If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0394230905000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.338852,"lon":-113.253334,"icon":""}]} |
Location: 00/05-09-039-23W4/0 | |
Location Alias: 00/05-09-39-23 W4M | |
Location Alias 2: 00/05-09-039-23 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 039 | |
Meridian: 4 | |
Range: 23 | |
Section: 09 | |
County/Municipality: Lacombe County | |
Well Name: EMBER ALIX 5-9-39-23 | |
Operator Name: Ember Resources Inc. | |
License Number: 0435881 | |
License Date: 2011-08-10 | |
License Status: Issued | |
Spud Date: 2011-10-23 | |
Final Drill Date: 2011-10-24 | |
Well Total Depth: 1002.00 m | |
Surface Hole Latitude: 52.338852 | |
Surface Hole Longitude: -113.253334 |
Date | Event |
---|---|
2011-08-10 | Obtained License |
2011-10-23 | Direction Drilling Operation Performed - Deviate |
2011-10-23 | Surface Casing Operation Performed |
2011-10-24 | Finished Drilling |
2011-10-24 | Production Casing Operation Performed |
2011-10-24 | Well Mode changed to Drilled and Cased |
2011-10-25 | Rig Released |
2011-11-02 | Well Log Performed |
2011-11-17 | Perforation Treatment Performed - Jet Perforation |
2011-11-21 | Perforation Treatment Performed - Fractured |
2011-11-24 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-11-24 | Well Mode changed to Testing |
2011-12-03 | Well Began Production |
2011-12-03 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-12-03 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-10-23 | 0.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-11-17 | Perforation | 270.20 | 270.70 | 13 |
2011-11-17 | Perforation | 415.20 | 416.20 | 13 |
2011-11-17 | Perforation | 421.40 | 422.90 | 13 |
2011-11-17 | Perforation | 433.50 | 434.50 | 13 |
2011-11-17 | Perforation | 438.60 | 439.60 | 13 |
2011-11-17 | Perforation | 442.70 | 443.20 | 13 |
2011-11-17 | Perforation | 445.20 | 446.20 | 13 |
2011-11-17 | Perforation | 448.20 | 448.70 | 13 |
2011-11-17 | Perforation | 452.00 | 452.50 | 13 |
2011-11-17 | Perforation | 477.00 | 478.00 | 13 |
2011-11-17 | Perforation | 493.80 | 494.80 | 13 |
2011-11-17 | Perforation | 272.30 | 272.80 | 13 |
2011-11-17 | Perforation | 502.60 | 503.60 | 13 |
2011-11-17 | Perforation | 503.80 | 507.30 | 13 |
2011-11-17 | Perforation | 508.50 | 509.00 | 13 |
2011-11-17 | Perforation | 510.60 | 511.10 | 13 |
2011-11-17 | Perforation | 512.50 | 515.00 | 13 |
2011-11-17 | Perforation | 522.10 | 523.10 | 13 |
2011-11-17 | Perforation | 539.10 | 541.10 | 13 |
2011-11-17 | Perforation | 542.40 | 543.40 | 13 |
2011-11-17 | Perforation | 556.60 | 557.10 | 13 |
2011-11-17 | Perforation | 560.40 | 561.40 | 13 |
2011-11-17 | Perforation | 289.60 | 290.10 | 13 |
2011-11-17 | Perforation | 567.40 | 568.90 | 13 |
2011-11-17 | Perforation | 581.00 | 584.50 | 13 |
2011-11-17 | Perforation | 589.90 | 591.40 | 13 |
2011-11-17 | Perforation | 597.70 | 598.20 | 13 |
2011-11-17 | Perforation | 598.40 | 598.90 | 13 |
2011-11-17 | Perforation | 603.60 | 604.10 | 13 |
2011-11-17 | Perforation | 605.40 | 605.60 | 13 |
2011-11-17 | Perforation | 609.00 | 610.00 | 13 |
2011-11-17 | Perforation | 650.00 | 651.00 | 13 |
2011-11-17 | Perforation | 651.20 | 652.70 | 13 |
2011-11-17 | Perforation | 318.00 | 319.50 | 13 |
2011-11-17 | Perforation | 807.20 | 808.20 | 13 |
2011-11-21 | Fracture | 270.20 | 605.60 | 0 |
2011-11-17 | Perforation | 334.90 | 338.40 | 13 |
2011-11-17 | Perforation | 357.30 | 357.80 | 13 |
2011-11-17 | Perforation | 361.60 | 363.10 | 13 |
2011-11-17 | Perforation | 396.30 | 396.80 | 13 |
2011-11-17 | Perforation | 411.50 | 412.00 | 13 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 696 | 0.0 | 0.0 | 0.0 |
2012 | 8176 | 0.0 | 0.0 | 0.0 |
2013 | 8394 | 0.0 | 0.0 | 0.0 |
2014 | 8532 | 0.0 | 0.0 | 0.0 |
2015 | 8754 | 0.0 | 0.0 | 0.0 |
2016 | 8753 | 0.0 | 0.0 | 0.0 |
2017 | 8676 | 0.0 | 0.0 | 0.0 |
2018 | 8742 | 0.0 | 0.0 | 0.0 |
2019 | 8700 | 0.0 | 0.0 | 0.0 |
2020 | 2171 | 0.0 | 0.0 | 0.0 |
For data sources see[6]