If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0394233113000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.400652,"lon":-113.31009,"icon":""}]} |
Location: 00/13-31-039-23W4/0 | |
Location Alias: 00/13-31-39-23 W4M | |
Location Alias 2: 00/13-31-039-23 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 039 | |
Meridian: 4 | |
Range: 23 | |
Section: 31 | |
County/Municipality: Lacombe County | |
Well Name: EMBER ALIX 13-31-39-23 | |
Operator Name: Ember Resources Inc. | |
License Number: 0406885 | |
License Date: 2008-12-22 | |
License Status: Suspension | |
Spud Date: 2009-02-05 | |
Final Drill Date: 2009-02-06 | |
Well Total Depth: 947.00 m | |
Surface Hole Latitude: 52.400652 | |
Surface Hole Longitude: -113.310090 |
Date | Event |
---|---|
2008-12-22 | Obtained License |
2009-02-02 | Well Log Performed |
2009-02-05 | Direction Drilling Operation Performed - Deviate |
2009-02-06 | Finished Drilling |
2009-02-06 | Surface Casing Operation Performed |
2009-02-06 | Well Mode changed to Drilled and Cased |
2009-02-07 | Production Casing Operation Performed |
2009-02-07 | Rig Released |
2009-02-09 | Well Log Performed |
2009-02-16 | Perforation Treatment Performed - Jet Perforation |
2010-10-27 | Well Began Production |
2010-10-27 | Well Fluid changed to Coalbed Methane-Coals Only |
2010-10-27 | Well Mode changed to Flowing |
2010-12-20 | Perforation Treatment Performed - Fractured |
2012-03-28 | Well Fluid changed to Coalbed Methane-Coals Only |
2012-03-28 | Well Mode changed to Suspended |
2012-09-13 | Well Fluid changed to Coalbed Methane-Coals Only |
2012-09-13 | Well Mode changed to Flowing |
2014-09-01 | Well Fluid changed to Coalbed Methane-Coals Only |
2014-09-01 | Well Mode changed to Suspended |
2017-11-10 | Perforation Treatment Performed - Jet Perforation |
2017-11-10 | Well Log Performed |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2009-02-05 | 0.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2009-02-16 | Perforation | 603.50 | 604.50 | 13 |
2009-02-16 | Perforation | 524.70 | 525.70 | 13 |
2009-02-16 | Perforation | 523.20 | 523.70 | 13 |
2009-02-16 | Perforation | 504.80 | 505.80 | 13 |
2009-02-16 | Perforation | 496.30 | 496.80 | 13 |
2009-02-16 | Perforation | 494.00 | 495.00 | 13 |
2009-02-16 | Perforation | 492.00 | 493.00 | 13 |
2009-02-16 | Perforation | 482.10 | 482.60 | 13 |
2009-02-16 | Perforation | 479.00 | 480.00 | 13 |
2009-02-16 | Perforation | 461.10 | 463.60 | 13 |
2009-02-16 | Perforation | 457.10 | 457.60 | 13 |
2009-02-16 | Perforation | 595.20 | 596.20 | 13 |
2009-02-16 | Perforation | 454.80 | 456.30 | 13 |
2009-02-16 | Perforation | 418.40 | 418.90 | 13 |
2009-02-16 | Perforation | 404.50 | 405.00 | 13 |
2009-02-16 | Perforation | 390.60 | 391.30 | 13 |
2009-02-16 | Perforation | 364.10 | 364.60 | 13 |
2009-02-16 | Perforation | 348.90 | 349.90 | 13 |
2010-12-20 | Fracture | 603.50 | 604.50 | 0 |
2010-12-20 | Fracture | 348.90 | 596.20 | 0 |
2017-11-10 | Perforation | 433.00 | 435.00 | 13 |
2017-11-10 | Perforation | 546.50 | 549.00 | 13 |
2009-02-16 | Perforation | 590.70 | 591.70 | 13 |
2017-11-10 | Perforation | 650.50 | 652.50 | 13 |
2017-11-10 | Perforation | 678.00 | 681.00 | 13 |
2009-02-16 | Perforation | 589.10 | 590.10 | 13 |
2009-02-16 | Perforation | 567.30 | 568.30 | 13 |
2009-02-16 | Perforation | 574.90 | 575.40 | 13 |
2009-02-16 | Perforation | 570.50 | 571.50 | 13 |
2009-02-16 | Perforation | 552.40 | 552.90 | 13 |
2009-02-16 | Perforation | 534.60 | 535.60 | 13 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 1283 | 0.0 | 0.0 | 0.0 |
2011 | 2553 | 0.0 | 0.0 | 0.0 |
2012 | 745 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2017-11-10 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]