
Final Drill Date: 1967-08-10
Well Total Depth: 1899.20 m
Surface Hole Latitude: 52.323314
Surface Hole Longitude: -113.366622

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1967-07-31 Obtained License
1967-08-10 Finished Drilling
1967-08-10 Well Mode changed to Drilled and Cased
1967-08-12 Drill Stem Test Performed
1967-08-13 Production Casing Operation Performed
1967-08-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-08-14 Perforation Treatment Performed - Jet Perforation
1967-08-25 Well Began Production
1967-08-25 Well Fluid changed to Crude Oil
1967-08-25 Well Mode changed to Flowing
1980-02-19 Well Fluid changed to Crude Oil
1980-02-19 Well Mode changed to Pumping
1992-05-05 Well Log Performed
1992-05-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-05-06 Perforation Treatment Performed - Cement Squeeze
1992-05-06 Plug Back Performed
1992-05-06 Well Fluid changed to Crude Oil
1992-05-06 Well Mode changed to Abandoned Zone
1992-05-14 Perforation Treatment Performed - Jet Perforation
1992-05-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-05-20 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-03-16 Perforation Treatment Performed - Jet Perforation
2007-08-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-08-19 Plug Back Performed
2007-08-19 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1967-08-14 Perforation 1845.30 1845.90 13
1992-05-20 Acid Treatment 1839.20 1841.60 0
2003-03-16 Perforation 1409.40 1412.40 14
2007-08-19 Packing Device Capped w/Cement 1823.70 1831.70 0
1967-08-14 Perforation 1868.40 1869.30 13
1967-08-14 Acid Treatment 1845.30 1845.90 0
1967-08-14 Acid Treatment 1868.40 1869.30 0
1992-05-06 Cement Squeeze 1868.40 1869.30 0
1992-05-06 Cement Squeeze 1845.30 1845.90 0
1992-05-06 Packing Device Capped w/Cement 1842.60 1851.30 0
1992-05-14 Perforation 1839.20 1841.60 20
1992-05-19 Acid Treatment 1839.20 1841.60 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1967 206 0.0 0.0 0.0
1968 623 0.0 0.0 0.0
1969 1527 0.0 0.0 0.0
1970 3572 0.0 0.0 0.0
1971 6754 0.0 0.0 0.0
1972 1982 0.0 0.0 0.0
1973 1040 0.0 0.0 0.0
1974 5670 0.0 0.0 0.0
1975 6488 0.0 0.0 0.0
1976 7118 0.0 0.0 0.0
1977 7785 0.0 0.0 0.0
1978 8188 0.0 0.0 0.0
1979 8203 0.0 0.0 0.0
1980 6438 0.0 0.0 0.0
1981 8609 0.0 0.0 0.0
1982 7166 0.0 0.0 0.0
1983 8516 0.0 0.0 0.0
1984 7627 0.0 0.0 0.0
1985 3312 0.0 0.0 0.0
1986 1392 0.0 0.0 0.0

For data sources see[5]

References