X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394233110000

Well Details

Well ID: 0394233110000
Loading map...
Location: 00/10-31-039-23W4/0
Location Alias: 00/10-31-39-23 W4M
Location Alias 2: 00/10-31-039-23 W4/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 23
Section: 31
County/Municipality: Lacombe County
Well Name: DEVON ALIX 10-31-39-23
Operator Name: Devon Canada Corporation
License Number: 0021164
License Date: 1961-08-08
License Status: RecCertified
Spud Date: 1961-08-16
Final Drill Date: 1961-09-05
Well Total Depth: 1836.40 m
Surface Hole Latitude: 52.399586
Surface Hole Longitude: -113.300558

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1961-08-08 Obtained License
1961-08-25 Drill Stem Test Performed
1961-09-01 Drill Stem Test Performed
1961-09-04 Drill Stem Test Performed
1961-09-05 Finished Drilling
1961-09-05 Well Mode changed to Drilled and Cased
1961-09-06 Production Casing Operation Performed
1961-09-12 Perforation Treatment Performed - Jet Perforation
1961-09-13 Perforation Treatment Performed - Acid Wash - No Pressure
1961-09-14 Well Began Production
1961-09-14 Well Fluid changed to Crude Oil
1961-09-14 Well Mode changed to Flowing
1971-02-10 Well Fluid changed to Crude Oil
1971-02-10 Well Mode changed to Pumping
1983-08-16 Perforation Treatment Performed - Cement Squeeze
1983-08-18 Perforation Treatment Performed - Jet Perforation
1983-08-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-11-14 Well Log Performed
1991-11-20 Perforation Treatment Performed - Cement Squeeze
1991-11-21 Well Log Performed
1991-11-22 Perforation Treatment Performed - Jet Perforation
1991-11-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-08-01 Well Fluid changed to Crude Oil
1994-08-01 Well Mode changed to Suspended
1996-01-30 Well Log Performed
1996-01-31 Well Log Performed
1996-02-03 Well Log Performed
1996-02-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-02-04 Perforation Treatment Performed - Cement Squeeze
1996-02-07 Perforation Treatment Performed - Jet Perforation
1996-02-07 Well Log Performed
1996-02-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-02-08 Well Fluid changed to Crude Oil
1996-02-08 Well Mode changed to Pumping
1996-09-30 Well Fluid changed to Crude Oil
1996-09-30 Well Mode changed to Suspended
1997-10-01 Well Fluid changed to Crude Oil
1997-10-01 Well Mode changed to Pumping
2001-02-01 Well Fluid changed to Crude Oil
2001-02-01 Well Mode changed to Suspended
2001-06-21 Well Log Performed
2001-06-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-06-23 Plug Back Performed
2001-06-25 Well Log Performed
2001-06-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-06-27 Perforation Treatment Performed - Cement Plug
2001-06-28 Perforation Treatment Performed - Cement Plug
2001-06-28 Well Log Performed
2001-06-29 Perforation Treatment Performed - Cement Plug
2001-06-29 Perforation Treatment Performed - Jet Perforation
2001-06-29 Perforation Treatment Performed - Remedial Casing
2001-07-01 Well Abandoned
2001-07-01 Well Fluid changed to Crude Oil
2001-07-01 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1961-09-12 Perforation 1810.50 1811.10 13
1996-02-04 Cement Squeeze 1805.90 1806.90 0
1996-02-07 Perforation 1799.50 1801.00 10
1996-02-08 Acid Treatment 1799.50 1801.00 0
2001-06-23 Packing Device Capped w/Cement 1782.00 1790.00 0
2001-06-26 Packing Device Capped w/Cement 786.50 800.00 0
2001-06-27 Cement Plug 498.00 621.00 0
2001-06-28 Cement Plug 380.00 497.50 0
2001-06-29 Perforation 333.00 334.00 13
2001-06-29 Remedial Casing Cementing 333.00 334.00 0
2001-06-29 Cement Plug 264.00 334.00 0
1961-09-13 Acid Wash 1810.50 1811.10 0
1983-08-16 Cement Squeeze 1810.50 1811.10 0
1983-08-18 Perforation 1807.90 1808.80 13
1983-08-19 Acid Treatment 1807.90 1808.80 0
1991-11-20 Cement Squeeze 1807.90 1808.80 0
1991-11-22 Perforation 1805.90 1806.90 20
1991-11-26 Acid Treatment 1805.90 1806.90 0
1996-02-04 Acid Treatment 1805.90 1806.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 2 0.0 0.0 0.0
1969 1674 0.0 0.0 0.0
1970 4191 0.0 0.0 0.0
1971 7358 0.0 0.0 0.0
1972 7784 0.0 0.0 0.0
1973 8070 0.0 0.0 0.0
1974 6622 0.0 0.0 0.0
1975 8115 0.0 0.0 0.0
1976 8364 0.0 0.0 0.0
1977 7730 0.0 0.0 0.0
1978 8040 0.0 0.0 0.0
1979 8488 0.0 0.0 0.0
1980 6232 0.0 0.0 0.0
1981 7893 0.0 0.0 0.0
1982 4634 0.0 0.0 0.0
1983 5898 0.0 0.0 0.0
1984 6768 0.0 0.0 0.0
1985 4932 0.0 0.0 0.0
1986 3568 0.0 0.0 0.0
1987 2412 0.0 0.0 0.0
1988 2360 0.0 0.0 0.0
1989 4092 0.0 0.0 0.0
1990 3266 0.0 0.0 0.0
1991 698 0.0 0.0 0.0
1992 7605 0.0 0.0 0.0
1993 1608 0.0 0.0 0.0
1994 1824 0.0 0.0 0.0
1996 2999 0.0 0.0 0.0
1997 1399 0.0 0.0 0.0
1998 408 0.0 0.0 0.0
1999 2207 0.0 0.0 0.0

For data sources see[5]

References