X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394142216060

Well Details

Well ID: 0394142216060
Loading map...
Location: 06/16-22-039-14W4/0
Location Alias: 06/16-22-39-14 W4M
Location Alias 2: 06/16-22-039-14 W4/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 14
Section: 22
County/Municipality: County of Paintearth No. 18
Well Name: CPEC PROVOST 16-22-39-14
Operator Name: Crescent Point Energy Corp.
License Number: 0187091
License Date: 1996-04-03
License Status: Abandoned
Spud Date: 1996-07-04
Final Drill Date: 1996-07-16
Well Total Depth: 2286.00 m
Surface Hole Latitude: 52.362409
Surface Hole Longitude: -111.926805

For data sources see[1][2]

Well History

Date Event
1996-04-03 Obtained License
1996-07-05 Surface Casing Operation Performed
1996-07-07 Direction Drilling Operation Performed - Horizontal
1996-07-09 Production Casing Operation Performed
1996-07-09 Well Log Performed
1996-07-16 Finished Drilling
1996-07-16 Well Mode changed to Drilled and Cased
1996-07-17 Perforation Treatment Performed - Open-Hole Completion
1996-07-17 Rig Released
1996-07-29 Well Began Production
1996-07-29 Well Fluid changed to Crude Oil
1996-07-29 Well Mode changed to Pumping
1996-08-06 Well Log Performed
1998-09-30 Well Fluid changed to Crude Oil
1998-09-30 Well Mode changed to Suspended
1998-11-01 Well Fluid changed to Crude Oil
1998-11-01 Well Mode changed to Pumping
2002-06-30 Well Fluid changed to Crude Oil
2002-06-30 Well Mode changed to Suspended
2014-01-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-01-13 Plug Back Performed
2014-01-13 Well Fluid changed to Crude Oil
2014-01-13 Well Log Performed
2014-01-13 Well Mode changed to Abandoned Zone
2014-01-14 Well Log Performed
2014-09-11 Well Abandoned
2014-09-11 Well Fluid changed to Crude Oil
2014-09-11 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1996-07-07 882.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-07-17 Open Hole/Barefoot Completion 1148.00 2286.00 0
2014-01-13 Packing Device Capped w/Cement 936.80 946.80 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 3561 0.0 0.0 0.0
1997 7696 0.0 0.0 0.0
1998 36 0.0 0.0 0.0
1999 288 0.0 0.0 0.0
2000 4809 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-01-12 No Incident Encountered 0.00 0.00

For data sources see[7]

References